| 1 | \"Taking out existing CC interlocking paver blocks from footpath/ central verge, including removal of rubbish etc., disposal of unserviceable material to the dumping ground, for which payment shall be made separately and stacking of serviceable material within 50 meter lead as per direction of Engineer-in-Charge.\" |
| 2 | Demolishing cement concrete manually/by mechanical means including disposal of material within 50 meters lead as per direction of Engineer-incharge:1:3:6 or richer mix (i/c equivalent design mix) |
| 3 | Demolishing R.C.C. work manually/by mechanical means including stacking of steel bars and disposal of unserviceable material within 50 meters lead as per direction of Engineer-in-charge. |
| 4 | Earth work in Excavation by manual means over areas ( exceeding 30cm and up to 1.5 mtr in depth, 1.5 mtr in width as well as 10 sqm on plan) including disposal of excavated earth up to 1 mtr from cutting edge, disposed earth is to be leveled and neatly dressed in All kinds of soils. |
| 5 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:5:10 (1 cement : 5 coarse sand : 10 graded stone aggregate 40 mm nominal size) |
| 6 | \"Providing and laying in position cement concrete of specified grade including curing butexcluding the cost of centring and shuttering. All work upto plinth level with: 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size)\". |
| 7 | Providing and laying in position specified grade of reinforced cement concrete including curing but excluding the cost of centering, shuttering, finishing and reinforcement. All works upto plinth level 1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size) |
| 8 | \"Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing inposition and binding all complete upto plinth level Thermo-Mechanically Treated bars of grade Fe-500Dor more\" |
| 9 | Centering and Shuttering including strutting, propping etc. and removal of Formwork for foundation complete job |
| 10 | Steel work welded in built up sections/framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steelprimer using structural steel etc. as required. In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works. |
| 11 | 12mm thick cement plaster of mix 1:4 |
| 12 | P/F of 60mm thick interlocking paver tile to be laid in cement mortar 1:4 mix & fill joint with C.mortar 1:3 mix complete job |
| 13 | P/F of 60mm thick interlocking paver tile to be laid in cement mortar 1:4 mix & fill joint with C.mortar 1:3 mix complete job (old tiles) |
| 14 | Removal of Excavated Malba dismantled unserviceable material from site of work. |
| 15 | Providing and Laying DPC 50mm thick with cement concrete 1:2:4 |
| 16 | Providing and Fixing of inaguration stone |
| 17 | Carriage of constructed material (sand + Aggregate) Please Enable Macros to View BoQ information |