| 1 | Engagment of labour for site clearance, dewatering etc. complete all job |
| 2 | Demolishing R.C.C. work manually/by mechanical means includingstacking of steel bars and disposal of unserviceable material within50 meters lead as per direction of Engineer-in-charge. |
| 3 | Demolishing cement concrete manually/by mechanical means includingdisposal of material within 50 meters lead as per direction ofEngineer-in_charge:1:3:6 or richer mix (i/c equivalentdesign mix) |
| 4 | Dismantling tile work in floors and roofs laid in cement mortar includingstacking material within 50 meters lead.For thickness of tiles above 25 mm and upto 40 mm. |
| 5 | \"Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering.All work upto plinth level with: 1:5:10 (1 cement : 5 coarse sand : 10 graded stone aggregate 40 mmnominal size) |
| 6 | Providing and laying in position cement concrete of specified grade including curing butexcluding the cost of centring and shuttering. All workupto plinth level with 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) |
| 7 | \"Providing and laying in position specified grade of reinforced cement concrete including curing but excluding the cost of centering,shuttering, finishing and reinforcement. All works upto plinth level 1:1½:3(1 cement : 1½ coarse sand : 3 graded stoneaggregate 20 mm nominal size)\" |
| 8 | \"Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing inposition and binding all complete upto plinth level Thermo-Mechanically Treated bars of grade Fe-500Dor more\" |
| 9 | Centering and Shuttering including strutting, propping etc. and removal of Formwork for foundation complete job |
| 10 | Steel work welded in built up sections/framed work, including cutting, hoisting, fixing in position and applying a priming coat ofapproved steelprimer using structural steel etc. asrequired. In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works. |
| 11 | Removal of Excavated Malba dismantled unserviceable material from site of work. |
| 12 | \"Carriage of materials by mechanical transport including loading / unloading & stacking complete.• Sand/Crusher Dust/stone Aggreagte for an average distance 10 Km by MT.\" |
| 13 | P/F of 60mm thick interlocking paver tile to be laid in cement mortar 1:4 mix & fill joint with C.mortar 1:3 mix complete job |
| 14 | 12mm Cement plaster of mix 1 : 6 ( 1 cement : 6 fine sand) |
| 15 | Providing and laying damp-proof Course 50 mm thick with cement concrete 1:2:4 (1cement:2 coarse sand: 4 graded stone aggregate 20mm nominal size) and curing complete |
| 16 | Providing and fixing of inauguration plate |
| 17 | Taking out existing CC interlocking paver blocks from footpath/ central verge, including removal of rubbish etc., disposal of unserviceable material to the dumping ground, for which payment shall be made separately and stacking of serviceable material within 50 meter lead as per direction of Engineer-in-Charge. |
| 18 | Laying old cement concrete interlocking paver blocks of any design/ shape laid in required line, level, curvature, colour and pattern overand including 50 mm thick compacted bed of coarse sand, filling the joints with fine sand etc.all complete as per the direction of Engineer-in-charge Please Enable Macros to View BoQ information |