| 1 | Construction of embankment with material obtained from borrow pits with a lift upto 1.5 m, transporting to site, spreading, grading to required slope and compacting to meet requirement of Tables 300.1 and 300.2 with a lead upto 1000 m as per Technical Specification Clause 301.5 & MORD specification Sr N0-3.4 (GST will be paid extra as applicable but including labour cess) |
| 2 | CTSB- Providing, Laying and spreading Material on a prepared sub grade, adding cement (OPC) @ 2% by weight to the spread material, manully, mixing in place with rotavator and compaction with the road roller at OMC to achive the desired unconfined compressive strength and to from a layar sub-base. (GST will be paid extra as applicable but including labour cess) |
| 3 | CTB- Providing, Laying and spreading Material on a prepared sub-base, adding cement (OPC) @ 4% by weight to the spread material, manully, mixing in place with rotavator and compaction with the road roller at OMC to achive the desired unconfined compressive strength and to from a layar base. (GST will be paid extra as applicable but including labour cess) |
| 4 | Tack Coat- Providing and applying tack coat with bitumen VG- 10 grade using pressure distributor at the rate of 0.35 kg per sqm on the prepared bituminous/ granular surface cleaned with mechanical broom. As per T.S.C. 503 & MORD specification Sr N0-5.2(IV). (GST will be paid extra as applicable but including labour cess & Bitumen. |
| 5 | Premix Carpet- Providing, laying and rolling of open - graded premix surfacing of 20 mm thickness composed of 13.2 mm and 11.2 mm aggregates (Dala quarry) either using VG-10 grade bitumen to required line grade and level to serve as wearing coarse on a previously prepared base by manual means including mixing in a sutabule mixol laying and rolling with a smooth wheeled roller 8-10 tonne capacity, finished to required level and grades. as per T.S.C. 508. & MORD specification Sr No-5.9 (GST will be paid extra as applicable but including labour cess & Bitumen. |
| 6 | Seal Coat type C- Providing and laying seal coat by manual means with VG- 10 grade Bitumen sealing the voids in a bituminous surface laid to the specified levels, grade and cross fall using Type C as per T.S.C. 510 & MORD specification Sr. N0-5.12 (GST will be paid extra as applicable but including labour cess & Bitumen. |
| 7 | Earth work in excavation of foundation of structure as per drawing and technincal specification including setting out construction fo shoring and bracing, removal of stumps and others deleterious matter, dressing of sites and bottom and back filling with approved material. As per MoRTH Specification 304 & Sr No-12.01(I)B (GST will be paid extra as applicable but including labour cess) |
| 8 | Providing and laying of Granular material (GSB) filling including cost of all material, labour, T&P etc. required for proper completion of the work. MoRTH specification Clause-304 & Sr No-12.03 (GST will be paid extra as applicable but including labour cess) |
| 9 | Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days. As per MoRTH Specification 2100 & Sr No-12.04 using batching plant (GST will be paid extra as applicable but including labour cess) |
| 10 | Plain/Reinforced Cement Concrete (M30) in Open Foundation complete as per Drawing and Technical as per MoRTH Specifications clauses 1500,1700 & 2200 and Sr N0-12.08G using batching plant (GST will be paid extra as applicable but including labour cess) |
| 11 | Plain/Reinforced Cement Concrete (M20) in Open Foundation complete as per Drawing and Technical as per MoRTH Specifications clauses 1500,1700 & 2200 and Sr. No.-12.08 B sub analysis using batching Transit mixer (GST will be paid extra as applicable but including labour cess) |
| 12 | Providing weep holes in Brick masonry /Plain/ Reinforced concrete abutment wing wall / return wall with 100mm dia pipe, extending through the full width of the structure with slope of 1v:20h towards face. As per MoRTH Specification Clause 2706 & 2200. and Sr. No.-13.08 (GST will be paid extra as applicable but including labour cess) |
| 13 | (M30) Furnishing and Placing Reinforced/ Prestressed cement concrete in super-structure as per drawing and Technical Specification 1500, 1600 & 1700 and MoRTH Sr No-14.01C sub analysis using batching plant transit mixer (GST will be paid extra as applicable but including labour cess) |
| 14 | Supplying, fitting and placing HYSD TMT bar reinforcement in Foundation,sub structure and super structure complete as per drawing and technical specifications 1600 and MoRTH Sr. No-12.42 (GST will be paid extra as applicable but including labour cess) |
| 15 | Providing and laying Cement concrete wearing coat M-35 grade including reinforcement complete as per drawing and Technical Specification 2702 & MoRTH Sr No-14.04 sub analysis (GST will be paid extra as applicable but including labour cess) |
| 16 | Back filling behind abutment wing wall & Returnwall Complete as per drawing & technical specification Clause-710.1.4 of/RC 78 & 2200 and MoRTH Sr. No. 15.23 (GST will be paid extra as applicable but including labour cess) |
| 17 | Providing & fixing 20 mm thick compressible fibre board in expansion joint complete as per drawing & technical specification & MoRTH S.No. 14.17 (II) (GST will be paid extra as applicable but including labour cess) |
| 18 | Providing & applying two coats of water based cement paint to unplastered concrete surface after cleaning the surface of dirt, dust, oil, grease effloresecence and applying paint @ 1 litre for two sqm. As speicification Clause 800 & MoRTH Sr.No. 14.16 (GST will be paid extra as applicable but including labour cess) |
| 19 | Boulder Apron Laid dry without Wire Crates- Providing and laying of boulder apron on river bed for protection against scour with stone boulders weighing not less than 40kg each complete as per drawing and technical specification. 2503 & MoRTH Sr N0-16.01 (GST will be paid extra as applicable but including labour cess) |
| 20 | Construction of granular sub-base by providing well graded material, spreading in uniform layers with motor grader/Tractor mounted appropriate equipment on prepaire suface mixing by mix in place method with rotavator at OMC, and compacting with smooth roller to achieve the desired density, complete as MoRD Specification clause 401 & Sr. No. 4.1 (GST will be paid extra as applicable but including labour cess) |
| 21 | Providing and Laying 600MM Dia RCC Hume Pipes NP-3 including collars/spigot & Socketed Type joint, Confirming to BIS specification as per SI 458:2003 S. No. 60 (GST will be paid extra as applicable but including labour cess) |
| 22 | Dismantling Reinforced cement concrete or reinforced brick work, including stacking of dismantled materials as directed by the Engineer-in-charge within a distance of 60 M. asper SI. NO. 694. (GST will be paid extra as applicable but including labour cess) |
| 23 | Dismantling brick work or stone work in lime or cement mortar and including stacking of material as directed by the Engineer-in-charge within a distance of 60m. (200 ft) As per S.I. No. 692 (GST will be paid extra as applicable but including labour cess) Please Enable Macros to View BoQ information |