|
| 1 | Demolition including stacking of serviceable materilas and disposal of unserviceable materials with all lead and lift. (i) R.C.C. work |
| 2 | Demolition of Brick work and stone masonry including stacking of serviceable materilas and disposal of unserviceable materials with all lead and lift.(ii) In Cement Mortar. |
| 3 | Dismentling steel work including distempering and stacking the materials with all lead and lift |
| 4 | Supplying material and labour for filling with good quality garden soil obtained from outside, including watering, ramming well, consolidating, compacting dressing and maintenance for 2 months etc. complete, as directed. Dressing and leveling the area by spreading 2\"-3\" of good quality soil & manual compaction as required and as approved by EIC. |
| 5 | Filling in foundation and plinth with murrum or selected soil in layers of 20cm. thickness including watering, ramming and consolidating etc. complete. |
| 6 | Excavation for foundation upto 1.5 m depth including sortingoutandstacking of useful materials anddisposing off the excavated stuff upto 50 Meter lead.(C)HardMurrum |
| 7 | Excavation for foundation fordepth from1.5 mto3.0 m includingsortingoutandstacking of useful materials anddisposing off theexcavated stuffupto 50 Meterlead.(C)HardMurrum |
| 8 | Filling available excavatedearth (excluding rock) intrenches.plinth, sides of foundations etc. in layers not exceeding 20 cm. in depthconsolidating each dispositedlayer by ramming and watering. |
| 9 | Providing material and labour for laying Plain cement concrete M15 in Foundation and Plinth including cost of formwork, compacting, finishing, curing etc complete for all level, all height/ depth as directed by engineer in charge. |
| 10 | Providing and laying controlled cement concrete M.250 andcuring complete excludingthe cost of formwork and reinforcement for reinforced concrete work in (A) Foundations,footings, Baseof columnsandMassconcrete. (upto 10 ton) |
| 11 | Providing formwork of ordinary timber planking so as to give a rough finish including centering shuttering strutting and propping etc. Height of propping and centering below supporting floor to ceilingnotexceeding 4 M. and removal of the same for in situ reinforced concrete and plain concrete work in. (A) Foundations Footings Bases ofColumns etc. and Mass concrete. (upto 10 ton) |
| 12 | Providing and laying controlled cement concrete M.250 andcuring complete includingthe cost of formwork and reinforcement for reinforced concrete work in (D) Columns, Pillars posts and struts, upto floor two level. (upto 10 ton) |
| 13 | Providing and laying controlled cement concrete M.250 andcuring complete includingthe cost of formwork and excluding cost of reinforcement for reinforced concrete work in Lintels,Beams, Girders and Cantilever upto floor two level etc complete as directed by Engineer-incharge. |
| 14 | Providing and laying controlled cement concrete M.250 and curing complete excluding the cost offormwork andreinforcement for reinforced concrete work in ©Slabs,landing,shelves,Balconies, Lintels, Beams, Girdersand Cantilever upto floor two level |
| 15 | Providing and laying controlled cement concrete M.250and curing complete excluding the cost of formwork andreinforcement for reinforced concrete work in (B) Walls,from top of foundation level upto floor two level |
| 16 | Providing TMT Bar FE 500/500D reinforcement for R.C.C. work including bending, binding and placing in position complete upto floor two level (upto 10 ton) |
| 17 | Brick work using common burnt clay building bricks having crushing strength not less than 35 kg./Sq.Cm. in Above plinth level upto floor level two in Cement Mortar 1:6(1- Cement : 6 -fine sand)(B) Conventional (upto 10 ton) |
| 18 | 20mm thick sand faced cement plaster on walls uptoheight 10 metres above ground level consisting of 12mmthick backing coat of C.M. 1:3 (1-cement : 3-sand) and8mm thick finishing coat of C.M. 1:1 (1-cement : 1-sand) etc. complete. |
| 19 | Finishing wall with weather proof exterior emulsion paint on wall surface (two coats) to give an required shape even shade after thoroughly brushing the surface to remove all dirt, and remains of loose powdered materials.etc complete |
| 20 | Steel work, welded in built up sections framed work including cutting, hoisting, fixing in position and applying a priming coat of read lead paint.For Wallcmpound Gate And Grill work work at above wall. |
| 21 | Painting two coats (excluding priming coat) on new steel and other metal surface with enamel paint, brushing, interior to give an even shade including cleaning the surface an even shade including cleanicn the surface of all dirt, dust and other foreign matter. |
| 22 | Construction of granular Sub baseby providing close graded Material, mixing in a mechanical mix plant at OMC, carriage of mixed Materialto work site, spreading in uniform layers with motor grader on prepared surface and compacting with vibratory power roller to achieve the desired density, complete as per clause401, (As per Code No.4-1 NH SOR 2023-24) |
| 23 | Providing and Fixing Pre-cast concrete Block made by M40 grade concrete 60mm thick STRADA GREY DL in Wibropress machine 60mm in shot blasted finish with minimum average 400 kg/cm2 compressive strength at 28 days including 75mm sand layer for levelingand finishing the joint with sand in proper line and level etc. complete as directed by Engineer in charge. |
| 24 | Manufactture, supply ofR.C.C. Precast Kerb Stone -K - HB GREY SL VWP 600 x 300 x 150 mm with minimum average 2 Mpa bending strength at 28 days HSN : 68101190 as per specification and drawing attached with the tender document for sizes as mentioned.Therates included all taxes, loading, carting, unloading, stacking etc. complete. |
| 25 | Manufactture, supply ofR.C.C. Precast- DISHED CHANNEL GREY VWP 600 x 300 x 100 mm with minimum average 2 Mpa bending strength at 28 days HSN : 68101190 as per specification and drawing attached with the tender document for sizes as mentioned.Therates included all taxes, loading, carting, unloading, stacking etc. complete. |
| 26 | Trenching in ordinary soil up to a depth of 60 cm including removal and stacking of serviceable materials and then disposing of surplus soil, by spreading and neatly levelling within a lead as per EIC and making up the trenched area to proper levels by filling with earth or earth mixed with sludge or / and manure before and after flooding trench with water (excluding cost of imported earth, sludge or manure). |
| 27 | Terminalia Arjuna :Ht.-8\"-9\" |
| 28 | Lagerstroemia White:Ht. 8\"-9\" |
| 29 | Terminalia Bellirica:Ht. 6\"-7\" |
| 30 | Bauhinia Blakeana:Ht. 10\"-12\" |
| 31 | Dalbergia Sissoo :Ht.-6\"-8\" |
| 32 | Mimusops Elengi:Ht. 10\"-12\" |
| 33 | Providing and laying stone stips having 10 mm to 15 mm thickness for wall cladding & jointed with white cement And Chemical Adhesive slurry |
| 34 | Grouting the joints of exposed wall cladding having joints of 10mm width, using adeshivegroute mix of(adhesive and water) filler of desired shade with pointing exposed brick polishing,brushing and cleanig and after one Coat paint forapprove water chemical.etc Completed. |
| 35 | Providing and fixing five courses water profing treatment with bitumen felt consisting of second and fourth course of blown / bitumen or/ and residual bitumen applied hot at 1.2 kg.per Sq.M.of area for each course and first course with fibre base bitunen saturated under lay type land third course with fibre base self finished felt type 2 grade 1 and fifth and final course of stone grit 6mm and down size or pea sizes gravel spread at 0.008 Cu. Metre / Sq. metre including preparation of surface excluding grading complete. |
| 36 | Supplying and planting of the specified lawn on above described surface. Plantation of lawn at distance 8cm c/c. When the grass is approximately 3 cm high, it shell be rolled with a light wooden roller and when it has grown up to 5 to 8 cms above the ground, weeds must be removed and after that lawn shall be cut to the appropriate height using the lawn cutter for minimum 3 to 4 times. Weeds shall be removed regularly and periodic top dressing of FYM shall be done during the maintenance period (Bill shall be placed after completion of maintenance period.) Work shall be done in the pattern as shown in the drawing or as directed and approved by Engineer in charge.Rate shall be inclusive of surface preparation for lawn planting, Termite Treatment, Plantation, Maintenance, Watering till the end of Maintenance Period as per the instruction of EIC. Garden soil filling with FYM shall be paid in relevant tender item |
| 37 | Providing material and labour for 12mmthickCEMENT PLASTERin Single Coat For plastering on Brick concrete wall surfaces for plasteringUPTO FLOOR TWO LEVEL & ABOVE finished even and smooth including curing etc. complete in C:M 1:3 (1 cement :3 fine sand) and finishing with floating coat of neat cement slurry. |
| 38 | Providing material and labour for applying exterior surface texture. `Heritage\" of Bakelyte Hylam over [grit finish G-1987] or luxture a base coatApplication of Heritage surface Texture grit finish consisting of a two component system of dry granite and acrylic polymer bondingALL FLOOR UP TO HEIGHT OF BUILDING |
| 39 | Providing material and Lobour with bass try with outdoor flowering Plant up to height 2\" to 2\"6\" boise halthi plant and media like vermi, garden soil & fartlizeras required and as approved by EIC |