|
| 1 | M&L for servicing of window air conditioner 1/1.5 /2TR at various locations complete by cleaning/ filter/ condenser/ evaporator section with spraying water jet, and brushing, removing of dust/ dirt from air conditioner all over, check allelectric connections, checking any leakage by applying soap solution on joints and liquid/ vapour lines properly. Cheking of functionally of spares of air conditioners and replacing the defective items supply under relevant item of schedule & rectifying the defects and put the air conditioners into operation complete all specified and directed by Engr-in-Charge. |
| 2 | Notes- (i)Spares shall me measured and paid saperately under relevent item of schedule (ii) As the nature of work is of dailymaintanaceof air conditioners contractor should deploy adequate trained two technicians with helpers as intimated by Engineer in chargeto rectify the complaint within 48 hours of receipt of complaint failing which penalty of ₹ 200/- per complaint per day till the rectiication shall be charged from the contractor (iii) Contractor should makeown arrangement for transportation of Air conditioners from site to workshop.Note:- Contractor shall be maintane register for record of servicing of AC with date wise completion of job. |
| 3 | M&L for servicing of indoor and outdoor units of split type AC of capacity 1.5/2 TR at various locations complete by cleaning of filters, indoor cooling coil, condenser coil with sparying water and brushing, removing of dust, dirt from air condtionersall over heck allelectric connections, checking any leakage by applying soap solution on joints and liquid/ vapour lines properly. Cheking of functionally of spares of air conditioners and replacing the defective items supply under relevant item of schedule & rectifying the defects and put the air conditioners into operation complete all specified and directed by Engr-in-Charge.Note:- 1. Contractor shall be maintane register for record of servicing of AC with date wise completion of job.2.Spares shall be measured & paid seperetely under respective items. |
| 4 | All as per item no.2 here in before but tower AC of capacity 3.5 TR |
| 5 | Supply only Running capacitor 1.5 MFDMake :ASIAN/ELLYT/EPCOS |
| 6 | Supply only Running capacitor 2.5 MFD Make :ASIAN/ELLYT/EPCOS |
| 7 | Supply only Running capacitor 4 MFD Make :ASIAN/ELLYT/EPCOS |
| 8 | Supply only Running capacitor 6 MFD Make :ASIAN/ELLYT/EPCOS |
| 9 | Supply only Running capacitor 36 MFD Make :ASIAN/ELLYT/EPCOS |
| 10 | Supply only Running capacitor 45+6 MFD Make :ASIAN/ELLYT/EPCOS |
| 11 | Supply only Running capacitor 50+6 MFD Make :ASIAN/ELLYT/EPCOS |
| 12 | Supply only Running capacitor 55+6 MFD Make :ASIAN/ELLYT/EPCOS |
| 13 | Supply only starting relay 1.5/2.0 TR/3.5 TR Make: Asian/Epcos/renutrol |
| 14 | Supply onlythermostate switch with knob suitable for window AC |
| 15 | Supply onlyin replacement contactor relay for split/tower AC of capacity up to 3.5 TR AC, 415V, 50Hz, 3 Phase |
| 16 | M & L for disconnecting of u/s PCB from the unit of split AC/ window AC transporting to Market for repair/ replacement of defective part required to make servicable& reinstalling with the unit and making connections complete all as per specified and directed by Engr-in-Charge. |
| 17 | M & L for disconnecting of u/s PCB from the unit of Inverter type split AC/ window AC transporting to Market for repair/ replacement of defective part required to make servicable& reinstalling with the unit and making connections complete all as per specified and directed by Engr-in-Charge. |
| 18 | S & F replacement ofMCB SP 240 Volt 32 Amp 10 KA capacity all as specified and directed by Engineer in Charge. |
| 19 | S & F in replacementMetal clad socket industrial 2pin & earth plug of20A, 230V complete suitable for AC Box all as specified and directed by Engineer in Charge. |
| 20 | S & F in replacementMetalplug top industrial 2pin & earth plug of20A, 230V complete suitable for AC Box all as specified and directed by Engineer in Charge. |
| 21 | Supply only (NRV) suitable for window/split Ac of 1.5/2 TR all as specified and directed by Engineer in Charge |
| 22 | Supply,fixing and replacement of Flare nut 6/8\"\"all as specified and directed by Engr-in-Charge. |
| 23 | Supply,fixing and replacement of Flare nut 5/8\"\"all as specified and directed by Engr-in-Charge. |
| 24 | Supply,fixing and replacement of Flare nut 3/8\"\"all as specified and directed by Engr-in-Charge. |
| 25 | Supply,fixing and replacement of Flare nut 1/2\"\"all as specified and directed by Engr-in-Charge. |
| 26 | Supply,fixing and replacement of Flare nut 1/4\"\"all as specified and directed by Engr-in-Charge. |
| 27 | Supply,fixing and replacement of Dead nut 6/8\"\"all as specified and directed by Engr-in-Charge. |
| 28 | Supply,fixing and replacement of Dead nut 5/8\"\"all as specified and directed by Engr-in-Charge. |
| 29 | Supply,fixing and replacement of Dead nut 3/8\"\"all as specified and directed by Engr-in-Charge. |
| 30 | Supply,fixing and replacement of Dead nut 1/2\"\"all as specified and directed by Engr-in-Charge. |
| 31 | Supply,fixing and replacement of Dead nut 1/4\"\" all as specified and directed by Engr-in-Charge. |
| 32 | Supply,fixing and replacement of suction valve 6/8\"\" all as specified and directed by Engr-in-Charge. |
| 33 | Supply,fixing and replacement of suction valve 5/8\"\" all as specified and directed by Engr-in-Charge. |
| 34 | Supply,fixing and replacement of suction valve 1/2\"\" all as specified and directed by Engr-in-Charge. |
| 35 | Supply,fixing and replacement of Discharge valve 3/8\"\" all as specified and directed by Engr-in-Charge. |
| 36 | Supply,fixing and replacement of Discharge valve 1/4\"\" all as specified and directed by Engr-in-Charge. |
| 37 | Supply onlyreplacement OLP relay suitable for 1.5 TR/2.00 TR AC Make :ASIAN/EPCOS/RENUTROL |
| 38 | Supply only copper liquid line filter 3 way suitable for copper pipe of 3/8 dia for window/ split AC |
| 39 | Supply and fix in replacement Copper pipe 5/8 \" outer diaall as specified and directed by Engr-in-Charge. |
| 40 | Supply and fix in replacement Copper pipe 3/8 \" outer diaall as specified and directed by Engr-in-Charge. |
| 41 | Supply and fix in replacement only Copper pipe 1/2 \" outer diaall as specified and directed by Engr-in-Charge. |
| 42 | Supply and fix in replacement Copper pipe 1/4 \" outer diaall as specified and directed by Engr-in-Charge. |
| 43 | S & F in replacement copper pipe insulation of any size complete suitable for split /Tower AC all as specified and directed by Engr-in-Charge. |
| 44 | M&L for dismantaling, disconnecting u/s compressors from Split/window AC of capacity 1.5 TR and replacement with new HSCM compressor (rotary type) on mountings such as rubber pads, nut, bolt, wahers andbreezing suction and discharge lines properly, making electrical connections, checking and leakage at joints and vaccuming the system all as specified and directed by Engr-in-Charge. Note:- Serial Number of compressor & its Make shall be recorded in MB |
| 45 | All as per item no. 43 here in before but Rotary Compressor for 2.0 TR AC, 220V, Single Phase. |
| 46 | All as per item no. 43 here in before butReciprocating compressor for 1.5 TR AC 220 V. |
| 47 | All as per item no. 43 here in before butReciprocative compressor for 2.0 TR AC 220 V. |
| 48 | All as per item no. 43 here in beforeScroll compressor of capacity 3.5 TR AC, 415V,50Hz , Three phase |
| 49 | M & L transportaion of air conditioner from site to work shop for defecting leakage from the close circuit of window air conditioner 1/1.5/2.0 TR capacity, rectifying the leakageby breezing of copper rod using by butane gas flame, vaccuming the system after rectification of leakcharging nitrozen and holding the pressure not less than 24 hours or as specified and directed by Engr-in-Charge & refixing back to its original position at site all as directed by Engineer in Charge.( Note:-Cost of brazzing rod, butane gas cartridge and nitrogen shall be included in the quoted rates. AC shall be transported through proper issue vrs/ gate pass etc.) |
| 50 | M & L for dismantling of indoor unitsplitAir conditionerof capacity 1.5/2 TR transportingfrom site to workshop for defecting leakage from the close circuit of split air conditioner ofrectifying the leakage by breezing of copper rod using by butane gas flame, vaccuming the system after rectification of leakcharging nitrozen and holding the pressure not less than 24 hours or as specified and directed by Engr-in-Charge & refixing back to its original position at siteall as directed by Engineer in Charge.( Note:-Cost of brazzing rod, butane gas cartridge and nitrogen shall be included in the quoted rates. AC shall be transported through proper issue vrs/ gate pass etc.) |
| 51 | M & L for dismantling of outdoor unitsplitAir conditioner of capacity 1.5/2.0 TR transportingfrom site to workshop for defecting leakage from the close circuit of Split air conditioner ofrectifying the leakage by breezing of copper rod using by butane gas flame, vaccuming the system after rectification of leakcharging nitrozen and holding the pressure not less than 24 hours or as specified and directed by Engr-in-Charge & refixing back to its original position at site all as directed by Engineer in Charge.( Note:-Cost of brazzing rod, butane gas cartridge and nitrogen shall be included in the quoted rates. AC shall be transported through proper issue vrs/ gate pass etc.). |
| 52 | M & L fordetecting leakage from the close circuit of Tower air conditioner of capacity 3.5 TR rectifying the leakage by breezing of copper rod using by butane gas flame, vaccuming the system after rectification of leakcharging nitrozen and holding the pressure not less than 24 hours& refixing back to its original position at site all as specified and directed by Engr-in-Charge |
| 53 | M & L for charging of refrigerent R-22 in window / split AC of capacity 1/1.5/2.0/3.5 TR capacity after detection and rectification of leakage under relevant itemof schedule and testing Complete all as specified and directed by Engr-in-Charge. |
| 54 | All as item no. 52 here in beforebutcharging of refiregent R-32 |
| 55 | All as item no. 52 here in before butcharging of refiregent R-410 |
| 56 | Supply only refrigerent R-22 gas suitable for split/ window type air conditioner in empty cylinder at AGE E/M-III storeyard complete all as specified and directed.Note: (i) Empty cylinder will be provided by the department for filling up refrigerent.(ii) Refrigerent purchase voucher should be provided by the contractor.(iii) The refrigerent shall be taken on ledger charge with receipt voucher and issued as per requirement complete all as specified and directed. |
| 57 | All as item no. 55 here in before butcharging of refiregent R-32 |
| 58 | All as item no. 55 butcharging of refiregent R-410 |
| 59 | M&L for disconnecting and dismentaling of blower/ condenser fan motor of window air conditioner of capacity 1.5/2.0 TR transporting for civil workshop and rewinding with super enamelled copper conducter wires of superior quality and assembling with the AC unit and testing and commisioning complete all as specitfied directed by Engr-in-Charge. |
| 60 | All as per item no.58 here in before but motor of out door unit of split type air conditioner of capacity 1.5/2.0 TR |
| 61 | All as per item no.58 but motor of Tower AC 3.5 TR capacity |
| 62 | S&F in replacement of single phase electric motor AC of indoor unit capacity 1.5/2.0 TR split AC as per existing make and sample as per site requirement all as specified and directed by Engr-in-Charge. |
| 63 | S&F in replacement of single phase electric motor DC of indoor unit capacity 1.5/2.0 TR split AC as per existing makeall as specified and directed by Engr-in-Charge. |
| 64 | Disconnecting and leak almunium condenser coil from split air conditioner of capacity 1.5/2.0 TR and supply & fixingof copper tube condenser coil of suitable size as per sample and make and fixing with the outdoor unit of air conditioner vaccuming the system complete and commissioning after fixing complete all as specified and directed by Engr-in-Charge. |
| 65 | S&F replacement sheet metal enclosure, 32 Amp single pole and nutralwith a two pin and earth plug socket complete metal clad board (industrial type withMCB 32 Amp fix properly all as directed by engr-in-charge. |
| 66 | M & L for factory made MS angle iron stand of suitable size to mount outdoor unit of capacity1.5/2.0 TR split AC complete all as specified and directed. |
| 67 | S & FNylon stranded PVC flexible pipe Drain pipe of size 15 mm as per sample all as specified & directed by Engr-In-charge. |
| 68 | S & F in replacement PVC insulated & sheathed round multi stranded copper conductor 2.5 sq mm 3 core 1100 Volts graded. |
| 69 | Supply and fix in replacement fan blade for window AC of 1.5/2.0 TR capacity as per existing make and sample and as specified and directed by Engr-in-Charge. |
| 70 | S&F replacementof condenser fan blade of outdoor unit of split type air conditioner 1.5/2.0 TR capacity as per make & sample and all as specified and directed by Engrin Charge. |
| 71 | M&L for disconnecting of burnt PCB from the unit and supply and fixing of new PCB of window AC of cap of 1.5/2.0 TR of any make/modelincluding testing and commitioning all as specified & directed by Engr-in-charge. Note :- Serial number of PCB and its Make shall be recorded in MB |
| 72 | M&L for disconnecting of burnt PCB from the unit and supply and fixing of new PCB of split AC of cap of 1.5/2.0 TR of any make/modelincluding testing and commitioning all as specified & directed by Engr-in-charge.Note :- Serial number of PCB and its Make shall be recorded in MB |
| 73 | M&L for disconnecting of burnt PCB from the unit and supply and fixing of new PCB of inverter type split AC of cap of 1.5/2.0 TR of any make/modelincluding testing and commitioning all as specified & directed by Engr-in-charge.Note :- Serial number of PCB and its Make shall be recorded in MB |
| 74 | M&L for disconnecting of burnt PCB from the unit and supply and fixing of new PCB of Tower AC of cap of 3.5 TR of any make/modelincluding testing and commitioning all as specified & directed by Engr-in-charge.Note :- Serial number of PCB and its Make shall be recorded in MB |
| 75 | S&F in replacement of condenser fan motor including mounting base, rubber, clips, as per existing make and soft length in split type AC of 1.5/2.0 TR capacity complete all as specified and directed. |
| 76 | S&F swing motor any type, split/ window type AC of 1.5/2.0 TR capacity complete all as specified and directed. |
| 77 | M & L for rewiding of burnt transformer of voltage stablizer of capacity 5 KVA with super enameled copper conducter winding wire and assembling with the stablizer complete all as specified and directed by Engr-in-Charge. |
| 78 | S & F in replacement of relay 25/30 AMPS 24 volt make and capacity of 5 KVA voltage stabilizer complete all as specified & directed. |
| 79 | S & F in replacement of main PCB with high and low voltage cut off PCB suitable for 5 KVA voltage stabilizer suitable making for existing all as specified & directed. |
| 80 | S & F window AC kit for 1.5 TR (with and including fans & Compressor of approved make) complete all as specified & directed. Make:- Voltas, LG & Carrier, |
| 81 | Shifting of existing split type A/C of any capacity from one location to another location complete pumping down refrigerant gas into compressorincluding disconnecting electrical/ gas connections and making good disturbed surface inCM (1:4)with existing one and its installation by making necessary electric connection incl brazing and refixing complete all as directed. |
| 82 | M & L for applying Coil Saver Spray on copper pipe & condensor coil ofWindow/ Split type ACcomplete all as specified & directed. |
| 83 | Supply,fixing and replacement of Timer tower AC complete all as specified & directed. |
| 84 | Supply of New remoteof make as per OEM of AC with and including suitable battrtery complete all as specified & directed. |
| 85 | Supply,fixing and replacement of coling coil senser complete all as specified & directed. |
| 86 | Supply & fixing in replacement of remote battery complete all as specified & directed. |
| 87 | M & L for Disconnecting water cooler of any sizefrom main power and taking out for carrying out necessary repair/service/maintanance to check serviceability of compressors, fan motor , capacitor,thermostates, switches, gas leackage , push taps,fan blades,relays,over load protectors, condensor coils and any otyher spares required to make the water cooler functionaland fixing in origional / existing position complete all as specified and directed. |
| 88 | S & F in replacement Push cock, of brass chromium plated, 15 mm bore, complete all as specified. |
| 89 | S & F in replacement 15 mm bore PTMT float valve assembly with PVC floatfor water coolercomplete all as specified and directed. |
| 90 | S & F in replacementcombination relay unit complete suitable for water cooler 40 to 150 litre capacity complete all as specified and directed. Make: RANUTROL/ INDFOS/ KIRLOSKAR/ SRI RAM/HI TECH. |
| 91 | S & F in replacement copper condenser coil suitable for water cooler 40/80 litre capacity as per existing sizecomplete all as specified and directed. |
| 92 | S & F in replacement copper condenser coil suitable for water cooler 80/150litre capacity as per existing sizecomplete all as specified and directed. |
| 93 | S & F in replacement thermostat switch suitable for water coolerincluding knob plate and screw complete all as specified and directed. Make: INDFOS/RANUTROL/ SRIRRAM/USHA/HI TECH. |
| 94 | S & F in replacement condenser fan motor not less than 1/5 HP or as requiredcompletesuitable for water cooler complete all as specified and directed. Make: AMERICAN UNIVERSAL/USHA/AIR MASTER/COOLER MASTER. |
| 95 | Disconnecting old defective burnt sealed compressor unit of water cooler of capacity 40/80 Ltrs and replacement of same with new sealed compressor unit as per sample and including soldering of copper pipes, foundation rubber bushes, nut bolts cleaning the refrigerant system complete all as specified and directed. Note:- Serial Number of compressor & its Make shall be recorded in MB |
| 96 | Disconnecting old defective burnt sealed compressor unit of water cooler ofcapacity60/120and replacement of same with new sealed compressor unit as per sample and including soldering of copper pipes, foundation rubber bushes, nut bolts cleaning the refrigerant system omplete all as specified and directed. Note:- Serial Number of compressor & its Make shall be recorded in MB, |
| 97 | Testing of water cooler vacumising properly and rectification of leakage in entire system and making the gas system leak proof by brazing/welding charging of refrigerent R-22 to the entire satisfaction of Engineer-in-Charge. |
| 98 | M & L for factory made ms angle moter stand of suitable size to mount of water cooler capacity of any size and including two coat of synthetic enamel paint and a coat of red oxide primer complete all as specified and directed. |
| 99 | M & L for disconnecting refrigerator from main power to carry out necessary servicing and checkups to maintain efficient working throughout the season/year by checking, cleaningall parts all as directed by Engg-in-charge |
| 100 | Disconnecting old defective burnt sealed compressor unit of Refrigerator 150 to 180 Liters capacity of any make and replacement of same with new sealed compressor unit including soldering of copper pipes, foundation rubber bushes, nuts bolts, cleaning the refrigerant system and testing complete all as specified and directed. Make: KIRLOSKAR/ KELVINATOR/ GODREJ/ WHIRLPOOL/LG.Note :- Serial number of compressor and its Make shall be recorded in MB. |
| 101 | Cleaning the gas system along with rectification of leakage in the system of 165/190/290/310 litres capacity refrigerator and charging of refrigerent 134A complete all as specified and directed. |
| 102 | S & F in replacementDC freezer fan motor of refrigeratorsuitable for any make and capacity complete all as specified and directed. |
| 103 | M & L for disconnecting Deep freezerfrom main power to carry out necessary servicing and checkups to maintain efficient working throughout the season/year by checking, cleaningall parts all as directed by Engr-in-charge |
| 104 | Disconnecting old defective burnt sealed compressor unit of Deep freezer 500Liters capacity of any make and replacement of same with new sealed compressor unit including soldering of copper pipes, foundation rubber bushes, nuts bolts, cleaning the refrigerant system and charging of refrigerant and testing complete all as specified and directed. Make: KIRLOSKAR/ KELVINATOR/ GODREJ/ WHIRLPOOL/LG. Note :- Serial number of compressor and its Make shall be recorded in MB. |
| 105 | S & F in replacement starting relay assembly suitable for Deep freezer up to 500litres capacity complete all as specified and directed.Make: RANUTROL/ INDFOS/HI TECH. |
| 106 | S & F in replacement thermostat switch with defrostingarrangement suitable for Deep freezer up to 500 capacity including knob plate and screw complete all as specified and directed. Make: INDFOS/ RANUTROL/ HONEY WELL/HI TECH. |
| 107 | S & F in replacement over load protectorsuitable for deep freezer complete all as specified and directed. Make: SHRIRAM/ RANUTROL/ KIRLOSKAR/HI TECH. |
| 108 | S & F in replacement condenser fan motor not less than 12 watt or as requiredcompletesuitable for deep freezer complete all as specified and directed. Make: AMERICAN UNIVERSAL/USHA/AIR MASTER / COOLER MASTER. |
| 109 | Cleaning the gas system with CTC vacuum pump and charging the Deep freezer R-134A with antimoist substance and filter along with rectification of leakage in the system ofup to 500litres capacity Deep freezer and charging of refrgerent R-290 complete all as specified and directed. |
| 110 | M & L for Disconnecting Industrial cooler from main power and taking out for carrying out necessary repair/service/maintanance to check serviceability ofwater pump, fan motor , capacitor, switches, cooler body , water distribution pipes from the desert cooler, removing existing paint/treatment completely preparing the surface and applying externally two coats of synthetic enamel spray paint( as approved) over a coat of red oxide primer (shutters shall be painted all-round i.e. externallyinternally with one coat of synthetic enamel spray paint over a coat of red oxide primer) and paintingcooler body internally with one coat of bituminous paintand refixing only serviceable motor, pump, PVC pipe, distributor and shutters in existing position complete all as specified and directed. |
| 111 | M & L for Disconnecting desert cooler from main power and taking out for carrying out necessary repair/service/maintanance to check serviceability ofwater pump, fan 2.motor , capacitor, switches, cooler body , water distribution pipes from the desert cooler, removing existing paint/treatment completely preparing the surface and applying externally two coats of synthetic enamel spray paint( as approved) over a coat of red oxide primer (shutters shall be painted all-round i.e. externallyinternally with one coat of synthetic enamel spray paint over a coat of red oxide primer) and paintingcooler body internally with one coat of bituminous paintand refixing only serviceable motor, pump, PVC pipe, distributor and shutters in existing position complete all as specified and directed. |
| 112 | M& L forrewinding fan motor of Industerial cooler with suitable size of super enameled copper wire including replacement of bush, insulating material, greasing, testing and refixing complete after repairall as specified and directed. |
| 113 | M & L forrewinding fan motor of desert cooler with suitable size of super enameled copper wire including replacement of bush, insulating material, greasing, testing and refixing complete after repairall as specified and directed. |
| 114 | S & FPVC flexible tubing , distributor and elbows and providing PVC flexible tubing distributor and elbows for desert cooler complete all as specified and directed. |
| 115 | S & F in replacementsubmersible pump of desert cooler single phase AC, 230 Volts, 50 Hz including necessary connection and testing complete all as specified and directed. Make: POLAR/KHAITAN/GEC. |
| 116 | S & F in replacementRotary selector switch with 3 speed for desert cooler/ industerial cooler complete all as specified and directed. Make: ANCHOR/ AGI/ DELITE. |
| 117 | S & F in replacement PVC sheathed 3 core cable with copper conductor size 23/0.0076 forDesert cooler complete all as specified and directed. Make: FINOLEX/PLAZA/HAVELLS. |
| 118 | S & F in replacement new wooden wool dry pad of suitable size as requiredfor desert cooler of best quality as approved by GE/Engg-in-charge , complete all as specified and directed. |