| 1 | A) Removal of following existing unserviceablecomponents of variousfurniture items given below carefully without disturbing the adjoining parts and supply & fixingnew components confirming to IS and as approved as mention below.All steel surfaces from inside and outside shall betightening the joints,placing every part in tact.B) Work shall be executed where the furniture exist in different User Units/Md Accn of GE Gaya including BSO\"s Furniture Yard as directed by Engineer-in-Charge.AlmirahLarge Steel Half Hanging Half Shelf a) 3-Way locking assembly with iron plate and 01 No rod 10mm and lock cover |
| 2 | b) CP Handle as per drg |
| 3 | c) Lock as per drg |
| 4 | d) Conduit pipe hanger rod as per drg |
| 5 | e) MS Hinges as per drg |
| 6 | f) Spot welding of brokenjointsnot exceeding 25 mm in length including painting the welded parts to match with existing as per drg. |
| 7 | Almirah Large steel Godreja) 3-Way locking assembly with iron plate and 01 No rod 10mm and lock cover |
| 8 | b) CP Handle as per drg |
| 9 | c) Leg as per drg |
| 10 | d) Door as per drg |
| 11 | e) Shelf as per drg |
| 12 | f)Lock as per drg |
| 13 | g) MS Hinges as per drg |
| 14 | h) Looking mirror as per drg |
| 15 | j) Spot welding of brokenjointsnot exceeding 25 mm in length including painting the welded parts to match with existing as per drg. |
| 16 | Almirah Large Steel with shelvesa) 3-Way locking assembly with iron plate and 01 No rod 10mm and lock cover |
| 17 | b) Handle as per drg |
| 18 | c) Leg as per drg |
| 19 | d) Door as per drg |
| 20 | e) Shelf as per drg |
| 21 | f)Lock as per drg |
| 22 | g) MS Hinges as per drg |
| 23 | h) Spot welding of brokenjointsnot exceeding 25 mm in length including painting the welded parts to match with existing as per drg. |
| 24 | Almirah Steel Medium with shelvesa) 3-Way locking assembly with iron plate and 01 No rod 10mm and lock cover |
| 25 | b) Handle as per drg |
| 26 | c) Leg as per drg |
| 27 | d) Door as per drg |
| 28 | e) Shelf as per drg |
| 29 | f)Lock as per drg |
| 30 | g) MS Hinges as per drg |
| 31 | h) Spot welding of brokenjointsnot exceedind 25 mm in length including painting the welded parts to match with existing as per drg. |
| 32 | Locker Bed side Steela) 3-Way locking assembly with iron plate and 01 No rod 10mm and lock cover |
| 33 | b) Handle as per drg |
| 34 | c) Leg as per drg |
| 35 | d) Door as per drg |
| 36 | e) Drawer as per drg |
| 37 | f)Lock as per drg |
| 38 | g) Conduit pipe hanger rod as per drg |
| 39 | h) MS Hinges as per drg |
| 40 | j) Spot welding of brokenjointsnot exceedind 25 mm in length including painting the welded parts to match with existing as per drg. |
| 41 | Locker Bed side Steela) Handle as per drg |
| 42 | b) Leg as per drg |
| 43 | c) Door as per drg |
| 44 | d) Shelf as per drg |
| 45 | e) Hasp & Staple as per drg |
| 46 | f)Conduit pipe hanger rod as per drg |
| 47 | g) MS Hinges as per drg |
| 48 | h) Spot welding of brokenjointsnot exceedind 25 mm in length including painting the welded parts to match with existing as per drg. |
| 49 | Book Case Steel/ Book shelf open large steela) New Glass as per size and Drg |
| 50 | b) Handle as per drg |
| 51 | c) Lock as per drg |
| 52 | d) Spot welding of brokenjointsnot exceedind 25 mm in length including painting the welded parts to match with existing as per drg. |
| 53 | Chair Computer / Revolving , a) Chair nylon Base with five wheels as per drg |
| 54 | b) Armrest as per drg and as directed by Eng in charge |
| 55 | c) Nylon castor wheel as per drg |
| 56 | d) Hydraulic system of chair all as per drg and as directed by eng in charge |
| 57 | e) To fix nut and bolt of chair computer as required |
| 58 | f) Tapestry of seat & Back including PVC lipping as per drg |
| 59 | g) S&F new seat made of 12mm thick hot pressed plywood with fabric polyproplene / acrelic (range of fabric not less than Rs 300/ Rm) and moulded polyurethene foam and PVC lipping all around complete all as shown on drawing as per drg |
| 60 | h)S&F new back made of 12mm thick hot pressed plywood with fabric polyproplene / acrelic (range of fabric not less than Rs 300/ Rm) and moulded polyurethene foam and PVC lipping all around complete all as shown on drawing as per drg |
| 61 | Chair writing / Chair Visitora) Removing of existing U/S seat ply including cushion foam and tapestry of chair wiriting MAP and S&F with new seat ply including cushion foam and tapestery with PVC lipping all around as shown in drg. |
| 62 | b) Removing of existing U/S back ply including cushion foam and tapestry of chair wiriting MAP and S&F with new back ply including cushion foam and tapestery with PVC lipping all around as shown in drg. |
| 63 | c) Tapestry of seat & Back including PVC lipping as per drg |
| 64 | d) Removing of existing U/S handle of chair wiriting MAP and S&F with newhandle as shown in drg. |
| 65 | e) Rejoining the base stiffner with spot welding of broken joints not exceeding 25mm in length as and where required as per drg. |
| 66 | f) Removing U/S PVC lipping from seat and back of existing chair writing and S&F new PVC lipping in seat and back of chair wrting as per drg. |
| 67 | Chair Verandaha) Removing of U/S canning of seat of chair verandah and recanning of seat with new cane size 4mm width of chair verandah as per drg |
| 68 | b) Removing of U/S canning of back of chair verandah and recanning of back with new cane size 4mm width of chair verandah as per drg |
| 69 | c) PVC Seat and Back Make Amko |
| 70 | Chair CB steel with/without Armsa) Seat made of first class hard wood duly canning with 2mm wide cane and border with 4mm cane along with provision of MS flate iron 470x 25x3mm(02) Nos duly welded for both side of seat to rest and strengthen as per drg |
| 71 | b) Back made of first class hard wood duly canning with 2mm wide cane and border with 4mm cane. |
| 72 | c) Arm rest as per drg |
| 73 | d) Spot welding of brokenjointsnot exceedind 25 mm in length including painting the welded parts to match with existing as per drg. |
| 74 | e) Clits made out of MS flat bar 25mm X 3mm thick and 40mm long duly welding with a hole to fix the back as per drg |
| 75 | Table Office Clerk Steel/Table writing steel Godreja) Lock of drawer as per drg |
| 76 | b) Drawer as per drg |
| 77 | c) Long Stiffeners as per drg |
| 78 | d) Short Stiffeners as per drg |
| 79 | e) Spot welding of brokenjointsnot exceedind 25 mm in length including painting the welded parts to match with existing as per drg. |
| 80 | f)Top of table shall be made of 18/19 mm thick pre lamineted MDF board exterior gradeconfirming to IS with 2mm thick PVC beadingall around as per drg as directed by Eng in Charge.Make- Action tesa, Greenpanel & Century |
| 81 | Table Office Officer Steela) Lock of drawer as per drg |
| 82 | b) Drawer as per drg |
| 83 | c) Long Stiffeners as per drg |
| 84 | d) Short Stiffeners as per drg |
| 85 | e) Spot welding of brokenjointsnot exceedind 25 mm in length including painting the welded parts to match with existing as per drg. |
| 86 | f) Top of table shall be made of 18/19 mm thick pre lamineted MDF board exterior grade confirming to IS with 2mm thick PVC beadingall around as per drg as directed by Eng in Charge.Make- Action tesa, Greenpanel & Century |
| 87 | Table bed side steel a) Top shall be 18/19 mm thick pre lamineted MDF board exterior grade confirming to IS with 2mm thick PVC beadingall around as per drg as directed by Eng in Charge Make- Action tesa, Greenpanel & Century |
| 88 | b) Table sides shall be 18/19 mm thick pre lamineted MDF board exterior grade confirming to IS with 2mm thick PVC beadingall around as per drg as directed by Eng in Charge. Make- Action tesa, Greenpanel & Century |
| 89 | c) Upper Drawer complete as per drg |
| 90 | d) Lower Drawer complete as per drg |
| 91 | e) Handle as per drg |
| 92 | f)Back ply as per drg |
| 93 | g) Replacement of u/s telescopic channelfrom drawer as per drg |
| 94 | h) Spot welding of brokenjointsnot exceedind 25 mm in length including painting the welded parts to match with existing as per drg. |
| 95 | Rack Shoe Steela) Spot welding of brokenjointsnot exceedind 25 mm in length including painting the welded parts to match with existing as per drg. |
| 96 | Charpoy GI Ply top:a) Removing of the existingh U/S long rail andSupply & fixing new long rail with 32 mm dia GI Pipe including both end threaded suitable for fixing elbow complete all as shown in drg as specified and directed . |
| 97 | b) Removing U/S BROKENShort rail and fixing new short rail made out of old broken long rail obtained from 15 (a) above including both end threaded suitable for fixing elbow complete all as shown in drg as specified and directed. |
| 98 | c)Removing U/S broken Legs and fixing new leg made out of old broken long /short rail obtained from 1 (a) & (b) above including both end threaded suitablefor fixing elbow complete all as shown indrg as specified and directed. |
| 99 | d) Removing of U/S Elbow 3way and supply and fix new GI Elbow 32 mm dia ISI marked all as shown in drg as specified and directed . |
| 100 | e) Removing of U/S Checknut and Supply and fix new checknut all as shown in drg as specfied and directed . |
| 101 | f) Removing existing unserviceable plywood top from the Charpoy GI pipe and supplying & fixing new 12 mm thick plywood IS-710Marked BWP type and including refixing of existing stiffner fixing with screw at equal distance to GI pipe frame of charpoy and fixing the plywood top with MS machinemade screw bolts with washers and one hexagonal nut of 50 mm long ,dia of neck 5 mm and applying one coats of synthetic enamel paint to stiffeners after one coat of paint primer complete as directedMake : greenply, Century , Archidply |
| 102 | g)Removing of MS angle iron 900mm long of size 32 x 5mm, rest on both long rail and fixing the MS angle iron duly welded with long rail. |
| 103 | h) Spot welding of brokenjointsnot exceeding 25 mm in length including painting the welded parts to match with existing as per drg. |
| 104 | Bed Hard steel a) 12mm BWP IS-710Marked ply for Bed top as per drg,Make : greenply, Century , Archidply |
| 105 | b) 18 mm prelamineted MDF Board for Head/Foot rest as per drg |
| 106 | c) Spot welding of brokenjointsnot exceedind 25 mm in length including painting the welded parts to match with existing as per drg. |
| 107 | Charpoy IP with plywood topa) 12mm BWP IS-710Marked ply for Bed top as per drg, Make : greenply, Century , Archidply |
| 108 | b) Spot welding of brokenjointsnot exceedind 25 mm in length including painting the welded parts to match with existing as per drg. |
| 109 | Charpoy IP folding withply wood hard topa) 12mm thick BWP grade confirmng to IS-710 make: Greenply/Centuryply/Archid plyshall be usedas per drg. |
| 110 | b) Spot Welding the joints not exceeding 25 mmincluding painting the welded parts to match with existing |
| 111 | Teapoy Varandaha) Top of table shall be made of 18/19 mm thick pre lamineted MDF board exterior grade confirming to IS with 2mm thick PVC beadingall around as per drg as directed by Eng in Charge. Make- Action tesa, Greenpanel & Century |
| 112 | b) Spot welding of brokenjointsnot exceeding 25 mm in length including painting the welded parts to match with existing as per drg. |
| 113 | Table 3\"x2\" with /without drawer steela) Top of table shall be made of 18/19 mm thick pre lamineted MDF board exterior grade confirming to IS with 2mm thick PVC beadingall around as per drg as directed by Eng in Charge.Make- Action tesa, Greenpanel & Century |
| 114 | b) Spot welding of brokenjointsnot exceeding 25 mm in length including painting the welded parts to match with existing as per drg. |
| 115 | Table dining OR steela) Top of table shall be made of 18/19 mm thick pre lamineted MDF board exterior grade confirming to IS with 2mm thick PVC beadingall around as per drg as directed by Eng in Charge.Make- Action tesa, Greenpanel & Century |
| 116 | b) Spot welding of brokenjointsnot exceeding 25 mm in length including painting the welded parts to match with existing as per drg. |
| 117 | Table computer a) Top of table shall be made of 18/19 mm thick pre lamineted MDF board exterior grade confirming to IS with 2mm thick PVC beadingall around as per drg as directed by Eng in Charge.Make- Action tesa, Greenpanel & Century |
| 118 | b) Telescopic channel of key board as per drg. |
| 119 | c) Telescopic channel of drawer as per drg. |
| 120 | d) Base Top of table shall be made of 18/19 mm thick pre lamineted MDF board exterior grade confirming to IS with 2mm thick PVC beadingall around as per drg as directed by Eng in Charge. |
| 121 | e) Drawer made of MDF board as per drg. |
| 122 | f)Key board made of pre laminated MDF Board as per drg |
| 123 | g) Shelf top with vertical side made of MDF board as per drg. |
| 124 | h) Spot welding of brokenjointsnot exceeding 25 mm in length including painting the welded parts to match with existing as per drg. |
| 125 | A)M&L for preparing all old painted surface and removing dents & bents if required of following items and applying two coat of synthetic enamel spray paint of TA GREY/OG/silver or Existing color and all internal & external surface complete. Make- Asian/Berger/NerolacAlmirahLarge Steel Half Hanging Half Shelf |
| 126 | Almirah large steel Godrej |
| 127 | Almirahlarge Steel with shelves |
| 128 | Almirah Med Steel with shelves |
| 129 | Locker Bed side Steel |
| 130 | Locker Bed side Steel |
| 131 | Book Case steel / Book Shelf open steel all type |
| 132 | Chair writing steel (MAP) /Chair visitors |
| 133 | Chair Verandah |
| 134 | Chair CB Steel with Arms |
| 135 | Table Office Clerk Steel, Table writing steel |
| 136 | Table Office Officer Steel |
| 137 | Table Bed Side Steel |
| 138 | Rack shoe steel |
| 139 | Bed Hard Steel |
| 140 | Charpoy IP with plywood Top |
| 141 | Charpoy IP folding with plywoodhardTop |
| 142 | Teapoy Varandah |
| 143 | Table 3\"x2\" with /without drawer steel |
| 144 | Table dining OR steel |
| 145 | Table computer |
| 146 | Rack adjustable Steel with Shelves/ Rack P/Hole |
| 147 | PVC Shoe for all types of, Tables,Chairs,Teapoy Verandah, Table bed side, Bed Hard Steel |
| 148 | Supply and laying river bed fine sand in trenches/ ducts 15 cm under cable and 8 cm above the cable for cushioning / protection to cable including spreading, levelling and get thick 18cm after hand punning complete all as specified and directed at site. |