| 1 | HSR Item 6.1.2-Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work below plinth level and up to Floor IV level: 2. 1:2:4 (1 cement : 2 coarse sand (zone-III) : 4 graded stone aggregate 20 mm nominal size)HSR Rate(Rs.) 3476.00 Through Rate |
| 2 | HSR Item 9.57.3-Providing and fixing on wall face Unplasticised Rigid PVC rain water pipes conforming to IS : 13592 Type A, including jointing with seal ring conforming to IS : 5382, leaving 10 mm gap for thermal expansion, (i) Single socketed pipes. 3. 150 mm diameterHSR Rate(Rs.) 269.00 Through Rate |
| 3 | HSR Item 13.29.2-Steel work welded in built up sections/ framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required. 2. In gratings, frames, guard bar, ladder, railings, brackets, gates and similar worksHSR Rate(Rs.) 83.00 Through Rate |
| 4 | HSR Item 22.206.1-Constructing brick masonry road gully chamber 45x45x77.5 cm with bricks in cement mortar 1:4 (1 cement : 4 coarse sand ) with precast R.C.C. vertical grating complete as per standard design : 1. With common burnt clay non-modular bricks of class designation 7.5HSR Rate(Rs.) 3284.00 Through Rate |
| 5 | HSR Item 7.22.2-Brick work with common burnt clay non- modular bricks of class designation 10.5 in superstructure above plinth level up to floor IV level in all shapes and sizes in: 2. Cement mortar 1:6 (1 cement : 6 coarse sand)HSR Rate(Rs.) 4488.00 Through Rate |
| 6 | HSR Item 17.70-Removal of existing IPB by manual means and disposal of dismantled material with all lead and lift as per technical specification clause 202.3.HSR Rate(Rs.) 26.00 Through Rate |
| 7 | HSR Item 17.5.3-Compacting Original Ground 3. Compaction of EarthworkCompaction of & preparation of sub grade including loosening, levelling of earth 225 mm thick top layer, rough dressing of soil, final dressing of earth to give level, camber, watering, rolling with road roller, compacting the bed to achieve minimum dry density as given in the Table 3000-2 as per technical clause 305 of MORT&H specificationsHSR Rate(Rs.) 7.00 Through Rate |
| 8 | HSR Item 17.71-Relaying of available (removed and stacked) Interlocking Paver Block Pavement having thickness 100mm/80 mm/ 60 mm (average = 80mm) as per drawings and Technical Specification Clause 1504HSR Rate(Rs.) 66.00 Through Rate |
| 9 | HSR Item 17.15.1-Granular Sub-Base with Coarse Graded Material - Grading-I or II or III (Table:- 400-2)Construction of granular sub-base by providing coarse graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with Rotavator at OMC, and compacting with vibratory roller to achieve the desired density, complete as per clause 401.of MORTandH specifications 1. Grading I materialHSR Rate(Rs.) 911.00 Through Rate |
| 10 | HSR Item 21.53-Constructing standard drain type I drain moulded and laid over lime concrete foundation rendered and finished smooth with 6 mm thick rendering concrete to be of1.3.6 parts by volume of cement sand stone bajri and rendering to be 1:1 cement sand mortarHSR Rate(Rs.) 160.00 Through Rate |
| 11 | HSR Item 3.1.9-By Mechanical Transport including loading, unloading and stacking 9. Brick TilesHSR Rate(Rs.) 159.00 5km |
| 12 | HSR Item 17.69.2-Interlocking Concrete Block Pavement 2. Providing and Laying 80 mm thick ISI marked Interlocking Paver Blocks conforming to IS 15658:2006/IRC SP 63: 2004 of all shapes and colours in design mix cement M 40 over the bed of 30 mm thick fine sand complete in all respect.HSR Rate(Rs.) 655.00 Through Rate |
| 13 | HSR Item 17.6-Construction of Embankment with Material obtained from Borrow pits NA Construction of Embankment CBR 8% (for new road/ raising/ berms/ etc.) with approved material obtained from borrow pits, including compensation of earth with all lead and lift transporting to site, spreading, grading to required slope and compacting to meet requirement of table 300-2, as per technical clause 305 of MORT&H specifications.HSR Rate(Rs.) 184.00 Through Rate Please Enable Macros to View BoQ information |