| 1 | Laying and Jointing PVC Pipe. Heading |
| 2 | 9 KV Gapless type(5 KA) polymer lightening arrestor |
| 3 | D.C. Cross-arms 8 ft centre to center (100x50x6mm) Channel |
| 4 | Transformer mounting Channel (100X50x6 mm.) |
| 5 | BIS certified Energy Efficiency Level-III (Old)/Level-II (New) Convential 11/0.433KV, 100 KVA Distribution Transformer |
| 6 | Three phase Electronic meter 10-40 Amps. with data downloading facility & box |
| 7 | 11 KV Strain hardware (T&C type) fittings |
| 8 | D.O.Mounting Channel 75x40x6mm |
| 9 | H-Beams 152 X 152 mm., 37.1 Kg./Mtr.-11 mtr. Long = 408.1 kg |
| 10 | 11 KV Composite Polymer AB Switch Horizontal Movement type |
| 11 | 11 KV D.O. Fuse Unit Polymer type |
| 12 | 11 KV(45KN) Composite Polymer Disc Insulators |
| 13 | Anti climbing devices ( Barbed wire 2.24 mm dia, 14 SWG) |
| 14 | Galvanized nut & bolt with washer |
| 15 | Aluminium paint |
| 16 | G.I. STRIP 25X3 MM1 |
| 17 | Bi-metallic clamps suitable for 12mm dia stud and 80sqmm AAAC |
| 18 | STAY WIRE 7/3.15 MM.(7/10 SWG) |
| 19 | M.S.Nuts with Bolts |
| 20 | Back Clamps for H-Beam of MS Flat 65x8mm (Each weight 1.92 Kg) |
| 21 | Clamp 65X8 mm Flat of MS Flat for H-Beam ( Each weight 3.2 kg) |
| 22 | Red oxide paint |
| 23 | Stay set complete without Stay wire 16 mm. (Painted) |
| 24 | Bi-metallic clamps Distribution Transformers Bushing |
| 25 | Trans. Belting with 50 X 50 X 6 mm.angle with two cross fixing channels |
| 26 | Danger Boards Enamelled 11 KV |
| 27 | Complete jumpering of DTR |
| 28 | Bentonite compound powder |
| 29 | Stone Block/Pre cast block for base pedding(450X450X75MM) |
| 30 | Concreting of stay (16 mm / 12 mm) @ 0.2 Cmt. per stay |
| 31 | G.I.Pipe 40 mm Dia C grade type |
| 32 | Concreting of structures & foundation (1:3:6) |
| 33 | LT distribution box with 1.2 mm thick MS powder coated sheet, 200 A MCB on incoming & 6 no. 125 A HRC fuse base including 100 A HRC fuse , For 100 KVA Transformer |
| 34 | Lumpsum value |
| 35 | Total value all section |
| 36 | Bifurcation of Erection Value |
| 37 | The Total value of Schedule2 |
| 38 | Contractor % |
| 39 | Labour & Transport Amount Shifted Form Company side to Contractor Side |
| 40 | Final amount of Labour & Transport charges (Company side and Contractor Side) |
| 41 | Total Amount Without GST |
| 42 | GST on Transportation@5% |
| 43 | GST on (Material + Labour) @18% |
| 44 | Total Amount With GST |
| 45 | Total Amount For NIT Please Enable Macros to View BoQ information |