Painting the RCC column, beam, slab, bottom walls etc...., of building at all elevations and locations up to 20 M from existing floor level with two coat of chlorinated rubber paint, after cleaning the surface, including all labour charges, hire for tools and brushes, all consumable all safety protection to workers, cable, pipe line, machineries, equipment, including covering with tarpaulin or similar materials without causing hindrance to plant operation, all charge for scaffolding, cleaning the plant area after work etc., complete (required chlorinated rubber paint and thinner be supplied free of cost by TCC)
2
Cement plastering over fibre net with cement mortar1:4 for a minimum thickness of 20 mm thick in two layer for wall, beam, column & slab etc up to a height of 20m from ground level and floor level excluding cost of supplying and fixing fibre net, and minimum of 7 days curing after plastering including all labour charges, hire for tools and plants, cost of all materials, all charge for scaffolding including all safety measures like safety net,safety belt, helmet, goggles / face sheld, safety shoes, life line for hooking safety belt at contractors risk and cost,approved by Engineer.
3
Engaging Male workers for executing miscellaneous items of work at all locations and elevation , including all labour charges , ESI , PF KCWWF contributions and all other benefits payable , hire for tools and PPE\"s all safety precautions and work permit system etc. complete as per the instruction of Engineer -In-Charge. Please Enable Macros to View BoQ information
We takes all possible care for accurate & authentic tender information, however Users
are requested to refer Original source of Tender Notice / Tender Document published by
Tender Issuing Agency before taking any call regarding this tender.