| 1 | National Flag Work |
| 2 | Supply and fixing of 30 tntr, High mast Pole of approved make with rising system, hot dip Galvanized inside & outside having pole sheet thickness 4mm,top dia minimum150mm, bottom dia minimum 500mm, base plate 32mm thick, suitable for wind velocity as per IS 875 part 3 &.having no circumferential weld, with accessories for high mast such as head frame suitable for 8 to 12 luminaries & its control gear boxes,l.5 HP Power tool motor, 3 point suspension system with steel wire rope 8 mm dia ,double drum winch. Including making suitable Foundation as per manufacture drawing & site requirement along with foundation bolts, nuts, washers, anchor plates etc Complete in all respect as per direction and satisfaction to the Engineer-in-charge |
| 3 | Supply, raising and lowering of 20 x 30 three color indian National flag pure knitted01 ster |
| 4 | Supply & fixing of 7 mtr GI Octagonal Pole of approved make (top dia 70mm, Bottom dia 130mm and base plate 12mm thik) having 3mm thikness with single arm bracket (l Mtr length) on RCC foundation including the cost of foundation, foundation bolts, excavation & back filling and Required T&P completee in all respect |
| 5 | Supply and fixing of factory wired integral LED flood light luminaires with die cast aluminium housing built with dirver set suitable for 170 to 200 Watt. Confirming to IP 66 protection complete in all respect. |
| 6 | Earth work in excavation by mechanical means (Hydraulic excavator) \"manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as Directed within a lead of 50m |
| 7 | Providing and laying cement concrete1:5:10 (1 cement : 5 coarse sand (zone-111) derived from natural sources : 10 graded stone aggregate 40 mm nominal size derived from natural sources |
| 8 | Brick work with common bumt clay F.P.S. (non modular) bricks of class designation 7.5 in superstructure above plinth level up to floor V level in all shapes and sizes in :Cement mortar 1:4 (1 cement : 4 coarse and |
| 9 | Reinforced cement concrete work in beams, suspended floors, roofs having slope up to 150 landings, balconies, shelves, chajjæs, lintels, bands, plain window sills, staircases and spiral stair cases above plinth level up to floor five level, excluding the cost o centering, shuttering, finishing and reinforcement with 1:1.5:3 (1 cement : 1.5 coarse sand(zone-lll) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources). |
| 10 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete \"Illermo•Mechanically Treated bars o de Fe-500D or m re. |
| 11 | 12 mm cement plaster of mix : (l cement: 4 coarse sand) |
| 12 | Centering and shuttering including strutting, propping etc. and removal of form for-(i) Foundations, footings, bases o columns, etc. for mass concrete |
| 13 | Providing and fixing of Granite of 18 mm (DSR 2023) thick gang saw cut, mirror polished, prenloulded and prcpolished, machine cut for kitchen platforms, vanity counters, window sills, facins and similar locations o required size, approved shade, colour and texture laid over 20 mm thick base cement mortar (l cement : 4 coarse sand), joints treated with white cement, mixed with matching pigment, epoxy touch ups, including rubbing, curing, moulding and polishing to edges to give high gloss finishetc. complete at all levels,Area of slab over0.50 sqm |
| 14 | Providing, erecting direction and place801(8.6) identification retro-reflection sign as per IRC -67 made of encapsulated lens type reflective sheeting vide clause 1701.2.3 fixed aluminium sheetin |
| 15 | Supply and laying of aluminiumconductor PVC insulated armoured servedsheathed cables 1100 Volts grade at a depthof 750 mm below ground level over acushion of 75 mm. thick sand all around and protected with burnt bricks on sides and on top. On surface the cable run shall be fixed on M.S. clamps etc. of suitable size or as directed by the Engineer-Incharge, complete in all respect. The armouring o the cable shall be properly connected with the earth conductor by clamps etc: 10 sq.mm 4 core |
| 16 | Complete • Instalation, Erection and labor Quotation charge of 30.50 mtr High Mast and 7 mtr Octagonel Pole civil work and installation work, engineer civil, material, Man power, Hydra, JCB) (MCB electric part, engineer stay) traffic diversion |
| 17 | Transportation charge of 30,5 mtr HighQuotation mast and 7 mtt Octagonal Pole civil all Job 35,0 material from su iler |
| 18 | ADD GST 18% Please Enable Macros to View BoQ information |