| 1 | Physical inspection of the site & Checking of EB connection, assessing the activities required for dismantling and shifting the Electromechanical Equipment and accessories etc. as required. |
| 2 | Disconnection of power supply cables of EB / DG at feeder panel, DG set panel, Electrical Distribution Panel and from MCBDBs and disconnection of earth strips/wires etc. complete as required. |
| 3 | Dismantling and removing the following Electrical equipment and accessories etc. i/c clearing the site, making good the damages, cleaning and shifting all the materials up to the transportation vehicle or to the storage location of the same / nearby building etc. as required. |
| 4 | Meter box / Feeder panel, TPN /SDFU, MCBDBs, AC starter boxes, Fans, Fittings, cables, conduits along with all accessories and Service connection cables etc. complete as required. (BTS sites) |
| 5 | Electrical Power distribution panel, Power plant power supply panel/MCBDB, Meter box / Feeder panel, TPN /SDFU, MCBDBs, AC starter boxes, Fans, Fittings, cables, conduits along with all accessories and Service connection cables etc. complete as required. (TE/TE-Cum-BTS) |
| 6 | Dismantling and removing the AVR and AVR by pass panel including dismantling all power cables etc. and shifting all the materials up to the transportation vehicle or to the storage location of the same / nearby building etc. as required. |
| 7 | Dismantling the Split AC units along with its all accessories i.e. indoor unit, outdoor unit, Refrigerant pipes, interconnection cables etc. as required and shifting all the materials up to the transportation vehicle or to the storage location of the same / nearby building etc. as required. |
| 8 | Removing the 1.5TR WAC units along with outer housing & its supporting structures from its positions after disconnection of power supply and shifting all the materials up to the transportation vehicle or to the storage location of the same / nearby building etc. as required. |
| 9 | Dismantling the existing high sensicool AC units from the shelter by cutting the frame structure from the base plate i/c inner housing from its positions after disconnecting of power supply etc. and shifting all the materials up to the transportation vehicle or to the storage location of the same / nearby building etc. as required. |
| 10 | Transportation of the dismantled electrical equipment&accessories such asMCBDBs, cables, conduits, fans, fittings, meter box/feeder panel, earth materials, Split AC / Window ACunits (up to 02nos)/sensicool AC unit, Ex-fan for free cooling etc. from theBTS sites(shelter/room type)to the Electrical store as per the direction ofEngineer - In- Charge within 50KM distance by suitable transporting medium i/cloadingat sending end and unloading at receiving endetc. as required. |
| 11 | Transportation of the dismantled electrical equipment&accessories such as Electrical power distribution panels, MCBDBs, cables, conduits, fans, fittings, meter box/feeder panel, earth materials, Split AC / Window ACunits (up to 04nos), AVR and AVR by-pass panel (up to 48KVA) etc. from theTelephone Exchange/BTS sitesto the Electrical store as per the direction ofEngineer - In- Charge within 50KM distance by suitable transporting medium i/cloadingat sending end and unloading at receiving endetc. as required. |
| 12 | Dismantling the control panel, fuel tank, exhaust pipes, fuel pipes, connecting cables and other accessories of the 15/30KVA conventional DG set etc. complete as required. |
| 13 | Removing the 15/30KVA conventional DG set along with accessories from the engine/store room to the vehicle loading point by engagement of labour, tools & plant etc. complete as required. |
| 14 | Removing the existing 15KVA canopy DG set from the roof top of the building by engaging heavy duty long boom hydra i/c shifting the same to ground floor with required tools & tackles etc. complete as required. (2nd/3rd/4th floor of building as reqd.) |
| 15 | Loading of 15/30KVA conventional/canopy type DG set at on hired vehicle at Telephone exchange / Mobile BTS sites by engagement of hydra/labour with required tools & tackles and unloading the same DG set by the same manner at the location and stacking at the desired location as per the direction of Engineer-in charge etc. complete as required. |
| 16 | Transportation of 15/30 KVA conventional/canopy type DG set at on suitable hired vehicle by road from Telephone Exchange/BTS sites within a distance of 50Kms i/c escorting etc. as per the direction of Engineer-in charge etc. complete as required. |
| 17 | Closing the wall openings for Window AC units after removing the wooden/aluminium frame if any with 10\"/15\" thick matching with original thickness by cement bricks i/c plastering etc. complete as required. |
| 18 | Removal of the 1no x 9/11mtr MS Joist pole by cutting the pole from the ground level with the help of gas cutter machine and taking out the same by engaging of suitable man powers with required tools & plant etc. complete as required. |
| 19 | Dismantling the 25KVA transformer, AB switch fuses, LA, insulators, MS channels from the DP structure and Al. cable, feeder box etc. i/c making the site accessible beforehand by trimming the branches of tree & removing the creepers etc. keeping all the materials in a safe place as per the direction of Engineer -in- charge etc as reqd. |
| 20 | Transportation ofthedismantled materials of Transformer Sub Station such as 25/63/100KVA transformer, AB Switch, HG fuse , LA, insulator, MS channels, feeder box , cable etc. fromsite to nearby Telephone Exchange / suitable storage location within a distance of 50Kmsby suitable transporting medium i/c escorting , loading at sending end & unloading at receiving endand shifting the same to a suitable place as per the direction ofEngineer - in chargefor further disposal etc. complete as required. |
| 21 | Transportation of the dismantled 9/11 metres long MS Joist poles to nearby Telephone Exchange / suitable storage location within a distance of 50Kms by suitable transporting medium i/c escorting, loading at sending end & unloading at receiving end and shifting the same to a suitable place as per the direction of Engineer - in charge for further disposal etc. complete as required. |
| 22 | Liaison with the DISCOM (TPCODL) authority for submission of EB connection surrender/closing letter and co-ordination with the field unit of the DISCOM authority for physical disconnection of 3phase LT/MV supply i/c removing/dismantling the LT/MV service connection cables & other accessories etc. complete as required. |
| 23 | Liaison with the DISCOM (TPCODL) authority for submission of EB connection surrender/closing letter and co-ordination with the field unit of the DISCOM authority for physical disconnection of 11KV HT supply i/c removing/dismantling the OH line Al. conductors (up to 2 spans) / HT cables & other accessories etc. complete as required. |