Earth work excavation in hard soil or gravelly soil within 50m. Initial lead and 1.5m initial lift including rough dressing and levelling the bed etc all complete as per the direction of the Engineer-in-charge.
2
Supplying and filling foundation and plinth with sand well watered & rammed with cost, conveyance, royalty of all materials labour required for the work as per specification and direction of the Engineer-in-Charge including royalty of materials including 1% Cess.
3
C.C(1:3:6) using 40 mm HG Crusher Broken Metal in luding cost conveyance taxes etc. complete including watering, curing with all labour and T&P required for the work etc. complete.
4
In Foundation
5
In Sub-structure
6
Providing Weep Holes is Brick Masonry/Paln/Rainforced concrete abutment, wing wall / return wall with 100mm dia AC pipe, extending through the full width of the structure wirh slope of IV:20H towards drawing force etc, complete. Please Enable Macros to View BoQ information
We takes all possible care for accurate & authentic tender information, however Users
are requested to refer Original source of Tender Notice / Tender Document published by
Tender Issuing Agency before taking any call regarding this tender.