| 1 | GROWTH OF WORK |
| 2 | HIRING OF SHORE DG |
| 3 | REPAIR OF UW VALVES |
| 4 | SUPPLY & INSTALLATION OF PORTABLE ACS |
| 5 | SOLID BLSTNG-RIGGER SECURNG & PALLET FAB |
| 6 | FLASH GUARD MODIFICATION |
| 7 | INST.BUTERFLY NUTS & PURGING COCKS-ME,DG |
| 8 | SHIFTING OF 3T DAVIT |
| 9 | 7 SEATER CAR FOR CREW |
| 10 | MODIFICATION OF BULLWORK |
| 11 | RE VALIDATION OF LIFE RAFT |
| 12 | SUPPLY OF HYDRAULIC OIL(SERVOSYSTEM HLP) |
| 13 | SHIPSTAFF OBSERVATION |
| 14 | FAB. & INSTT. OF BOLLARD |
| 15 | INSTALLATION OF CLEATS AND DECK EYES |
| 16 | REPAIR OF DOORS & HATCHES |
| 17 | PAINTING |
| 18 | SS OBSERVATION HOF JOBS (LOT 2) |
| 19 | MOD. & REPLACEMENT OF MOORING CHOCKS |
| 20 | HIRING OF BIO TOILET MODULES FOR SS |
| 21 | COMPARTMENT HANDING OVER |
| 22 | DECK COVERING IN CO\"s CABIN |
| 23 | MODIFICATION OF BULKHEAD BEARING |
| 24 | SUPPLY OF WEATHER DECK EQUIPMENT |
| 25 | MODIFICATION OF EES AND VERTICAL LADDERS |
| 26 | SUPPLY OF CAVAS COVER |
| 27 | METER CALIBRATION & PRESSURE GUAGES |
| 28 | PAINTING OF ENCLOSED BRIDGE |
| 29 | SUPPLY OF GRATINGS |
| 30 | MOD. OF AWNING & CEREMONIALCANVAS |
| 31 | PROVISION OF ADDITIONAL LIGHTS |
| 32 | TOTAL GROWTH OF WORK |
| 33 | REWORK |
| 34 | MOD. OF AER & FER -LO PUMP CONTROL PANEL |
| 35 | MOD.& FOUNDATION OF BULKHEAD SDN-L15 |
| 36 | R/R OF TUBELIGHT IN PASSAGEWAY DK.01 |
| 37 | R/R OF TUBELIGHT IN AER |
| 38 | R/R OF TUBELIGHT IN LFVDS COMPT. |
| 39 | MODIFICATION OF PRINTER CMS ROOM |
| 40 | MODIFICATION OF CCTV CAMERA |
| 41 | REMOVAL AND REINSTALLATION OF SONAR DOME |
| 42 | R/R OF HPAC STARTER PANEL AER DK.2 |
| 43 | R/R OF HORN TYPE SPEAKER WJ COMPT. |
| 44 | MOD.& REINSTALLATION OF DN ADDL JB |
| 45 | MODIFICATION OF SPS DISPLAY UNIT |
| 46 | MODIFICATION OF SPS PORT CONTROLBOX L09A |
| 47 | MODIFICATION OF DECK JB PORT |
| 48 | MODIFICATION OF SPS PORT CONTROLBOX L01A |
| 49 | MODIFICATION OF DECK JB STBD |
| 50 | MODIFICATION OF SWITCH AND FUSE PANEL |
| 51 | INSTALLATION OF WHIP ANTENNA |
| 52 | REMOVAL OF DDU UNIT DOR SPEED LOG |
| 53 | PROCUREMENT OF 100 X 100 PVC JB |
| 54 | DISCONNECTING CABLES & FAB OF NEW FOUNDA |
| 55 | REMOVE AND INSTALLTION OF WHIP ANTENNA |
| 56 | REMOVAL OF FOLDING OF THE FWD MAST |
| 57 | R/R U/VHF ANTENNA |
| 58 | 2X1 MCT INSTALLTION AND VARIOUS JOBS |
| 59 | NEW FOUNDATION FOR DAM UNIT |
| 60 | R/R FOLLD LIGHT |
| 61 | R/R LIGHTS IN LAN SERVER ROOM |
| 62 | BOOK OF POWER HVAC CABLE SIZE REVISED |
| 63 | BOOK OF POWER HVAC CABLE LAID |
| 64 | BOOK OF POWER HVAC CABLE SIZE REVISED |
| 65 | CABLE SCHEDULE FOR TRIPLE TUBE LAUNCHER |
| 66 | HULL MOUNTED TRANSDUCER CABLE LAYING |
| 67 | LAYING OF CABLE |
| 68 | MCT OPENED AND SEALED |
| 69 | 30 MM GUN CABLE LAID |
| 70 | 12.7 MM REMOTE CONTROLLED CABLE LAID |
| 71 | BOOK OF GEN POWER & LIGHTING CABLES DRES |
| 72 | MOD.IN BULWORK,SWITCH SOCKET,ANTENACABLE |
| 73 | MOD. IN HAWSER REEL BOSUN STORE |
| 74 | BULWARK MODIFICATION OF BOAT DAVIT |
| 75 | HAWSE PIPE LID FAB AND EREC WORK IN FWD |
| 76 | MOD. OF CCU RACK SEAT IN SATCOM ROOM |
| 77 | STAIRCASE REMOVAL & REFITTING IN JS MESS |
| 78 | BULWARK MODIFIED TOMATCH ROLLER FAIRLEAD |
| 79 | OPENING IN OVERHEAD GIRDER FOR DUCT |
| 80 | CUTTING,GRNDNG,FAB. & WELD 750 KG DAVIT |
| 81 | SIDE SHELL INSULATION REMOVALIN DK.3 |
| 82 | SCALLOPS INBOARD &OUTBOARD ENGINE GIRDER |
| 83 | ADDITIONAL CHEQUERED FRAMING IN AER |
| 84 | IRL TRUNK REMOVAL FROM DK.2 TO DK1 LEVEL |
| 85 | MODIFICATION OF FLASH GUARD |
| 86 | MINE RAIL WORK |
| 87 | REMOVAL OF WEIGHTS FROM PAINT STORE |
| 88 | FABRICATION OF NEW RACK |
| 89 | RACK MODIFICATION |
| 90 | ANCHOR CHAIN GUIDE POST |
| 91 | 30 MM GUN GUARD DOUBLER WORK |
| 92 | RELOCATION OF BROW |
| 93 | HAND RAILS ARRANGEMENT |
| 94 | STEP FOR BROW |
| 95 | STEPS FOR AER |
| 96 | GALLEY- MS PLATE FITMENT PANEL 500*4*6 |
| 97 | MODIFICATION OF GUN MAGAZINE RACK |
| 98 | MODIFICATION OF AFT BHD CLOSED CHOCK |
| 99 | RELOCATION OF RIU RACK SEAT IN MCO COMPT |
| 100 | FAB/EREC. FOR DAVITPETROL ENGINE-DK 01 |
| 101 | SEAT MODIFICATION FOR 3M BROW STOWAGE |
| 102 | FIT UP,WELDING,CUTTING OF EYE PLATE |
| 103 | EYE PLATE&DOUBLER GRINDING-SONAR TRANSUM |
| 104 | MOD. OF PIPE IN FWD PILOTLADDER AREA,AER |
| 105 | REMOVAL & RE-FITTING OF CHEST GRATINGS |
| 106 | BULWARK MOD. IN EWD EXPOSED AREA P&S |
| 107 | BULKHEAD & DECK PENETRATION IN ALU. DECK |
| 108 | INSULATION RE-WORK BY TURNKEY VENDORS |
| 109 | EYEPLATE,FUNNEL,RACK &INTERNAL PAINTING |
| 110 | OVERHAUL AND REFITTINGOF MD COMPRESSOR |
| 111 | MANPOWER FOR DG PARALLING AND APMS TRIAL |
| 112 | MANPOWER PROVIDED FOR TTL LIFTING |
| 113 | HPP VALVE BLOCK REMOVAL/REFIT IN PORT |
| 114 | REMOVAL AND REFITMENT OF STARTER MOTOR |
| 115 | FIRE PUMP REMOVAL AND ASSEMBLY |
| 116 | GAP/SLAGFOR(PORT, CENTRE & STBD) SHAFT |
| 117 | MANPOWER SUPPORT FOR SONAR DOME |
| 118 | REMOVAL AND REFITMENT OF FIREMAN SPOOL |
| 119 | REMOVED THE EXISTING 65 NB HYD. VALVE |
| 120 | REMOVED AND REPLACED 32 NOS. VALVE |
| 121 | MODIFICATION-ME SILENCER DRAIN POT LINE |
| 122 | REMOVAL/REPLACEMENT OF 25 NB BALL V/V |
| 123 | R/R OD FIRE PUMP SUCTION DISCHRARGE |
| 124 | EXISTING 05MM INNER DIA ORIFACE REPLACED |
| 125 | REMOVAL & REINSTALL OF ME P&S FLOW METER |
| 126 | REMOVAL & REINSTALL OF QUICK RELEASE V/V |
| 127 | ME & DG EXHAUST IRSS FOR SENSOR |
| 128 | REPLACEMENT OF PRESSURE REDUCE VALVE |
| 129 | PREWETTNG SPRINKLER FITTING IN IRL COMPT |
| 130 | MOD. OF SALVAGE PIPELINE IN GUN MAGAZINE |
| 131 | ALTERNATOR ENCLOSURE ACCESS IN FER |
| 132 | AIR ESCAPE BREATHER PORT BRIDGE WING WT |
| 133 | DRAINAGE SYSTEM FOR RAIN WATER |
| 134 | PREWETTING SPRINKLER&BREATHER TO BOLLARD |
| 135 | FIRE HYDRANT INSTALLED BILGE FRAME INAER |
| 136 | FIRE MAIN HYDRAN FITTING IN EDG ROOM |
| 137 | RELOCATION OF WJC BILGE EDUCTOR PIPELINE |
| 138 | MODIFICATION/RELOCATION FIREMAIN SYSTEM |
| 139 | HYDRANT RELOCATION IN DG COMPARTMENT |
| 140 | FIRE HYDRANT WHEEL LOBBY MOD. IN LOBBY |
| 141 | SPOOL REFITMENT/REPLACE IN IRL MAGAZINE |
| 142 | HE DRAIN ADDITONAL PROVISION |
| 143 | SPOOL ERECTION OF CITADEL SYSTEM |
| 144 | PRESSURE REDUCING VALVES IN THE CALP SYS |
| 145 | EMERGENCY EXHAUST PUMP DRAIN LINE VALVE |
| 146 | SUITABLE PROVISIONFOR OPERATION OF V/V |
| 147 | EQUIPMENT IN VICINITY OF LIQUID CARRYING |
| 148 | MFF LINE , SPOOL MODIFICATION |
| 149 | MODIFICATION OF SCUPPER SPOOL |
| 150 | MODIFICATION OF HE ADDITONAL DRAIN LINE |
| 151 | REF PLANT RELIEF LINE |
| 152 | STRAINER PURGING COCK TUBE FITMENT |
| 153 | M52 IMO STANDARD DISCHARGE ADDL ELBOW |
| 154 | MODIFICATION-AFT ER ME FO RU TANK SPOOL |
| 155 | AFT ER PORT SEA CHEST AIR VENT SPOOL MOD |
| 156 | MALFUNCTIONING OF FWD ER HP AIRVALVE |
| 157 | R/R OF 25 NBSDNR VALVE |
| 158 | FUEL OIL TANK SOUNDING CAP CHAIN REPLCD |
| 159 | MOD PRE- WETTINGLINE EXISTING 6 NOZZLE |
| 160 | MANIFOLD SPOOL DRAIN LINE MOD |
| 161 | LP AIR LINE ROUTING |
| 162 | STP UNIT CHOCK VALVE REMOVAL & REPLACED |
| 163 | MODIFICATION OF HE UNIT DRAIN LINE |
| 164 | MODIFICATION OF HE UNIT DRAIN LINE |
| 165 | REPLACED THE ME SW COOLING LINE |
| 166 | SEA CHEST SWC LINE STRAINER PURGING COCK |
| 167 | FOT & FW SHORE CONNECTION REMOVED |
| 168 | MODIFICATION OF FIRE MAIN SPOOL |
| 169 | REF & LOBBY AREAHYDROPHORE RELIEF DK 3 |
| 170 | HYDROPHORE TANK RELIEF LINE |
| 171 | V/V B/W PORT & CENTRE DGFOR OPERATION |
| 172 | STP ROOM FW ARRNGEMENT WITH SIP UNIT |
| 173 | SALVAGE SPOOL MOD & EDUCTOR SUCTION V/V |
| 174 | MD & DD HPAC RELIEF LINE PROVIDED |
| 175 | HE 11 ADDITIONALDRAIN LINE |
| 176 | FW SERVICE POINT CONNECTION FOR MFF LINE |
| 177 | FO PURIFIER DISCHARGE V/V LEAK RECTIFIED |
| 178 | COMPT COMMENT CLOSING LO PURIFIER RELEIF |
| 179 | INSTT.FLEXIBLE HOSE SUITABLE VLV CONNECT |
| 180 | FOT VALVE SERVICE |
| 181 | ATU-4 ADDITIONAL DRAIN LINE |
| 182 | FOT 3 WAY VALVE SERVICE |
| 183 | MALFUNCTIONING OF SDNR VALVE |
| 184 | FLEXIBLE HOSE ARRANGEMENT |
| 185 | IRL MAGAZINE MFF DRAIN HOSE |
| 186 | WEATHER DECK 02 PROVISION FOR FW SYSTEM |
| 187 | MFF PROVISION TO BE PROVIDED |
| 188 | FOT VALVE SERVICE |
| 189 | HOSE TO BE PROVIDED FOR FW CHARGING |
| 190 | STP ROOM 65NB STROM V/V REMOVE & REPLCED |
| 191 | COMPARTMENT HANDING OVER COMMENTS |
| 192 | BOOK OF POWER HVAC CABLE SIZE REVISED |
| 193 | BOOK OF POWER HVAC CABLE SIZE REVISED |
| 194 | BOOK OF POWER HVAC CABLE SIZE REVISED |
| 195 | BOOK OF POWER HVAC CABLE SIZE REVISED |
| 196 | BOOK OF POWER HVAC CABLE SIZE REVISED |
| 197 | BOOK OF POWER HVAC CABLE LAID |
| 198 | BOOK OF POWER HVAC CABLE SIZE REVISED |
| 199 | CABLE SCHEDULE FOR TRIPLE TUBE LAUNCHER |
| 200 | CABLE SCHEDULE FOR TRIPLE TUBE LAUNCHER |
| 201 | CABLE SCHEDULE FOR TRIPLE TUBE LAUNCHER |
| 202 | HULL MOUNTED TRANSDUCER CABLE LAYING |
| 203 | HULL MOUNTED TRANSDUCER CABLE LAYING |
| 204 | HULL MOUNTED TRANSDUCER CABLE LAYING |
| 205 | BOOK OF GEN POWER & LIGHTING CABLES DRES |
| 206 | RACK MODIFICATION |
| 207 | RACK MODIFICATION |
| 208 | RACK MODIFICATION |
| 209 | RACK MODIFICATION |
| 210 | COMPT COMMENT CLOSING LO PURIFIER RELEIF |
| 211 | MODIFICATION OF FIRE MAIN SPOOL |
| 212 | TOTAL REWORK |