| 1 | Demolishing cement concrete manually/by mechanical means including disposal of material within 50 meters lead as per direction of Engineer-incharge:1:3:6 or richer mix (i/c equivalent design mix) |
| 2 | Demolishing R.C.C. work manually/by mechanical means including stacking of steel bars and disposal of unserviceable material within 50 meters lead as per direction of Engineer-in-charge. |
| 3 | Earth work in Excavation by manual means over areas ( exceeding 30cm and up to 1.5 mtr in depth, 1.5 mtr in width as well as 10 sqm on plan) including disposal of excavated earth up to 1 mtr from cutting edge, disposed earth is to be leveled and neatly dressed in All kinds of soils. |
| 4 | \"Providing and laying in position cement concrete of specified grade including curing butexcluding the cost of centring and shuttering. All work upto plinth level with: 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size)\". |
| 5 | Providing and laying in position specified grade of reinforced cement concrete including curing but excluding the cost of centering, shuttering, finishing and reinforcement. All works upto plinth level 1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size) |
| 6 | \"Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing inposition and binding all complete upto plinth levelThermo-Mechanically Treated bars of grade Fe-500D or more\" |
| 7 | Centering and Shuttering including strutting, propping etc. and removal of Formwork for foundation complete job |
| 8 | Steel work welded in built up sections/framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steelprimer using structural steel etc. as required. In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works. |
| 9 | 12mm thick cement plaster of mix 1:4 |
| 10 | Providing and Fixing of GI Pipes 15mm complete with GI fittings |
| 11 | Removal of Excavated Malba dismantled unserviceable material from site of work. |
| 12 | Providing and Laying DPC 50mm thick with cement concrete 1:2:4 |
| 13 | Brick work with common burnt clay F.P S ( non modualar) bricks of class designation 7.5 in foundation and plinth and curing in cement lime mortar 1:1:6(1 cement : 1 lime putty: 6 fine sand) |
| 14 | Extra for brick work with common burnt clay bricks/cement concrete bricks in superstructure above plinth level upto floor five level |
| 15 | Providing and Fixing of inaguration stone |
| 16 | Carriage of constructed material (sand + Aggregate) Please Enable Macros to View BoQ information |