| 1 | Demolishing cement concrete manually/by mechanical means including disposal of material within 50 meters lead as per direction of Engineer-incharge:1:3:6 or richer mix (i/c equivalent design mix) |
| 2 | Demolishing R.C.C. work manually/by mechanical means including stacking of steel bars and disposal of unserviceable material within 50 meters lead as per direction of Engineer-in-charge. |
| 3 | Earth work in Excavation by manual means over areas ( exceeding 30cm and up to 1.5 mtr in depth, 1.5 mtr in width as well as 10 sqm on plan) including disposal of excavated earth up to 1 mtr from cutting edge, disposed earth is to be leveled and neatly dressed in All kinds of soils. |
| 4 | Supplying, stacking and Laying, spreading and compacting stone aggregate of 53 mm to 22.4 mm WBM Grade III specifications in uniform thickness, hand picking, rolling with 3 wheeled road / vibratory roller 8-10 tonne capacity in stages to proper grade and camber, applying and brooming requisite type of screening /binding material to fill up interstices of coarse aggregate, watering and compacting to the required density. Complete job. |
| 5 | Providing and applying tack coat using hot straight run bitumen of grade – VG-30, including heating the bitumen, spraying the bitumen with mechanically operated spray unit fitted on bitumen boiler, cleaning and preparing the existing road surface as per specifications.On W.B.M. @ 0.75 Kg/sqm. |
| 6 | Providing and applying tack coat using hot straight run bitumen of grade – VG-30, including heating the bitumen, spraying the bitumen with mechanically operated spray unit fitted on bitumen boiler, cleaning and preparing the existing road surface as per specifications.On bitumen surface @ 0.50 Kg/sqm |
| 7 | 2.5 cm premix carpet surfacing with 2.25cum and1.12 cum of stone chippings of 13.2 mm and 11.2mm size respectively per 100 sqm and 52 kg and 56 kg of hot bitumen per cum of stone chippings of 13.2 mm and 11.2 mm size respectively including a tack coat with hot straight run bitumen including consolidation with road roller of 6 to 9 tonne capacity etc. complete (tack coat to be paid for separately).With paving Asphalt grade VG-30 with no solvent complete all job. |
| 8 | Providing and laying seal coat of premixed fine aggregate (passing 2.36 mm and retained on 180 micron sieve) with bitumen using 128 kg of bitumen of grade VG-30 bitumen per cum of fine aggregate and0.60 cum of fine aggregate per 100 sqm of roadsurface including rolling and finishing with road all complete. |
| 9 | \"Providing and laying in position cement concrete of specified grade including curing butexcluding the cost of centring and shuttering. All work upto plinth level with: 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size)\". |
| 10 | Providing and laying in position specified grade of reinforced cement concrete including curing but excluding the cost of centering, shuttering, finishing and reinforcement. All works upto plinth level 1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size) |
| 11 | \"Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing inposition and binding all complete upto plinth level Thermo-Mechanically Treated bars of grade Fe-500Dor more\" |
| 12 | Centering and Shuttering including strutting, propping etc. and removal of Formwork for foundation complete job |
| 13 | Steel work welded in built up sections/framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steelprimer using structural steel etc. as required. In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works. |
| 14 | 12mm thick cement plaster of mix 1:4 |
| 15 | Providing and Fixing of GI Pipes 15mm complete with GI fittings |
| 16 | Removal of Excavated Malba dismantled unserviceable material from site of work. |
| 17 | Providing and Laying DPC 50mm thick with cement concrete 1:2:4 |
| 18 | Providing and Fixing of inaguration stone |
| 19 | Carriage of constructed material (sand + Aggregate) |
| 20 | Engagement of labour for site clearance Please Enable Macros to View BoQ information |