| 1 | Demolishing cement concrete manually/by mechanical means including disposal of material within 50 meters lead as per direction of Engineer-incharge:1:3:6 or richer mix (i/c equivalent design mix) |
| 2 | Demolishing R.C.C. work manually/by mechanical means including stacking of steel bars and disposal of unserviceable material within 50 meters lead as per direction of Engineer-in-charge. |
| 3 | Earth work in Excavation by manual means over areas ( exceeding 30cm and up to 1.5 mtr in depth, 1.5 mtr in width as well as 10 sqm on plan) including disposal of excavated earth up to 1 mtr from cutting edge, disposed earth is to be leveled and neatly dressed in All kinds of soils. |
| 4 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:5:10 (1 cement : 5 coarse sand : 10 graded stone aggregate 40 mm nominal size) |
| 5 | \"Providing and laying in position cement concrete of specified grade including curing butexcluding the cost of centring and shuttering. All work upto plinth level with: 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size)\". |
| 6 | Providing and laying in position specified grade of reinforced cement concrete including curing but excluding the cost of centering, shuttering, finishing and reinforcement. All works upto plinth level 1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size) |
| 7 | \"Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing inposition and binding all complete upto plinth levelThermo-Mechanically Treated bars of grade Fe-500D or more\" |
| 8 | Centering and Shuttering including strutting, propping etc. and removal of Formwork for foundation complete job |
| 9 | Steel work welded in built up sections/framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steelprimer using structural steel etc. as required. In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works. |
| 10 | 12mm thick cement plaster of mix 1:4 |
| 11 | Providing and laying 60mm thick factory made cement concrete interlocking paver block of M-30 grade made by block making machine with strong vibratory compaction and of approved size and design/shape laid in required colour and pattern over and including 50mm thick compacted bed of fine sand, filling the joints with coarse sand etc. all complete as per direction of Engineer-in-charge. |
| 12 | Providing and Fixing of GI Pipes 15mm |
| 13 | Providing and fixing of 60mm thick interlocking paver tile to be laid in cement mortar 1;4 mix & fill joint with c.mortar 1:3 mix complete job |
| 14 | Providing and fixing on wall face un-plasticized Rigid PVC rain water pipes conforming to IS: 13592 Type A including jointing with seal ring conforming to IS: 5382 leaving 10 mm gap for thermal expansion. Single socketed pipes 75 mm diametre |
| 15 | Providing and fixing on wall face un-plasticized Rigid PVC rain water pipes conforming to IS: 13592 Type A including jointing with seal ring conforming to IS: 5382 leaving 10 mm gap for thermal expansion. Single socketed pipes 110 mm diametre |
| 16 | Providing and fixing on wall face un-plasticized - PVC moulded fittings/accessories for un plasticized Rigid PVC rain water pipes conforming to IS : 13592 Type A including jointing with seal ring conforming to IS : 5382 leaving 10 mm gap for thermal expansion. Bend 87.5° 75 mm beend |
| 17 | Providing and fixing on wall face un-plasticized - PVC moulded fittings/accessories for un plasticized Rigid PVC rain water pipes conforming to IS : 13592 Type A including jointing with seal ring conforming to IS : 5382 leaving 10 mm gap for thermal expansion. Bend 87.5° 110 mm bend |
| 18 | Providing and fixing on wall face un-plasticized - PVC moulded fittings/accessories for un plasticized Rigid PVC rain water pipes conforming to IS : 13592 Type A including jointing with seal ring conforming to IS : 5382 leaving 10 mm gap for thermal expansion. Coupler 75 mm bend |
| 19 | Providing and fixing on wall face un-plasticized - PVC moulded fittings/accessories for un plasticized Rigid PVC rain water pipes conforming to IS : 13592 Type A including jointing with seal ring conforming to IS : 5382 leaving 10 mm gap for thermal expansion. Coupler 110 mm bend |
| 20 | Removal of Excavated Malba dismantled unserviceable material from site of work. |
| 21 | Providing and Laying DPC 50mm thick with cement concrete 1:2:4 |
| 22 | Providing and Fixing of inaguration stone |
| 23 | Carriage of constructed material |
| 24 | Engagement of labour for site clearance Please Enable Macros to View BoQ information |