|
| 1 | Supply and fixing in replacement mechanical laundry shaft including \"o\" ring bearing seal, opening of laundry drum and refixing it after repair/replacement of laundry shaft with bearings, greasing and \"o\" ring bearing seal complete as specified and as directed. |
| 2 | Comprehensive preventive and periodical maintenance of electric passenger Lift No. 01 of OMEX make lift in G+3 storey in reliably safe and efficient operating condition by regularly examine, lubricating and adjust the equipment and carry out planned maintenance in a systematic and controlled manner of one No 15 passenger lift capacity 1020 Kg speed 1 m/s equipped with microprocessor based AC variable voltage variable frequency controller, AC Motor governor ropes driving sleave, travelling cable working and electric fitting, microprocessor card, rectifier card, controller AC drive, door drive, indication card, SMPS luminous card and hall button and landing door shoe car guide shoe landing, CWT guide shoe landing, transformer, motor bush hooter, FP Card door hanger roller, door sensor, complete all as specified and as directed. |
| 3 | Comprehensive preventive and periodical maintenance of electric passenger Lift No. 02 of OMEX make lift in G+3 storey in reliably safe and efficient operating condition by regularly examine, lubricating and adjust the equipment and carry out planned maintenance in a systematic and controlled manner of one No 15 passenger lift capacity 1020 Kg speed 1 m/s equipped with microprocessor based AC variable voltage variable frequency controller, AC Motor governor ropes driving sleave, travelling cable working and electric fitting, microprocessor card, rectifier card, controller AC drive, door drive, indication card, SMPS luminous card and hall button and landing door shoe car guide shoe landing, CWT guide shoe landing, transformer, motor bush hooter, FP Card door hanger roller, door sensor, complete all as specified and as directed. |
| 4 | Comprehensive preventive and periodical maintenance of electric passenger Lift No. 03 of OMEX make lift in G+3 storey in reliably safe and efficient operating condition by regularly examine, lubricating and adjust the equipment and carry out planned maintenance in a systematic and controlled manner of one No 13 passenger lift capacity 884 Kg speed 1 m/s equipped with microprocessor based AC variable voltage variable frequency controller, AC Motor governor ropes driving sleave, travelling cable working and electric fitting, microprocessor card, rectifier card, controller AC drive, door drive, indication card, SMPS luminous card and hall button and landing door shoe car guide shoe landing, CWT guide shoe landing, transformer, motor bush hooter, FP Card door hanger roller, door sensor, complete all as specified and as directed. Notes for Item 2 to 4:- (a) (i) Labour component required for the replacement of unserviceable parts shall be deemed to be included in the unit rate quoted against this item. (ii) Major parts (as required) shall be measured and paid separately under appropriate items of this Sch \"A\".(iii)T&Pfor replacement of minor/major parts will be arranged by the contractor and the cost thereof shall be deemed to be included in the unit rate quoted against this item. (iv) Contractor shall be fully responsible for full and noise less functioning of lift 24x7 days. (v) Each Job shall be considered for 03 Months.(b) The above maintenance shall be done through only E-in-C\"s Branch approved OEM rep or authorised rep or authorised agent of OEM i.e M/S Kone India, M/S Schindier India Pvt Ltd., M/S Kinetic hyundai Elevator & movement tech Ltd., M/S Hitachi Lifts India Pvt Ltd, M/S Mitsubishi Elevator India Pvt Ltd, M/S Otis Elevator Company India Ltd, M/S Fujitech India Pvt Ltd, M/S Johnson Lifts Pvt Ltd, M/S Thyssenkurupp Elevator India Pvt Ltd. M/S Omega Elevators, M/S Escon Elevators Pvt Ltd, M/S LT Elevators Pvt Ltd and M/S IES Elevators or any other OEM approved by E-in-C\"s Branch. |
| 5 | Notes for Serial item No. 2.00 to 4.00 :-(i) As per OEM (Original Equipment Manufacturer) generated inspection report shall be submitted immediately after conclusion of contract and then at a frequancy of three months by the contractor. (ii)All repairs, overhauling, requirement of spares for repair/replacement under this contract shall be based on inspection report genereated by OEM. (iii)If lift is not operational/break down for period more than 2 days for minor repairs or beyond seven days for major repairs than a penalty @ Rs. 1000/- per day shall be levied on contractor. The offload and onload date and time of breakdown shall be obtained from users. (iv) Regarding the breakdown is major or minor, same shall be decided by GE and the decision of GE in this regard shall be final and binding. |
| 6 | Supply only the following spare parts / components for 13/15 passenger lift G+3 storey in MH bldg required to be replaced under serial item No 2.00 to 4.00 here-in-before, Make :- OMEX Elevators. |
| 7 | Travelling Cable, 5mm |
| 8 | Landing door spring |
| 9 | Car Door Roller |
| 10 | Landing door mechanical lock |
| 11 | Landing door lock contact (Male + Female) |
| 12 | Landing door Key (mechanical) |
| 13 | Push button |
| 14 | Steel door Rope 3mm dia complete with accessories |
| 15 | Door shoe |
| 16 | Rectifier card |
| 17 | Landing door header |
| 18 | Car door hanger |
| 19 | Governor steel rope 8 mm dia |
| 20 | Maintenance box |
| 21 | Flexible copper conductor cable of size 1.5 Sqmm 12 core |
| 22 | Car gate Lock set |
| 23 | Display card |
| 24 | Door seal |
| 25 | Door belt |
| 26 | Limit switch |
| 27 | Read switch |
| 28 | Header roller |
| 29 | Header Incentry |
| 30 | Pully of main machine |
| 31 | Magnet coil |
| 32 | Gate lock |
| 33 | Alarm Hooter |
| 34 | Fire main switch |
| 35 | Steel wire rope 13 mm dia |
| 36 | LOP Switch (Landing Operating Panel) |
| 37 | COP Switch (Car operating panel) |
| 38 | Door Sensor |
| 39 | Fire Switch Glass |
| 40 | Lift master complete |
| 41 | Door coupler |
| 42 | Gear set complete |
| 43 | Main drive complete |
| 44 | Door drive 1.0 HP (Door drive control sensor) |
| 45 | Lift Gear box oil |
| 46 | M&L in replacement main panel for controlling of 13/15 passenger lifts made out of sheet steel metal of size 90cm x 90cm x 25cm indoor with the following accessories (a) PCB - 02 Nos (b) Connector - 05 Nos (c ) Fuse assembly - 01 Set (d) Transformer 300 VA range 230 Volts to 440 Volt - 01 No (e)Single phase preventer type S-B make ADCD - 01 No |
| 47 | M&L for rewinding and refixing of induction motor with suitable guage of super enamelled copper conductor including winding with fibre cloth/PVC insulated winding paper, superior quality varnishing, servicing of ball bearing, suitable main connection from coil to terminal box, opening of motor, cutting /removing old burnt winding coils, cleaning /filling the stater slots, necessary mechanical work for shaft/ bearing housing, preparing and inserting coils running /starting winding, interconnecting, fixing, soldering, jointing, heating, drying up coils, connection and testing at site, satisfactory running of motor of capacity 12.5 HP, 3 Phase, 440 Volts, 50 Hz, complete all as specified and as directed. |
| 48 | M&L for rewinding and refixing of induction motor with suitable guage of super enamelled copper conductor including winding with fibre cloth/PVC insulated winding paper, superior quality varnishing, servicing of ball bearing, suitable main connection from coil to terminal box, opening of motor, cutting /removing old burnt winding coils, cleaning /filling the stater slots, necessary mechanical work for shaft/ bearing housing, preparing and inserting coils running /starting winding, interconnecting, fixing, soldering, jointing, heating, drying up coils, connection and testing at site, satisfactory running of motor of capacity 15 HP, 3 Phase, 440 Volts, 50 Hz, complete all as specified and as directed. |
| 49 | Comprehensive preventive and periodical maintenance (Revomax) of boiler (02 Nos) of capacity 200 Kg, steam pressure 5.5-7.5 Kg/sqcm and water consumption 200 Ltrs/Hr, regular examine, lubricating and adjust equipment and carry out planned maintenance in a systematic and controlled manner complete all as specified and as directed.Notes :- (a) (i) Labour component required for the replacement of unserviceable parts shall be deemed to be included in the unit rate quoted against this item. (ii) Major parts (as required) shall be measured and paid separately under appropriate items of this Sch \"A\".(iii)T&Pfor replacement of minor/major parts will be arranged by the contractor and the cost thereof shall be deemed to be included in the unit rate quoted against this item. (iv) Contractor shall be fully responsible for full functioning of boilers 24x7 days. (v) Each Job shall be considered for 03 Months. (vi) OEM (Original Equipment Manufacturer) generated inspection report shall be submitted immediately after conclusion of contract and then at a frequancy of three months by the contractor. (vii)All repairs, overhauling, requirement of spares for repair/replacement under this contract shall be based on inspection report genereated by OEM. (viii)If boilers are not operational/break down for period more than 2 days for minor repairs or beyond seven days for major repairs than a penalty @ Rs. 1000/- per day shall be levied on contractor. The offload and onload date and time of breakdown shall be obtained from users. (ix) Regarding the breakdown is major or minor, same shall be decided by GE and the decision of GE in this regard shall be final and binding. |
| 50 | Supply only the following spare parts/components for boiler inMH bldg required to be replaced under serial item No. 9.00 here-in-before,of existing make :- |
| 51 | Hose pipe |
| 52 | Pneumatic Valve |
| 53 | Display board |
| 54 | Steam solenoid valve |
| 55 | Gas kit complete set |
| 56 | Motor Coil 1.5 HP |
| 57 | Oil Pump |
| 58 | Stop Valve |
| 59 | NRV 3/4\" |
| 60 | V-Belt |
| 61 | Relay |
| 62 | Oil Seal |
| 63 | UV Cell |
| 64 | Pressure Gauge 300 psi |
| 65 | Globe Valve |
| 66 | Streem Trap 1\" |
| 67 | Electrode Rods |
| 68 | Asbestos Rope |
| 69 | Comprehensive preventive and periodical maintenance of mechanical laundry by the reprentative of company (Make - Fabecare), 03 Nos, Drying tumbler 30 Kg capacity (02 Nos) and 03 Nos of Flat iron machines regularly examine, lubricating and adjust the equipment and replacement of unserviceable parts, fuel pump coupling, burner blow, limit switch, Diesel filter, timer ignition/ sparking rod, pressure gauge, tempreature controller, etc and made functional including carryout planned maintenance in a systematic and controlled manner complete all as specified and as directed.Notes :- (a) (i) Labour component required for the replacement of unserviceable parts shall be deemed to be included in the unit rate quoted against this item. (ii) Major parts (as required) shall be measured and paid separately under appropriate items of this Sch \"A\".(iii)T&Pfor replacement of minor/major parts will be arranged by the contractor and the cost thereof shall be deemed to be included in the unit rate quoted against this item. (iv) Contractor shall be fully responsible for full functioning of laundry 24x7 days. (v) Each Job shall be considered for 03 Months.(vi) The rate for replacement of Elbow 2mmx8mm, nipple 2mmx 8mm, PU pipe 8mm dia, reducer, nuts, bolts, washers, etc minor parts shall be deemed to be included in the unit rate quoted against this item. (vii) OEM (Original Equipment Manufacturer) generated inspection report shall be submitted immediately after conclusion of contract and then at a frequancy of three months by the contractor. (viii)All repairs, overhauling, requirement of spares for repair/replacement under this contract shall be based on inspection report genereated by OEM. (ix)If mechanical laundry, Drying tumbler, Flat iron machines, etc are not operational/break down for period more than 2 days for minor repairs or beyond seven days for major repairs than a penalty @ Rs. 1000/- per day shall be levied on contractor. The offload and onload date and time of breakdown shall be obtained from users. (x) Regarding the breakdown is major or minor, same shall be decided by GE and the decision of GE in this regard shall be final and binding. |
| 70 | Supply only the following spare parts/components for Mechanical laundry 30 Kg washer Extractor in MH bldg required to be replaced under serial item No. 11.00 here-in-before, Make :- FABECARE. |
| 71 | Wash starker |
| 72 | Solenoid valve |
| 73 | Hose pipe |
| 74 | Angle valve |
| 75 | Power Display |
| 76 | Oil seal \"O\" ring |
| 77 | Rubber Hose Pipe 3 x 1 metre |
| 78 | Rubber Hose Pipe 2 x 1 metre |
| 79 | V-Belt (B-92) |
| 80 | Door gasket |
| 81 | FRL 1/2\" |
| 82 | Pneumatic Valve 3\" |
| 83 | Pneumatic Valve 2\" |
| 84 | Steam Valve 1\" |
| 85 | Door Lock |
| 86 | Metalic steam house pipe 1\" |
| 87 | Shock absorbers |
| 88 | FRL unit (Filter, Regulator and Lubricator Unit) 1/4\" (8mm) |
| 89 | Supply only the following spare parts/components for heating system boiler - 02 Nos of cap 200 Kg, steam pressure 5.5 -7.5 Kg/sqcm and water consumption 200 Ltrs/Hr at MH bldg required to be replaced under serial item No. 9.00 here-in-before, Make :- Existing make:- |
| 90 | Burner fuel pipe |
| 91 | Diesel pipe |
| 92 | Dieselfilter |
| 93 | GPC 503 |
| 94 | Coupling shaft |
| 95 | Coupling belt |
| 96 | Steam saftey valve |
| 97 | Pneumatic Actuator, make Aira |
| 98 | Gate valve of size 25 mm dia |
| 99 | Burner rod assembly |
| 100 | Oil spray nozzel |
| 101 | Boiler pressure switch |
| 102 | Water Pump |
| 103 | Sequence Controller |
| 104 | Photo Cell with Socket |
| 105 | Temperatore Controller |
| 106 | Contactor Safety |
| 107 | Nozzle |
| 108 | Descalling Chemical energy flock 1110 |
| 109 | Water Seal |
| 110 | Valve Set Assy |
| 111 | Water level switch |
| 112 | Bearing. |
| 113 | Supply only the following spare parts/components for flat Iron Machine in repair of serial item No. 11.00 here-in-before :- |
| 114 | Single phase preventer (VSPD-I) |
| 115 | Steam angle valve 1/2\" |
| 116 | Bearing |
| 117 | M&L for Chest Cleaning or polishing flat Iron Machine complete all as specified and directed. |
| 118 | M&L for greasing, oiling and servicing/ overhauling complete including replacement of all connected items complete to make servicable 30 Kg drying tumbler machine (02 Nos) complete all as specified and directed. |
| 119 | M&L in replacement Contactor, 3 Pole, 32 Amp, AC operated, 415 Volts Make : Type ML-2 of L&T or equivalent in makes mentioned in Appendix \"B\" here-in-after complete all as specified and directed. |
| 120 | Supply and fixing in replacement LED fitting low height downlighter 12 Watt, CCT 5700K, complete with standard profile linear LED lighting fixture, prewired and connecting up with & including 2 core flexible copper conductor cable 23/0.00076 from ceiling rose to light fitting, with all accessories and following specifications complete all as specified & as directed :-(a) Lumen efficacy of luminaire shall be minimum 100 lumen per watt.(b) Voltage operating range : 160 to 270 Volts.(c) Temp operating range : Minus 10 degree C to Plus 50 degree C. (d) Power Factor : Minimum 0.95(e) THD : Max 10%(f) IP rating : IP-65(g) CRCA pre coated housing(h) LED driver |
| 121 | M&L for galvanized steel water tubing medium grade of 25mm bore with & including all fittings, fixed to walls and ceilings or laid in floors, including taking up or down existing unserviceable steel water tubing and connections of 25mm bore complete all as specified and as directed. complete all as specified and as directed. |
| 122 | S&F in repairs 25mm bore stop valve, cast copper alloy, screwed down, high pressure with crutch or butterfly handle screwed both ends for iron pipe or for unions complete all as specified & as directed. |