| 1 | Supply, Laying, testing and commissioning of Medical grade copper pipe as per standerd BS:EN:13348:2008/ASTM B819 standards, Seamless, deoxidized, half hard, tempered and degreased copper pipe conformimg to the standard. All copper pipe should be degrrased & delivered capped at both ends of required sizes, complaint to the specifications. Pipe line should be suitable installed on PVC/Plastic saddles and connecting copper fittings. After installation pipe line should be pressure tested to minimum 5.5 bar as per engineering norms for 24 hours complete all as specified and as directed by Engineer-in-Charge. Make-Maxflow/Janya/Mandav |
| 2 | 12 MM outer dia x 0.7 mm thick |
| 3 | 15 MM outer dia x 0.9 mm thick |
| 4 | Gas Outlet Points/Terminal Units with Probe/adaptors: Supply, Testing and Commissioning of Gas Outlet points for Oxygen and Vacuum with suitable Lockablequick connecting adaptors made of Stainless Steel. Outlet points should be quick connect type and with colour coding for different gas sources and must have DIN/CE/CDSCO Certification. Make-MEC/MDD/MPS/Altos |
| 5 | Oxygen |
| 6 | Suction |
| 7 | Medical Gas Alarm Panel: Supply, Installation, Testing and commissioning of Digital Medical Gas Alarm Panel Provided with Audio and visual Alarm for high and low gas pressure, test and alarm acknowledge and it should be certified with DIN/CE/CDSCO. for Double (Oxygen & Suction) Gas services.Make-MPS/MEC/MDD/Altos. |
| 8 | Oxygen System |
| 9 | Oxygen Manifold-Main (3+3): Supply,Installation, Testing and Commissioing of Oxygen Manifold System with two banks suitable for three connection on each side, top frame comprising of High pressure copper pipes of 1\" ID X 15 swg with high pressure brass fitting made of high tensile brass and connections through Non-return valves, and Fleible Tail Pipe for Connecting to the Oxygen Cylinder. Supplied with Double Stage and Double Gauge Oxygen Regulator suitable to supply 4 bar outlet pressure to the oxygen line. Should be DIN/CE/CDSCO certified. |
| 10 | Oxygen Manifold-Emergency (1+1): Supply, Installation, Testing and Commissioing of Oxygen Manifold System with two banks suitable for One connection on each side, top frame comprising of High pressure copper pipes of 1\" ID X 15 swg with high pressure brass fitting made of high tensile brass and connections through Non-return valves, and Fleible Tail Pipe for Connecting to the Oxygen Cylinder. Supplied with Double Stage and Double Gauge Oxygen Regulator suitable to supply 4 bar outlet pressure to the oxygen line. Should be DIN/CE/CDSCO certified. |
| 11 | Line Pressure Gauge: 4\" Line pressure gauge with minimum pressure range from 0-16 Bar with suitable connection arrangement for oxygen pipeline with calibration certificate with ISO/CE certified. Make-MPS/MEC/MDD/Altos. |
| 12 | BPC Flow Meter: Supply and fix BPC(Back pressure compensated) Flow meter with humidifier bottle with provision for control of flow within a range of 0-15 lpm. The flow meter body shall be made of brass chrome plated materials. The flow tube and components shall be made of clear impact resistant polycarbonate. Humidifier bottle shall be made of unbreakable material and autoclavable at 121 degree centigrate temperature. Should be DIN/CE/CDSCO certified. Make-MPS/MEC/MDD/Altos. |
| 13 | Oxygen System |
| 14 | Supply, installation, testing and Commissionig of 3 HP Twin reciprocating compressor, base frame mounted, Electric Motor driven Vacuum pump with suitable starter panel and Cut off vacuum switch for individual pump. Electric motor- 415 V, 3 Phase, 50 Hz complete all as specified and as directed by Engr in Charge. Make-Airtech/Indo Air/Altos Capco. |
| 15 | Reservoir Tank : 280 Ltr reservoir tank, MS Powder coated, with suitable drain valve, pressure gauge and connecting valve to Vacuum line as approved by OEM of central vacuum system. |
| 16 | Anti Bacterial Filter: Supply and installation of Anti Bacterial filter, with drain facility, fully autoclavable. Make-Airtech/Indo Air/Altos Capco. |
| 17 | Ward Vacuum Unit: Supply and Installation of Ward Vacuum Unit, Light Weight and Compact. It should have 600 ml collection jar made of unbreakable glass material and fully autoclavable at 121 degree centigrade. Safety trap shall be provided inside the jar to safeguard the regulator from overflowing. A wall brakcet for mounting the jar assembly on the wall. Polycarbonate vacuum regulatorshall be adjustable and have vacuum gauge which indicates Vacuum applied by the regulator.The unit should be ISO/DIN/CE/CDSCO certified. Make-MEC/MDD/MPS/Altos |
| 18 | LP Tube for Ward Vacuum Unit: Supply and fixing of L.P. Tube for ward vacuum unit. Should be medical grade autoclavable Polycarbonate or Silicon rubber, degreased for medical use. Pipe should be suitably fitted to the outlet adaptor and Ward Vacuum Regulator.Make-MEC/MDD/MPS/Altos . |
| 19 | Isolation Valves: Supply, Installation, testing and commissioning of Non Lubricated ball type isolating valve. Valve should go full ON to full OFF with handle turn of 90 degrees. Should be DIN/CE/CDSCO certifier. Make-ELLEM/JSI/Elite. |
| 20 | 12 mm line isolating ball valves |
| 21 | 15 mm line isolating ball valves |
| 22 | S&F Walk in Coolers Size- 8 Feet x 8 Feet and 8 feet 3 inch, comprising followings:-PANELS- Fabricated out of prefabricated panels of 80mm to 100 mm, thickness minimum, modular complete with floor & ceiling panels, mounted on a flat, concrete base. Cold room is reliable under all condition for stored materials. Panels are fire resistant and self-extinguishing. Panels are plastic coated pre painted galvanised steel panels of 0.6 mm thickness or non corrosive metallic Panels. Puff density will be 40 kg/m3W.I.C floor is above 3\" from the room ground level. WIC room floor will be either prefabricated floor panels, similar to wall panels and to be attachd with wall panels with cam locks or concrete slabs to be provided in floor with insulation materials in bottom like PUF & tar felt & wall pannels to be anchroched by drive pins in floor. Capacity of the WIC-2 TR, all weather, copper wound, non cfc refrigerant, 5 star BEE rating including all copper pipes and other accessories required.Make-Blue Star/Hitachi/CarrierTEMPERATURE- WIC will maintain a internal temperature of 0 degree celcious to 8 degree celcious adjustable according to ambient temperature. It will have hold over time of 4-6 hours. INTELLIGENT CONTROL SYSTEM - The controlling system having is PLC Base PC communication on Ethernet.SAFETY - The unit is provided with safety devices for temperaure under shoot in case of malfunction. Note :- The unit work on 230 Volts AC and 50 Hz mains supply. VOLTAGE STABLIZER - Supply and fix Voltage stabilizer for automatic operation, single phase naturally air cooled indoor type& designed for input variation between 170 Vto 250 V with output voltage stabilized at 230 Vwith accuracy of ± 2.5% and of capacity5 KVA.Make of Voltage stabilizers-Microtek, V-Guard/Luminous/Voltas. |
| 23 | M&L for Earthing complete with galvanised steel earth plate electrode of size 60cm×60cm.× 6mm thick, buried directly in ground (earth pit not less than 2.25 metres deep below ground level) with top edge of the plate not less than 1.5 metres below normal ground level, connected to and including GI iron wire of size 4 mm dia by meansof GI bolts, nuts, check nuts and washers, protected by 15mm bore GI light grade ISI marked pipe upto and including test points. Earth plate shall be surrounded by alternate layer 15cm thick of charcoal or coke and common salt all aroundbottom and top , 20cm bore GI medium grade ISI marked pipe for watering and including funnel,wire mesh,PCC chamber pit made with PCC(1:3:6) type C-1(using 20mm graded stone aggregate) including necessary form work, excavation and earth work in any type of soil, returning filling and disposal of surplus soil to a distancenot exceeding 50M, pit cover 40mm thick made with RCC(1:2:4) type B-1 (using 20mm graded stone aggregate) including TMT reinforcement 8mm dia@75mm C/C both way,MS handle 12mm dia, cover rest on MS angle iron frame 40x40x6mm, embeded in concrete duly painted with two coats of synthetic enamel paint over a coat of red oxide primer, complete all as specified & shown in electrical plate No.3 of SSR 2009(Part-I) and all as directed.Note:- (i) Protection pipe and earthing strip upto 7.5 Mtrshall be included in the unit rate of this item.(ii) Earth testing arrangement should be done by contractor as per direction of Engr-In-Charge. |