| 1 | Excavation over areas for foundation, basements, roads, land/plot developement in all types of soils, vegetable earth, soft murum, running sand, shingle, turf clay, loam, peat, ash, shale, slag, chalk, garbage, muddy/ marshy/ slushy soil, marine clay, reclaimed land etc. for all depths/lifts including manual dewatering, filling the selected excavated earth at the locations as directed, in layers not more than 200mm thickness, watering, consolidating, compacting to achieve not less then 97% Modified Proctor density conforming to relevant IS, stacking the selected material in measurable heaps for future use within owners space or disposing within RCF Premises as directed, loading, unloading, leveling excluding shoring, strutting etc. complete as directed by Engineer-in-Charge. Note: 1) The rate includes the handling/supporting the existing utilities such as cables, drains, pipes, water mains etc. 2) It also includes the royalty and other taxes if any. If filling activity not executed then the rate shall be reduced by Rs. 19.5/- per Cu.M |
| 2 | Providing & Laying dry stone Rubble Soling with average 230 mm size hard stone set in regular lines, handpacked and interstices thoroughly filled with small chips including filling in with good quality murum brought from outside, compacting with Suitable compacting machine , watering, sand spreading 12mm thk. layer of grit on top etc complete as directed by Engineer In Charge. (Note: The rate includes the royalty and other taxes if any) If the voids are filled by RCF material, the rate shall be reduced by Rs. 413/- per Cu.M. if RCF rubble is used, the rate shall be reduced further by Rs. 970/- per Cu.M. This item shall be executed with prior approval. |
| 3 | Providing and laying in position plain cement concrete of specified grade cement with trap/granite/quartzite/gneiss metal mixing in concrete mixer including bailing out water, compacting, finishing surface, curing and including the cost of centering and shuttering at all level :Nominal Mix of 1:2:4 (1 cement OPC: 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) |
| 4 | Providing and laying in position ready mixed design mix M-30 grade cement concrete for reinforced cement concrete work, using cement content as per approved design mix, including pumping of concrete to site of laying and the cost of centering,shuttering, finishing and excluding reinforcement, including admixtures in recommended proportions as per IS: 9103 to accelerate, retard setting of concrete, improve workability without impairing strength and durability as per direction of Engineer-in-charge.The Mix design as per particular specfications shall be got approved by Engineer-in-Charge before execution of the item.The rate shall include cost of all specified materials and operations at all levels and heights, including the cost of centering, shuttering and and excluding reinforcement which shall be paid under relevant item.(Note :-OPC Cement content considered in this item is @ 400 kg/cum as per IS 456 table showing minimum cement content. No extra will be paid nor any amount will recovered on account of variation of cement in mix design as per specifications for controlled concrete).All works (including Centering & Shuttering)Foundations, footings, bases of columns, rafts, pilecap |
| 5 | Providing and laying in position ready mixed design mix M-30 grade cement concrete for reinforced cement concrete work, using cement content as per approved design mix, including pumping of concrete to site of laying and the cost of centering,shuttering, finishing and excluding reinforcement, including admixtures in recommended proportions as per IS: 9103 to accelerate, retard setting of concrete, improve workability without impairing strength and durability as per direction of Engineer-in-charge.The Mix design as per particular specfications shall be got approved by Engineer-in-Charge before execution of the item.The rate shall include cost of all specified materials and operations at all levels and heights, including the cost of centering, shuttering and and excluding reinforcement which shall be paid under relevant item.(Note :-OPC Cement content considered in this item is @ 400 kg/cum as per IS 456 table showing minimum cement content. No extra will be paid nor any amount will recovered on account of variation of cement in mix design as per specifications for controlled concrete).All works (including Centering & Shuttering)Walls (any thickness) including attached butteresses, retainingwall, shear wall, diaphragm wall , trench,pit walls, etc |
| 6 | Providing and laying in position ready mixed design mix M-30 grade cement concrete for reinforced cement concrete work, using cement content as per approved design mix, including pumping of concrete to site of laying and the cost of centering,shuttering, finishing and excluding reinforcement, including admixtures in recommended proportions as per IS: 9103 to accelerate, retard setting of concrete, improve workability without impairing strength and durability as per direction of Engineer-in-charge.The Mix design as per particular specfications shall be got approved by Engineer-in-Charge before execution of the item.The rate shall include cost of all specified materials and operations at all levels and heights, including the cost of centering, shuttering and and excluding reinforcement which shall be paid under relevant item.(Note :-OPC Cement content considered in this item is @ 400 kg/cum as per IS 456 table showing minimum cement content. No extra will be paid nor any amount will recovered on account of variation of cement in mix design as per specifications for controlled concrete).All works (including Centering & Shuttering)Columns, Pillars, Piers, Posts and Struts., etc |
| 7 | Providing and fixing in position steel bars reinforcement of various diameters for R.C.C. pile, pile caps, footings,raft,retaining wall,shear wall, lift wall, foundations, slabs, beams, columns, canopies, staircases, newels, chajjas, lintels, pardies, coping, fins, arches, etc. as per detailed designs, drawings and bar bending schedules,including straightening, cutting, bending, hooking the bars, binding with wires or tack welding, supporting as required etc. all complete at all levels. Corrosion Resistant Steel (500 CRS D) |
| 8 | Providing, detailing, fabricating and fixing at desired location using hot rolled sections and MS Plates of grade Fe 250 as per specifications and approved fabrication drawings (which are to be prepared by Contractor and got approved from Engineer), transporting to site and erecting structural steel members for all heights & at all levels including provision of necessary erection bolts, fixing bolts, nuts, washers, cleats, stiffeners, gussets, base plate, and all necessary fixtures and operations like preheating as per specifications, straightening, bending, cutting, drilling, grinding, machining if specified, welding, grinding and removing the welding burr and preparing surface for painting with wire brush cleaning and applying two coats of epoxy red oxide zinc phosphate primer of 30 microns each and two coats of Epoxy Corrosion Resistant Enamel paint of 30 microns after fabrication including touching up with spray painting after erection etc complete as directed by Engineer In Charge. (The qty. for this item shall be measured for gusset plates, base plates, bolts in M.T.) |
| 9 | Providing and Placing in position suitable PVC water stops conforming to IS:12200 for construction/ expansion joints between two RCC members and fixed to the reinforcement with binding wire before Serrated with central bulb (225 mm wide, 8-11 mm thick) |
| 10 | Providing and applying primer + two coats of 100% acrylic breathable, water based, anti-carbonation coating. Cracks, if any, shall be filled with Polymer modified mortar. The rate shall include complete treatment mentioned above complete as directed by the Engineer in charge. |
| 11 | Providing and applyingtwo coats of Hi-Build coal tar epoxy formulation corroseal TE-321 with an interval of minimum 4 hours - 8 hours between application of successive coats including preparing and cleaning the surface thoroughly so as to remove deposited salts, grease, oil, dust, tar etc. using coarse brush etc. complete as specified and directed. |
| 12 | Dismantling steel work in built up sections in angles, tees, flats and channels of rolling shutters, grills, gates, fencing, hoardings, including all gusset plates, bolts, nuts, cutting rivets, welding etc. including dismembering and stacking within RCF premises as directed |
| 13 | Dismantling roofing including ridges, hips, valleys and gutters etc., and stacking the material within RCF premises as directed |
| 14 | Supply of JCB with shovel having grabbing/dozing facility as per requirement including operator, cost of fuel, oil, etc. complete (Minimum payment payable is for 2 Hours in a day. less than 2 hrs. working not considered for payment. Maximum 8 Hrs. working considered for a day/shift. The actual start of work is considered as zero time. Lunch & breakdown shall be deducted from working timings.) |
| 15 | Supply of Dumper including driver, cleaner, cost of fuel, oil, etc. complete (Minimum payment payable is for 2 Hours in a day. less than 2 hrs. working not considered for payment. Maximum 8 Hrs. working considered for a day/shift. The actual start of work is considered as zero time. Lunch & breakdown shall be deducted from working timings.) |