| 1 | Supply, Erection, Testing and Commissioning of 22KV, 630A, 4 Way RMU Incoming 1 Isolator with Earth Switch and 3 Nos. 630A VCB, Outdoor with Manual and Motor Operated Spring Charging Mechanism with 230 VAC Motor, Shunt Trip Coil of 110VDC, Closing coil of 110VDC, Aux. Contact 6NO+6NC, Mechanical ON/OFF Indicator and emergency trip PUSH Button. |
| 2 | Supply, Laying, testing and commissioning of one run of 22KV, 3 x 240 Sq.mm. XLPE HT UG Cable in open trench direct in ground including excavation of trench of size 1 m (w) x 1.2 m (d) from Consumer Control RMU to 4 Panel RMU |
| 3 | Supply, laying, testing and commissioning of one run of 22KV, 3 x 150 Sq.mm. XLPE HT UG Cable through 6 Swg thick, 150 mm dia C.I. Spun pipes with collars direct in ground including excavation of trench of size 1 m (w) x 1.2 m (d) including plasterings, back filling, ramping the soil, etc. as required in RCC/ Bituminous road as specified in the tender specification |
| 4 | Supply, providing and commissioning of Special Heat shrinkable type Touch proof end termination suitable for the 22KV, 3 x 240 Sq.mm. XLPE HT UG Cable complete with termination kit etc., with all accessories as required for the above RMU. |
| 5 | Supply, providing and commissioning of Special Heat shrinkable type Touch proof end termination suitable for the 22KV, 3 x 150 Sq.mm. XLPE HT UG Cable complete with termination kit etc., with all accessories as required for the above RMU. |
| 6 | Supply, providing and commissioning of Indoor/ outdoor type end termination for the 22KV3C x 150sq.mm. (E) XLPE HT UG Cable complete with termination kit etc., with all accessories as required including the cost of crimping heavy duty Aluminium lugs,providing an earth tag, insulation tape and all requisite material for completion of termination complete with accessories etc. including supply of 1 set (3 Nos.) of right angle boot suitable to fix with the 22 KV HT bushes of the transformerNote : Cable screens shall be earthed at both ends. |
| 7 | Supply, erection, testing and commissioning of Outdoor Type 1600 KVA, 22/0.433 KV, three-phase, oil-immersed, Oil Natural Air Natural (ONAN), copper wound Energy Efficient Level-1 distribution transformers with ON Load Tap Changer, conforming to IS 1180:2014 (Part-I), suitable for operation on a 22 KV, 50 Hz, solidly earthed distribution system |
| 8 | Supply, erection, testing and commissioning of 4000A Outdoor Bus Duct running from Transformer to MV Panel with Shell made out 18/16 SWG CRCA Sheet with RAL 7032 Powder Coating with arrangment of 3Run of 150x12 Aluminium Bus Bar for each phase and 2 Runs of 150x12 of Aluminium bus bar withsuitable Aluminium flexible joint wherever required. |
| 9 | Supply, Erection, Testing and Commissioning ofIndoor type 4000A,MVPanel, floor mounting type, dust and vermin proof by construction of 14 SWG CRCA sheets Compartmentalised, (1 no. of 4000 A ACB Incomer, 1 no. of 2000A ACB outgoing, 5 Nos. of 800A ACB outgoing)modular type, Aluminium Bus bar, IP 42 Protection with powder coated panel, mounted on a base channel of 75mm x 40mm channel as per the specification |
| 10 | Supply, erection, testing and commissioning ofof 1 no. of earth electrode of 50mm G.I pipe depth of 3 mts with 25x3 Cu. flat upto ground level with funnel for watering including excavation & back filling with alternate layer of charcoal and salt including RCC earth pit chamber and cover with inter connecting GI flats of size 40x6mm as per IS 3043 for providing earthing for Body Earthing of RMU, DTR, LV Panel, Cable Duct, Yard Fencing etc. |
| 11 | Supply, erection, testing and commissioning of Transformer earthing with 50 mm Dia GI pipe earth electrode, along with 600mm x 600mm and 50x6 mm Cu. Flat -1R at the depth of 3 mts from ground level with funnel for watering including excavation & back filling with alternate layer of charcoal and salt. (including chamber/cover) as per IS 3043 |
| 12 | Supply, erection, testing and commissioning of Copper Lightning Arrester 17mm dia 1mtr Length with Multi Spike and Base Plate including accessories like bridging cable, bimetallic strip, wood screws, plastic dowels, cross connector, expansion piece, clamps, suitable concrete base part with cover for fixing air terminal, conductors holder at wall/roof/ACP etc. and all connected minor civil works if required and necessary supports as required at site. |
| 13 | Supply Fabrication and Erection of 100 Nos. of Insulator, Fastners, Clamps etc., Supply, Fabrication and Erection of 500 Kgs. Of MS Sheet Metal Sheet, channels, angles etc., 200 Mtrs., of 25 x 6 G.I. Flat and other necessary materials for fixing the above Lightning arrester. |
| 14 | Supply, erection, testing and commissioning of 40 mm Dia GI pipe earth electrode with 25x3 mm Cu. Flat -1R at the depth of 3 mts from ground level with funnel for watering including excavation & back filling with alternate layer of charcoal and salt. (including chamber/ cover) as per IS 3043 |
| 15 | Required Civil Works for making foundation and plinth for erection of 1 no. of 4 way 22 KV RMU, 3 Nos. of Transformer, 18 Meters of cable trench of size 1M x 0.75 M Covered with RCC slab for running the HT cable and spreading 40mm Blue metal jelly uniformly for a height 100 mm. |
| 16 | Required Civil Works for erection LV Panels with cable trench of size 1M x0.75M in LV Panel area comprising 6\" M25 concrete at the Top of the required brick work |
| 17 | Fabrication, Supply of 10 mm Square Rods linked fencing with spacing of 15x15 cm to a height of 1.5Mtrs. above the ground level comprimising with foundation 450mm and a retaining wall with brick all around to a height of 330mmabovegroundwithverticalmembersof100x50x6mmM.S. C-Channelat1.5mtr. Interval and tie angle at top with 25 x 6 M.S. Flat. Gates(03Nos:PYEBDP,ConsumerDP &HTPanel): 1.5mtr. Height and 1.5mtr. Width gate madeout of50 x 6mm M.S. Angles cross supports fixed on 100 x 50 x 6mm M.S. channels andcovered with 10mm Square Rods with pad locking arrangements. |
| 18 | Drawing, test reports, manuals and CEA charges: Submission 5 copies of schematic,wiring drawings, equipment manuals, detailed cable laying drawing,testing and commissiong reports of all the equipments including inspection fee for CEA. |