| 1 | Installing One No.Insulation piercing connector of size Main : 16 to 95 ,Tap : 1.5 to 16 Sq.mm |
| 2 | Erection of Anchor clamp/dead end clamp for LT ABC of any size |
| 3 | Erection of suspension clamp for LT ABC of any size |
| 4 | Transporting LT ABC by hired vehicle to a distance up to 5 km and carring up to 2 drum including loading and unloading using crane |
| 5 | Stringing of 1.1 kV Aerial bunched cable of size 3X70+1X16+1X50 sqmm with bare/insulated Messenger through existing poles |
| 6 | Transporting poles by hired vehicle to a distance upto 5km and carrying upto 4 poles excluding loading & unloading |
| 7 | Loading LT PSC pole from the stacking place and unloading the same at work site (transport by vehicle). |
| 8 | Dismantling one damaged LT PSC/RCC pole after disconnecting stays, strut etc. and stacking the same. |
| 9 | Providing WP support with PSC pole incl. digging & back filling pit. |
| 10 | Renewal of existing damaged/old LT Strut with new PSC strut in place and refitting of all items incl. conveyance (except pole). |
| 11 | Dismantling one section fuse |
| 12 | Fitting one No. Section fuse on LT line with dropping cables, crimping sockets, connecting with bolt&nut etc |
| 13 | Straightening one Slanted LT pole after unbinding the line and rebinding the line after work. |
| 14 | Fitting and erecting one HT PSC Pole in position incl. fitting cross arm, digging & back filling pit, drawing earth leads. |
| 15 | Loading HT PSC pole from the stacking place and unloading the same at work site (transport by vehicle). |
| 16 | Installing One No. 4 way Satellite Connector of size Main :16 to 95, Tap:4 to 35 Sq.mm to the LT AB cable of Standard size |
| 17 | Dismantling (without damage) one km LT Sph 2 wire OH line, cross arms, insulators and stacking the conductors in rolls. |
| 18 | Providing Stay for LT poles incl. digging & back filling pit. |
| 19 | Renewal of existing damaged/old LT stay with new stay in place and refitting of all items and conveyance of all materials. |
| 20 | Renewal of existing damaged/broken old LT stay with existing stay rod. |
| 21 | Providing spiral earthing |
| 22 | Installation of Pre-insulated straight through joints for 16sqmm cable |
| 23 | Installation of Pre-insulated straight through joints for 50sqmm cable |
| 24 | Installation of Pre-insulated straight through joints for 70sqmm cable Please Enable Macros to View BoQ information |