| 1 | dk;ZA |
| 2 | Safe carriage of the following material from Store Centre to work site including loading and unloading at both ends as per RESPO norms (in juridiction of circle) :- 13 Mtr. Long ST Poles. |
| 3 | 11 Mtr. PCC/ST Poles. |
| 4 | 09 Mtr. PCC Poles. |
| 5 | 8.5 Mtr. Long PCC Poles. |
| 6 | ACSR Weasel Conductor. |
| 7 | ACSR Rabbit Conductor. |
| 8 | ACSR Dog Conductor. |
| 9 | LT AB Cable (1×25+1×16)sq.mm |
| 10 | LT AB Cable (3×50+1×35+1×16)s sq.mm |
| 11 | LT AB Cable (3×95+1×70+1×16) sq.mm |
| 12 | LT AB Cable (3×120+1×95+1×16) sq.mm |
| 13 | T/F 11/2.5 kV, 10 kVA Single Phase |
| 14 | T/F 11/0.4 kV, 16 kVA Three Phase Al. wound |
| 15 | T/F 11/0.4 kV, 25 kVA Three Star Rating |
| 16 | T/F 11/0.4 kV, 63 kVA |
| 17 | T/F 11/0.4 kV, 100 kVA |
| 18 | T/F 11/0.4 kV, 250 kVA |
| 19 | T/F 33/11 kV, 5 MVA |
| 20 | T/F 33/11kV, 10 MVA |
| 21 | LT XLPE Cable AL. 2x6 sq. mm |
| 22 | LT XLPE Cable AL. 3.5x50 sq.mm |
| 23 | LT XLPE Cable AL. 3.5x70 sq.mm |
| 24 | LT XLPE Cable AL. 3.5x150 sq.mm |
| 25 | LT XLPE Cable AL. 3.5x240 sq.mm |
| 26 | LT XLPE Cable AL. 3.5x400 sq.mm |
| 27 | LT XLPE Cable AL. 1x120 sq.mm |
| 28 | LT XLPE Cable AL. 1x240 sq.mm |
| 29 | LT XLPE Cable AL. 1x400 sq.mm |
| 30 | LT XLPE Cable AL. 1x630 sq.mm |
| 31 | LT XLPE Cable AL. 1x1000 sq.mm |
| 32 | 11 kV XLPE Cable AL. 3x35 sq.mm |
| 33 | 11 kV XLPE Cable AL. 3x70 sq.mm |
| 34 | 11 kV XLPE Cable AL. 3x120 sq.mm |
| 35 | 11 kV XLPE Cable AL. 3x185 sq.mm |
| 36 | 11 kV XLPE Cable AL. 3x300 sq.mm |
| 37 | 33 kV XLPE Cable AL. 3x120 sq.mm |
| 38 | 33 kV XLPE Cable AL. 3x40 sq.mm |
| 39 | 33 kV XLPE Cable AL. 3x300 sq.mm |
| 40 | LT PVC Armoured Al. Cable 4x25 sq mm |
| 41 | LT PVC Un-armoured Al. Cable 4x25 sq mm |
| 42 | LT PVC Armoured Al. Cable 4x16 sq mm |
| 43 | LT PVC Un-armoured Al. Cable 4x16 sq mm |
| 44 | LT PVC Armoured Al. Cable 4x10 sq mm |
| 45 | LT PVC Un-armoured Al. Cable 4×10 sqmm |
| 46 | LT PVC Armoured Cable size 2Cx10 Sq. mm |
| 47 | LT PVC Un-armoured Cable size 2Cx10 Sq. mm |
| 48 | LT PVC Armoured Cable size 2Cx6 Sq. mm |
| 49 | LT PVC Un-armoured Cable size 2Cx6 Sq. mm |
| 50 | LT PVC Armoured Cable size 2Cx4 Sq. mm |
| 51 | LT PVC Un-armoured Cable size 2Cx4 Sq. mm |
| 52 | Armoured Control cable 4x2.5 sq. mm |
| 53 | Un-armoured Control cable 4x2.5 sq. mm |
| 54 | Armoured Control cable 2×2.5 sq. mm |
| 55 | Un-armoured Control cable 2x2.5 sq. mm |
| 56 | 33/11 K.V Line material such as Cross-Arms, Pin Insulators with pin, Guarding Angles, Guarding Wire, Disc Insulators with fittings, Various Type Cable Jointing Kits (Indoor &outdoor ) straight through, stay set, stay wire, G.I wire, Earthing rod, 1-ϕ & 3 ϕ distribution box, Lighting arrester, Fuse set, M.s angle, M.s channel etc. |
| 57 | 11 kV Pilfer Resistant Metering Cubicle |
| 58 | 33 kV Pilfer Resistant Metering Cubicle (0.2s Accuracy) |
| 59 | 11 kV CT/PT Metering Pole Mounted Unit |
| 60 | 33 kV CT/PT Metering Pole Mounted Unit |
| 61 | 11 kV VCB I/C CTR 600/300/5A, 350 MVA, 24 Volt (1250 Amp.) |
| 62 | 11 kV VCB For O/G CTR 200/100/5A 350 MVA (1250 Amp.) |
| 63 | Line Isolator 800 A, 33 kV |
| 64 | Bus Isolator 800 A, 33 kV |
| 65 | 11 kV TPMO with Polymer Insulator |
| 66 | 33 kV CT, 200/100/1-1-1A |
| 67 | 33 kV CT, 400/200/1-1-1A |
| 68 | 33 kV PT (Outdoor) (33 kV/110V) |
| 69 | 33 kV VCB 800A, 750 MVA |
| 70 | 33 kV VCB 1250 A |
| 71 | Transformer Oil Fresh |
| 72 | Battery Charger 24 Volt |
| 73 | Battery Set 12 Nos. x 2 Volts, 200 Ah |
| 74 | 11 kV Bus Coupler (1250 A) |
| 75 | 33 kV Control Panel for Single Transformer |
| 76 | 33 kV Control Panel for Double Transformer |
| 77 | 33 kV Control Panel for Single Feeder |
| 78 | 33 kV Control Panel for Double Feeder |
| 79 | Dismantling/removing of the line by contractor and Safe carriage of the material from work Site to store including loading and unloading at both ends as per RESPO norms :-ACSR conductor/AB cable, XLPE cable.from all phases on line, making bundle and stacking at a safe place, |
| 80 | 13 Mtr./11 Mtr./9 Mtr Long P.C.C/ST Poles with all accecories. |
| 81 | CT/PT Unit, 33 K.V/ 11 K.V VCB |
| 82 | Old and used Damaged TF 10/25/63/100 KVA |
| 83 | Old and used Damaged TF 250/400 KVA |
| 84 | Removing of 05/10 MVA Transformer from work site to Store Centre. |
| 85 | 33/11 KV pilfer proof metering cubical |
| 86 | Double pole/section pole 13 Mtr./11 Mtr./9 Mtr Long P.C.C/ST Poles with all accecories. |
| 87 | Tri pole 13 Mtr./11 Mtr./9 Mtr Long P.C.C/ST Poles with all accecories. |
| 88 | Four pole 13 Mtr./11 Mtr./9 Mtr Long P.C.C/ST Poles with all accecories. |
| 89 | Construction of 11 KV Underground/ Over head Line as per RESPO norms :-Digging of cable trench in size of 0.45Mtr.x1.05 Mtr. |
| 90 | Laying of 33 KV 3x70/120/185/300 sq.mm. cable in the trench. |
| 91 | Laying of 11 KV 3x70/120/185/300 sq.mm. cable in the trench. |
| 92 | Providing 150 mm. sand cushion beneath and 150 mm. above the cable. The cable shall be duly protected by 1st Class Bricks, two on either side and third on top of the cable, laid in the series one after the other. |
| 93 | Refilling and ramming of the left out soil, closing the trench and levelling. Spare cable shall be left in the loop shape at both ends, including providing of all required material and T&P. |
| 94 | Digging and laying 33/11 KV various type XLPE cable trench less. |
| 95 | Providing and fixing of Danger Board with clamp, nut and bolts. |
| 96 | Providing and fixing of Number Plate with clamp, nut and bolts. |
| 97 | Providing and wrapping of barbed wire on 11 KV PCC Poles at a height of 2.75 Mtr. from the ground level as per RESPO Norms. |
| 98 | Fitting of 11 KV Pilfer proof metering cubical including making proper connections. |
| 99 | Guarding of 11 KV Line with G.I. wire as per RESPO Norms. |
| 100 | Fixing of 33/11 KV Fuse Set as per RESPO Norms. |
| 101 | Fixing of TPMO. |
| 102 | Fixing of 33 KV line/Bus isolator. |
| 103 | Mounting and fixing of 33/11 KV CT/PT Unit on double pole including making proper connections. |
| 104 | Mounting and fixing of 10 KVA transformer on pole including making proper connections. |
| 105 | Mounting and fixing of 25/63/100 KVA transformer on double pole including making proper connections. |
| 106 | Installation of 250 KVA transformer on plinth including making proper connections. |
| 107 | Making Plinth for 250 KVA transformer. |
| 108 | Fancing of Plinth. |
| 109 | Water level earthing with all accessories. |
| 110 | Fixing of Tell less single circuit unit and making proper connections with all accessories. |
| 111 | Fixing of Tell less Double circuit unit and making proper connections with all accessories. |
| 112 | Fixing of Tell less Triple circuit unit and making proper connections with all accessories. |
| 113 | fixing of LT Fuse Set/Box with fuse wire and fixing of MS Clamp, Nuts and Bolts and making proper connections with all accessories. |
| 114 | G.I. Pipe 6” dia for inserting 11 KV XLPE cable for safety of cable on Single/Double Pole by providing and fixing of MS Clamp, Nuts and Bolts. |
| 115 | Fixing and fitting of single/three phase distribution box on pole for making consumers cable connection complete work. |
| 116 | Fixing of all type clamp for LT and HT. |
| 117 | fixing of HDPE Pipe MS Clamp, Nuts and Bolts. |
| 118 | Aluminum/Red oxide Paint for Pole and fancing. |
| 119 | For 33/11 KV/LT Line, Single support 13/11/9/8.5 Mtr. long ST/PCC Poles :- Excavation of foundation pit in size of 75x45 cm. having depth of 1/6th of the full length of the support (pole), providing and laying of stone pad (300x300x75mm.) in the bottom of the pit. Erection of single pole support complete with fixing of 11 KV V-Type cross-arms, earthing rod and all other accessories by providing stone pad, holding clamps, f-bracket and nuts & bolts etc. |
| 120 | For 33/11 KV Line, Double/section Pole structure with 13/11/9/8.5 Mtr. long ST/PCC Poles :- Excavation of foundation pit in size of 75x45 cm. having depth of 1/6th of the full length of the support (pole). Erection of support (pole) complete work by fixing of D.P. Clamps and all other accessories. The work includes fabrication work and fixing of cross bracing sets, earthing rod, cutting holes etc. |
| 121 | For 33/11 KV Line, Tri Pole structure with 13/11/9/8.5 Mtr. long ST/PCC Poles :- Excavation of foundation pit in size of 75x45 cm. having depth of 1/6th of the full length of the support (pole). Erection of support (pole) complete work by fixing of D.P. Clamps and all other accessories. The work includes fabrication work and fixing of cross bracing sets, earthing rod, cutting holes etc. |
| 122 | For 33/11 KV Line, Four Pole structure with 13/11/9/8.5 Mtr. long ST/PCC Poles :- Excavation of foundation pit in size of 75x45 cm. having depth of 1/6th of the full length of the support (pole). Erection of support (pole) complete work by fixing of D.P. Clamps and all other accessories. The work includes fabrication work and fixing of cross bracing sets, earthing rod, cutting holes etc. |
| 123 | For 11 KV Line, Double Pole structure for T/F (25,63,100, 250 kva) with 13/11/9/8.5 Mtr. long ST/PCC Poles :- Excavation of foundation pit in size of 75x45 cm. having depth of 1/6th of the full length of the support (pole). Erection of support (pole) complete work by fixing of D.P. Clamps and all other accessories. The work includes fabrication work and fixing of MS angle and channel, TPMO, Fuse set, earthing rod, cutting holes etc. |
| 124 | Grouting of Poles Single line support :- Grouting of support in CC 1:4:6 (cement, sand and 40 mm. brick ballast) Grouting will be done in the block of size 45cm x 45cm x 1/6th of full length of the support upto ground level as per RESPO Norms. |
| 125 | Grouting of stay rods (20x1800mm.) including all works of excavation, cement concrete in size of (0.60x0.60x0.30)M in the ratio of 1:4:6 (cement, sand and 40 mm. brick ballast) including back filling of soil and proper ramming etc. |
| 126 | Installation of 05/10 MVA transformer on plinth and making proper connections. |
| 127 | Making Plinth for 05/10 MVA transformer. |
| 128 | Installation of 33/1 kv CT unit, PT unit, LA, Post insulator. |
| 129 | Providing structure for line/ buss isolator, LA, Post insulator, CT/PT unit and 33 KV VCB. |
| 130 | Making of foundation for above said works in above two rows. |
| 131 | Cutting branches of trees |
| 132 | Filling of 33/11 kv cable jointing kit. |
| 133 | Matarials to be provided by contractor of 11 KV Underground/ Over head Line as per RESPO norms :-Stone Pad 300x300x75 mm |
| 134 | LT Incoming Panel with metering equipment & fixing arrangement |
| 135 | Cross Arm holding Clamps with bolts & nuts |
| 136 | Single phase Meter Box clamp |
| 137 | Three phase Meter Box clamp |
| 138 | Three phase Distribution Box clamp |
| 139 | Holding clamps for top channel TPMO & fuse set etc. with bolts & nuts |
| 140 | Earth wire clamps with bolts & nuts |
| 141 | Suspension Clamp |
| 142 | Dead-End Clamp |
| 143 | Eye-Hook |
| 144 | J-Hook |
| 145 | Copper L-Piece 50x225x10 mm |
| 146 | Copper L-Piece 62x225x12 mm |
| 147 | F-bracket for 11 kV line |
| 148 | F-bracket for 33 kV line |
| 149 | E Bracket with bolts & nuts |
| 150 | Barbed wire GI |
| 151 | LT PVC Cable 3.5x70/35 sq mm |
| 152 | LT PVC Cable 3.5x150/70 sq mm |
| 153 | 33 kV Post Insulator |
| 154 | LT Shackle insulator 100x115 mm |
| 155 | Bolts & Nuts for Shackle insulator |
| 156 | 4-core LT MCB with Box |
| 157 | Loop guard complete 3-phase |
| 158 | Danger Board with clamps |
| 159 | Number Plate with clamps |
| 160 | Aluminium Paint |
| 161 | Red oxide paint |
| 162 | Tell less single circuit unit with all accessories. |
| 163 | Tell less Double circuit unit with all accessories. |
| 164 | Tell less Triple circuit unit with all accessories. |
| 165 | LT Fuse set with all accecesories |
| 166 | HDPE PIPE |
| 167 | GI PIPE 6\" |
| 168 | ALL LUGS. Please Enable Macros to View BoQ information |