| 1 | Surface dressing of the ground including removing vegetation and in-qualities not exceeding 15 cm deep and disposal of rubbish,head upto 50 m and lift up to 1.5 m All kind of soil |
| 2 | Earth work in surface excavation not exceeding 30 ncm in depth but exceeding 1.5 m in width as well as 10 sqm on plan including getting out of disposal of excavated earth upn to 0 m and lift up to 1.5 m as directed by engineer in charge 2.1.1.All kind of soil (SOR 253) |
| 3 | Excavating supply and filling of local earth (including royalty) by macanical transport up to alead 5km also including ramming and watering of the earth in layer not exceeding 20 cm in trenches plinth sides of foundation etc. all complete. |
| 4 | Providing and laying G.S.B in foundation of floor i\c all labour,materials T&P etc all work complete |
| 5 | R.C.C. work in column/slab/wall in 1:2:4 with cement c/sand and 20 nmm gauge stone grite i/c all complete |
| 6 | M-150 brick work in 1:6 c/s mortar in sub-structure i/c labour T&P all work complete. (SOR 303) |
| 7 | 12mm thick internal plaster in 1:5 C/s mortar in wall i/c all aterial labour t&p etc all work complete SOR 584(1) |
| 8 | Providing of laying of steelbars inc. cutting binding placing and complete in all respect. (SOR 504) |
| 9 | M.S iron door and window with ms angle and ms sheet i/c all complete as direct by engineer in charge as chapter 10 s.i no 503 |
| 10 | M.S or iron in plain work such as RCC i/c banding for proper shape and i/c supply of steel &its wastege,band,hooks and aouthorised overlapping shall be measurd and i/c cost of bending wire etc………All comp. As per PWD schedule item no. 502 |
| 11 | M.S or iron in plain work of small size such as RCC i/c banding for proper shape and i/c supply of steel &its wastege,band,hooks and aouthorised overlapping shall be measurd and i/c cost of bending wire etc SOR 504 |
| 12 | Providing and fixing precoated galvanised iron sheets (size, shape and pitch of corrugation as approved by Engineer-in-Charge) 0.50 mm (+0.05%) total coated thickness with zinc coating 120 grams per sqm as per IS:277, in 240 mpa steel grade, 5-7 microns epoxy primer on both side of the sheet and polyster top coat 15-18 microns. purlins rafters and trusses and including cutting of size and shape wherever required. SOR 6.1.8(ii |
| 13 | Supply & Fixing 5 mm thick approved china white/coloured glazed tiles in flooring or dado laid with 1:3 cement and approved coarse sand mortor finished and jointed with white cement slurry and pigment & polishing complete including supply of all, materials, labour and T&P etc required for proper completion of the work. (size of tiles upto 300x300mm) SOR 628 |
| 14 | Supply & Fixing 5-10 mm thick approved china white/coloured glazed tiles in flooring or dado laid with 1:3 cement and approved coarse sand mortor finished and jointed with white cement slurry and pigment & polishing complete including supply of all, materials, labour and T&P etc required for proper completion of the work. (size of tiles upto 300x300mm) SOR chapter new item no-11.41 |
| 15 | Distempering with oil distemper of approved brand and manufacture and of required shade on undercoated wall surface to give an even shade over and including a priming coat with cement primer of approved brand and manufacture such as Berger, J&N Shalimar, Asian Paints after throughly brushing the surface free from mortor dropping and other foreign matter and also including prepairing the surface even with plaster plaster of paris or approved approved synthetic material and sand papered smooth including cost of all materials. SOR 649 |
| 16 | Painting of wood or iron work including sand eparing,rubbing and cleaning as required for proper completion of work (two coats) SOR 4(2) |
| 17 | providing and warnishing on iron work in small areas or new wood work of one coat of ready mixed priming paint & one coat of approved superior quality ready mixed paint of clear synthatic varnish including supply of all material, labour and T&P etc. requared for proper completion of the work paint to be used should confirm to the I.S.I. no. 103 |
| 18 | Providing and applying of 2cm thickness over plastered surface to prepare the surface to even and smooth complete. |
| 19 | Supply and fixing 32mm thick flush door all complete fitting etc. all work complete. SOR 470 |
| 20 | Supply and fixing aluminium flush doors all fitting etc. All work comp. M.R. |
| 21 | Supply and fixing 32mm thick flush door ply with handeles all fitting etc. all work complete. |
| 22 | Wiring point for light with 1.5 sq.mm. PVC insulated single core aluminium conductor cable in heavy gauge rigidsteel conduct pipe on surface, complete with 8 SWG GI earth continuity wire, piano type switch and ceillung rose/angle batten holder on 3 mm thick phenolic laminated backelite-sheet etc complete in all respect as |
| 23 | Wiring point for fan /fresh air fan (light duty exhaust fan) with 1.5 sq. mm. PVC insulated single core aluminium conductor cable in heavy gauge rigid steel conduit wire, piano type switch & ceilingrose on 3 mm thick phenolic laminated backelite sheet etc. complete in all as directed |
| 24 | Wiring point for plug with 1.5 sq. mm. PVC insulated single core aluminium conductor cable in heavy gauge rigidsteel conduit pipe on surface, complete with 8 SWG GI continuity wire and piano type switch and socket etc. complete in all respect |
| 25 | S/F of 18w hewelles make all fitting complete MR |
| 26 | S/F of LED 12w hewells make all fitting complete MR. |
| 27 | Septic tank of appropriate capacity for two years cleaning interval for 50 users |
| 28 | S/F of low dencity polythine seamless one piece moulded tank and placing the same in proper position including all work complete. MR |
| 29 | Providing and fixing GI/PVC pipe all fitting all work complete. SOR 18.10.02(ii) |
| 30 | Providing and fixing sanitary pipe all fitting all work complete. OR 18.10.03(iii) |
| 31 | Providing and fixing WC pan indian type with cast iron Pand S trap all complete with aotomatic flushing all work complete. As per DSR 17.10 |
| 32 | S/F of 25mm PVC pipe in position all work complete. SOR 18.10.03(iii) |
| 33 | same As Estimate must read Please Enable Macros to View BoQ information |