Name of Work: Widening of Jeepable patrolling road inside RCF Trombay Factory, Chembur, Mumbai 400 074.
Sl. No.
Item Description
1
Levelling, watering and rolling to required Density with a power roller weighing not less than 10 tonnes and preparing the ground to the required grade and camber as specified and as directed bythe Engineer.
2
To carry out earth work in embankment or filling in low lying ground with available earth, debris in layers not exceeding 25 cm.in loose thickness & compacting each layer with 10/12 tonnes power roller, watering etc. in conformity with the lines, grades & cross sections including clearing & grubbing the ground , transporting within premises , etc. complete as specified and as directed by the Engineer.
3
Supplying blue trap stones of approved quality & providing the same in rubble packing of 25 cm thick to the required level & camber, filling in voids with chips & 60 mm metal etc. including spreading over the rubble60 mm metal 75 mm thick, (Total thickness of bed 325 mm covered) compacting to the weighing not less than 10 tonnes static power roller etc. complete as specified & as directed by the Engineer .
4
Supplying & spreading of one or more layers of compacted crushed coarse agg. with alternate application of bituminous binder & key aggregate with the requirements of MORTH, Rolling with 10/12 mt roller using VG-30 grade bitumen (1% Antistripping agent) to serve as base course and inconformity with the line, level and cross sections shown on the drawings or as directed by the Egg., thickness of individual course shall not exceed 50 mm. Binder application rate (minimum) shall be 5Kg/SqM.
5
Supply of JCB including operator, cost of fuel, oil etc., complete on shift basis (Minimum payment payable is half shift. A shift consists of 8 Hrs. The actual start of work is considered as zero time. Lunch and breakdown shall be deducted from shift timings
6
Supply of dumper/s including driver,cleaner, cost of fuel, oil etc., complete on shift basis (Minimum payment payable is half shift. A shift consists of 8 Hrs. The actual start of work is considered as zero time. Lunch and breakdown shall be deducted from shift timings
We takes all possible care for accurate & authentic tender information, however Users
are requested to refer Original source of Tender Notice / Tender Document published by
Tender Issuing Agency before taking any call regarding this tender.