| 1 | Providing Compound Wall and Water Arrangement for SC Mayanam at T.Batherpettai in Thalugai Panchayat Earth work excavation for foundation in Hard stiff clay, stiff black cotton, hard red earth, shales murram, gravel,stoney earth and earth mixed with small size boulders SS.20B and Sand, silt or other loose soil, wet sand,or silt not under water, light black cotton soil, sandy loam ordinary soil and to full depth as may be directed except in hardrock requiring blasting inclusive of shoring shuttering and baling out water and cleaning and levelling the site etc.,complete a) Footing |
| 2 | Cement concrete 1:4:8 mix usin 40 mm HBGS metal inculding cpost and coveyance of all materials to site including labour for mixing ,l aying,curing etc complete., |
| 3 | Cement concrete 1:2:4 mix usin 20 mm HBGS metal inculding cpost and coveyance of all materials to site including labour for mixing ,laying,curing etc complete., |
| 4 | Supply and Fixing of Precast RCC Column Post for Compound wall purpose of size 2.00 x 0.15 x 0.15 including all cost and conveyance of materials to work site and all charges etc complete. |
| 5 | Supplying and Fixing Chain Link Fencing of 5cm x 5 cm x 10 gauge including cost and conveyance of all materials to work site and all kind labour charges and all charges for tools, machineries and equipments etc |
| 6 | Supplying and Fixing Barbed Wire Fencing 12G, 2 PLY including cost and conveyance of all materials to work site and all kind labour charges and all charges for tools, machineries and equipments etc complete. |
| 7 | White washing two coats with freshly burnt white shell lime in all floors including cost of lime, blue powder fevicol type gum, brushes, scaffolding charges, etc., complete complying with standard specification and as directed. |
| 8 | Supply and Fixing of PVC Water Tank including cost and conveyance of all materials and charges etc complete. SOR 2025-26 M-0540e. |
| 9 | Provision for Platform and Stage for PVC Water Tank etc complete., |
| 10 | Provision for Community Soak Pit etc complete., |
| 11 | Provision for MS Grill Gate including supply,fixing and painting etc complete., |
| 12 | Earth work excavation for foundation in all soils and sub soils to full depth etc., ordinary soil complete |
| 13 | Supplying and filling in foundation, basement, etc with filling M.Sand in layers of not more than 15 cm thick well watered, rammed and consolidated etc. complete complying with standard specification and as directed by the departmental officers. |
| 14 | CC 1:4:8 mix using 40mm metal including cost and conveyance of all labour charges etc complete |
| 15 | Supplying and erecting steel centering including necessary supports for plane surfaces for Reinforced Cement Concrete works |
| 16 | Supplying, fabricating and placing in position Mild Steel / Ribbed Tor Steel grills for all RCC works as per design given including cost of steel and G.I. binding wire in all floors etc. complete complying with standard specification. (Contractor has to make his own arrangements for the supply of steel and binding wire). |
| 17 | RCC 1:1.5:3 mix using 20mm metal including cost and conveyance of all labour charges etc complete |
| 18 | Brick work using country bricks of size 83/4\"x41/4\"x23/4\" in cement mortar 1:5 (One cement and five M.Sand) including curing neat finishing, etc., complete complying with standard specifictio |
| 19 | Plastering with Cement Mortar 1:5 (One cement and Five M.Sand), 12mm thick in all floors including curing etc. complete complying with standard specification and as directed by the departmental officers. |
| 20 | Painting two coats of newly plastered wall surface with ready mixed plastic emulsion paint of first class quality and of approved colour over a priming coat including thorough scrapping, clean removal of dirt, and including necessary plaster of paris putty, wherever required etc., complete complying with standard specification. |
| 21 | Provision for Name Board etc complete |
| 22 | GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column \"BB\" for all works in this package} Please Enable Macros to View BoQ information |