Name of Work:- I.P.M. To Canal Bank In Between Ch. 0.00 And Ch. 120.00 Of Dy 3 Of R.B.M.C. Under Of K.C Division No.-Ii
Sl. No.
Item Description
1
Percentage BoQ BoQ_Ver3.0 Percentage Normal INR Only INR Select, At Par, Excess (+), Less (-) IOCL Tender Inviting Authority: Executive Engineer/Kangsabati Canals Division No.-II/ Khatra,Bankura. Name of Work: \"I.P.M. to canal bank in between Ch. 0.00 and Ch. 120.00 of DY 3 of R.B.M.C. Under of K.C Division No.-II \" Contract No: e-N.I.T. No - WBIW/EE/KCD2/eNIT-06/2025-26 (Sl No-31 ) Bidder Name : PRICE SCHEDULE(This BOQ template must not be modified/replaced by the bidder and the same should be uploaded after filling the relevent columns, else the bidder is liable to be rejected for this tender. Bidders are allowed to enter the Bidder Name and Values only ) NUMBER # TEXT # TEXT # NUMBER # TEXT # NUMBER NUMBER TEXT TEXT # NUMBER # TEXT# TEXT # NUMBER # NUMBER NUMBER NUMBER NUMBER TEXT TEXT NUMBER NUMBER NUMBER NUMBER TEXT TEXT NUMBER NUMBER NUMBER NUMBER TEXT TEXT NUMBER NUMBER NUMBER NUMBER TEXT TEXT NUMBER NUMBER NUMBER NUMBER TEXT TEXT NUMBER NUMBER NUMBER # NUMBER # TEXT TEXT NUMBER # NUMBER # DATE NUMBER # NUMBER # TEXT # Sl.No. Item Code / Make Quantity Units Estimated Rate Addition / Deduction Addition / Deduction Values Currency Convertion against each Item Quoted Currency in INR / Other Currency BASIC RATE In Figures To be entered by the Bidder Rs. P Excise Duty VAT Freight Charges ( Unloading & Stacking) Any Other Taxes/Duties/Levies Other Taxes 2 IIIrd Party i.e DGS&D / RITES etc Inspection Charges @0.34%+Service Tax Less for Cenvat Credit,if any respect of Supplies Under full Excise Duty Category TOTAL AMOUNT Without Taxes TOTAL AMOUNT With Taxes TOTAL AMOUNT In Words
2
Cutting uprooting and clearing jungles including shrubs, water weeds, bushes, trees, plants, upto 30cm. Girth including removing as directed by Engineer-in-charge.
3
Earthwork in excavation in the canals / drainage channels / borrow pits /River bed / slope of bank as noted below as per designed section & throwing the spoils in layers of 25 cm. for making banks as per profile or to deposit the same in any other place within an initial lead of 30 metre and initial lift of 1.5 metre including breaking clods, rough Dressing etc. complete as per direction of the Engineer-in-charge.(a) Ordinary soil / local soil / soil mixed with moorum or kankar / silt, dry or moist / slushy silt / sticky soil.
4
Earthwork in excavation in all kinds of soil for making embankments, repairs to the embankment, closing breaches etc. as per profile including supply and transporting the earth by truck or tractor or any other mechanical means on land , including loading, transporting, unloading and stacking with all lifts bothways and head load where necessary and depositing the same on embankments, clannels, filling depressions in requisite profile, levelling as per direction of the Engineer-in-charge within a lead ofA) Beyond 500 metre and upto 1.00 kmNB :- Measurement to be taken on the basis of stack measurement / prepost work section measurement after deduction of void as per norms. No extra payment will be made for stacking Total in Figures 352313.0 352313.0 INR Three Lakh Fifty Two Thousand Three Hundred & Thirteen Only 4.0 Construction of chamber for 100mm sluice plates item5 10.0 Nos Quoted Rate in Figures Select 0.0 0.0 INR Zero Only Quoted Rate in Words INR Zero Only Please Enable Macros to View BoQ information
We takes all possible care for accurate & authentic tender information, however Users
are requested to refer Original source of Tender Notice / Tender Document published by