| 1 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan) including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. |
| 2 | a).All kinds of soil. |
| 3 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : |
| 4 | 1:3:6 (1 Cement : 3 coarse sand(zone-III) derived from natural sources : 6 graded stone aggregate 40 mm nominal size derived from natural sources). |
| 5 | Brick work with common burnt clay modular bricks of class designation 3.5 in foundation and plinth in: |
| 6 | Cement Mortar 1:6 (1 cement : 6 coarse sand). |
| 7 | Steel work welded in built up sections/ framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required. |
| 8 | a)In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works. |
| 9 | 12 mm cement plaster of mix : |
| 10 | 1:6 (1 cement: 6 fine sand) |
| 11 | Finishing walls with Acrylic Smooth exterior paint of required shade : |
| 12 | New work (Two or more coat applied @ 1.67 ltr/10 sqm over and including priming coat of exterior primer applied @ 0.90 litre/10 sqm) |
| 13 | Painting with synthetic enamel paint of approved brand and manufacture to give an even shade : |
| 14 | Two or more coats on new work |
| 15 | Supplying at site : |
| 16 | R.C.C. Standards post/ struts/rails/ pales of mix 1:1.5:3 (1 cement : 1.5 coarse sand : 3 graded stone aggregate 12.5 mm nominal size) with wooden plugs or 6mm bar nibs wherever required as per direction of Engineer-in-charge (cost of earth works in excavation, concrete works in foundation to be paid separately). |
| 17 | Fencing with R.C.C. post placed at required distance, embedded in cement concrete blocks, every 15th post, last but one end post and corner post shall be strutted on both sides and end post one side only, provided with horizontal lines and two diagonals of barbed wire weighing 9.38 kg per 100metres (minimum), between the two posts fitted and fixed with G.I. staples on wooden plugs or G.I. binding wire tied to 6 mm bar nibs fixed while casting the post (cost of R.C.C. posts, struts, earth work and concrete to be paid for separately) :- Payment to be made per metre cost of total length of barbed wire used. |
| 18 | a).With G.I. barbed wire |