|
| 1 | Clamps for T-off /Top Channel |
| 2 | X-Arm Holding Clamp |
| 3 | F-Bracket for PCC Pole |
| 4 | Holding Clamp for fuse set with N/B |
| 5 | Clamps for Top/Dropper Angle |
| 6 | G.I Strip for Earthing |
| 7 | PG Clamp |
| 8 | Nuts & Bolts |
| 9 | Clamps for Double Pole |
| 10 | Stone pad 300x300x75mm |
| 11 | Stey Clamp |
| 12 | Stay Insulator |
| 13 | Dead End Clamp |
| 14 | Suspension Clamp |
| 15 | Piercing Connector |
| 16 | Eye hook |
| 17 | Al. Lug 95 sq mm |
| 18 | Al. Lug 120 sq mm |
| 19 | Al. Lug 150 sq mm |
| 20 | Danger Board Barbed wire including Jumper |
| 21 | 25x6 mm GI Earthing Strip |
| 22 | Holding clamps for top channel TPMO & fuse set |
| 23 | Tailless Unit 500 Amp |
| 24 | Copper Bus Bar |
| 25 | Copper L-piece 62x225x12 mm (LS) |
| 26 | Al leg Long barrel size (LS) |
| 27 | Aluminium Binding Wire |
| 28 | Barbed Wire |
| 29 | Cartage of PCC Pole from ESC to Work side & All Other Associated Material |
| 30 | Cartage of L.T PVC Cable & All other Associated Material (Top Chhannel, T-off Channel, V-Type X Arm, Dropper Angle, Pin Insulator, Disc Insulator Etc.) |
| 31 | Cartage of 25,63 & 100 KVA Different T/F |
| 32 | Cartage and Loading Unloading of 250 KVA T/F |
| 33 | Cartage of ACSR Weasel Conductor & ACSR Rabbit Conductor |
| 34 | Cartage of AB Cable with Size of (3x50+1x35+1x16), (3x95+1x70+1x16) & (3x120+1x95+1x16) sq mm |
| 35 | Cartage of Distribution Box |
| 36 | Cartage of Dropper Angle & Pin Insulator 11 KV for DO Fuse Set |
| 37 | Cartage of X-Arm & Pin Insulator |
| 38 | Cartage of 11kv/LT Fuse Set & 11 kv TPMO Insulator |
| 39 | Errection of PCC Pole For New/Existing Line |
| 40 | Concreting/Grouting of PCC Pole as per standard |
| 41 | Earthing of Pole as per standared |
| 42 | Construction of T-Off with all Associated Material |
| 43 | Installation of X-Arm & Pin Insulator on alreadey errected pole |
| 44 | Installation of 11kv/LT Fuse Set/11 kv TPMO Insulator |
| 45 | Installtion of Dropper Angle for Fuse Set with Pin Insulator 11 KV |
| 46 | Sagging of Weasel Conductor & & ACSR Rabbit Conductor on already errected Pole with All Electrical Accesseries |
| 47 | Construction of D/P 25 KVA T/F with All Associated Material |
| 48 | Mounted of 25 KVA T/F on errected D/P with All other Associated Material |
| 49 | Connecting of LT PVC Cable with Alluminium Lug & Copper Z Clamp |
| 50 | Stringing of AB Cable with Size of (3x50+1x35+1x16), (3x95+1x70+1x16) & (3x120+1x95+1x16) sq mm |
| 51 | Mounted of Distribution Box at Errected Pole |
| 52 | Concreting of Stay with all Associated Material |
| 53 | Construction of Plinth For 250 KVA T/F Plinth (2x2x1.5 M) with All Associated Material |
| 54 | Mounted of 250 T/F on Constructed Plinth with All Associated Material |
| 55 | Fencing of 250 KVA with All Associated material |
| 56 | Chemical Earthing with GI Strip, Chemical with material for T/F |
| 57 | Dismental and Receive Back 10, 25 & 63 KVA T/F due to capacity enhancement from site to Store Center JNP |
| 58 | Dismental and Receive Back 100 KVA T/F due to capacity enhancement from site to Store Center JNP Please Enable Macros to View BoQ information |