| 1 | Clamps for T-off /Top Channel |
| 2 | F-Bracket for PCC Pole |
| 3 | Clamps for Dropper Angle |
| 4 | Nut & Bolt |
| 5 | Clamps for Double Pole |
| 6 | Stone pad 300x300x75mm |
| 7 | Stey Clamp |
| 8 | Dead End Clamp |
| 9 | Suspension Clamp |
| 10 | Piercing Connector |
| 11 | Eye hook |
| 12 | Al. Lug 120 sq mm |
| 13 | Al. Lug 150 sq mm |
| 14 | Danger Board Barbed wire including Jumper |
| 15 | LT Clamp |
| 16 | LT Insulator |
| 17 | 11 KV Fuse Set |
| 18 | Clamps for LT T-off with bolts & Nuts |
| 19 | Holdin Clamps for top channel TPMO & fuse set |
| 20 | LT incoming pannel with metering equipment/ Tellness Unit Cubical Box |
| 21 | Copper L-piece 50x225x10 mm (LS) |
| 22 | Copper L-piece 62x225x12 mm (LS) |
| 23 | Al leg Long barrel size (LS) |
| 24 | Tell Ness Unit for 250 KVA (LS) |
| 25 | Cartage of PCC Pole from ESC to Work side & All Other Associated Material |
| 26 | Cartage of L.T PVC Cable & All other Associated Material (Top Chhannel, T-off Channel, V-Type X Arm, Dropper Angle, Pin Insulator, Disc Insulator Etc.) |
| 27 | Cartage of 25 and 63 KVA Different T/F |
| 28 | Cartage and Loading Unloading of 250 KVA T/F |
| 29 | Cartage of ACSR Weasel Conductor |
| 30 | Cartage of AB Cable (3x50+1x35+1x16) sq mm |
| 31 | Cartage of Distribution Box |
| 32 | Cartage of Dropper Angle & Pin Insulator 11 KV for DO Fuse Set |
| 33 | Cartage of 11 KV TPMO Insulator |
| 34 | Errection of PCC Pole For New/Existing Line |
| 35 | Concreting/Grouting of PCC Pole as per standard |
| 36 | Earthing of Pole as per standared |
| 37 | Construction of T-Off/Top Channel with all Associated Material |
| 38 | Sagging of Weasel Conductor on already errected Pole with All Electrical Accesseries |
| 39 | Construction of D/P 25 KVA T/F with All Associated Material |
| 40 | Mounted of 25 KVA T/F on errected D/P with All other Associated Material |
| 41 | Connecting of LT PVC Cable with Alluminium Lug & Copper Z Clamp |
| 42 | Stringing of AB Cable of Different Size |
| 43 | Mounted of Distribution Box at Errected Pole |
| 44 | Installation of 11 KV TPMO Insulator |
| 45 | Concreting of Stay with all Associated Material |
| 46 | Construction of Plinth For 250 KVA T/F with All Associated Material |
| 47 | Mounted of 250 T/F on Constructed Plinth with All Associated Material |
| 48 | Installation of Tellness Unit at 250 KVA T/F & Fencing of 250 KVA for Tellness Unit with All Associated material (Double Door with Proper Locking arrangment, Including grouting & Painting of Jali with All required Material) |
| 49 | Dismental and Receive Back 10, 25 KVA T/F due to capacity enhancement from site to Store Center JNP |
| 50 | Dismental and Receive Back 100 KVA T/F due to capacity enhancement from site to Store Center JNP |
| 51 | Installtion of Dropper Angle for Fuse Set with Pin Insulator 11 KV Please Enable Macros to View BoQ information |