| 1 | Fine grassing including uprooting rank vegetation and weeds by digging the area to a depth of 30 cm, removing all weeds and other growth with roots by forking repeatedly, breaking clods, rough dressing, flooding with water, uprooting fresh growth after 10 to 15 days, mixing fertilizer and then fine dressing for planting new grass, including disposal of all rubbish with all leads and lifts, watering, weeding and maintenance for 30 days or till thick lawn is formed. (b) Planting Selection no. 1 grass roots in rows 10 cm apart in both directions. |
| 2 | Supplying at site of work good quality top soil, free from debris and weeds, from approved site of work with 5 km lead. |
| 3 | Removal of weeds from lawn grass (b) Weeding out of lawn, where weeds are up to 25%, by removal of all weeds and other wild growth with roots by forking including disposal of garden rubbish with all loads and lifts complete |
| 4 | Edging of paths/ beds with bricks/tiles laid dry, including required excavation, refilling, consolidating with hand and spreading surplus (c) Vertical bricks, half brick projecting above ground. |
| 5 | Planting specimen plants in prepared pits and watering. |
| 6 | 10mm thick Cement Plaster 1:4 |
| 7 | Painting two or more coats excluding priming coat with synthetic enamel paint in all shades on wood work, metallic or plastered, concrete surface to give an even shade. |
| 8 | Compaction of Earth work (c) Compaction of earth work & Preparation of sub grade including loosening, leveling of earth 225mm thick top layer, rough dressing of soil, final dressing of earth to give level, camber, watering, rolling with road roller, compacting the bed to achieve minimum dry density as given in the Table 300-2 as per Technical clause 305 of MORT&H specifications. (In case of link roads earth work to be done by villagers). |
| 9 | Centering and shuttering for sides and soffits of beam, beams, launching girders, bressumers, lintels. |
| 10 | Laying of Dry Brick Ballast 40 mm gauge for flooring. |
| 11 | Cement concrete 1:5:10 With stone aggregate 40mm gauge mixing by mechanical means using concrete mixer volumetric type |