| 1 | Supply/ Fixing, testing and commissioning of 6 mtr All in one Solar Integrated pole system with aesthetically designed road lighting optic luminaire of IP 66 & Integrated Pole 6 Mtr. Solar pole Light with health monitoring system with bluetoothApp, with 5 year warranty against any manufacturing defects Complete in all respect. System lumen > 6000Lm with efficacy of >140 lm/watt. System wattage shall not be more than 45 W. Life expectancy >50000 Hr, color temperature 3000k/4000K, standard light profile 6 H 100% + 6 H 50%, CRI >70, average lighting beam angle 120 degree, housing pressure die cast aluminum with corrosion resistance polyester powder coated, Impact resistance > IK 07, lamp starting time should be not more than 10 seconds. thermal management system should be provided, and LED must be mounted on heat conductive aluminum sink with suitable large are surface be means of fins to dissipate the heat to ambient air. Over voltage Protection. Luminaire should confirm to applicable IEC 61000-3-2, IEC 61547, IEC 61000-3-2, IEC61547, 2 Battery capacity minimum 100 Ah, LiFePO4 , life cycle minimum 2000 @ 90% DOD with IP 68, dimension maximum 120x146x470mm , 13.2 kg, Battery should comply with IS 16406:2015/IEC 62133:2012, BIS certification etc. 3 PV module- Mono-Si minimum 400Wp / 23Voc Dimension not more then 172x172x4000 mm, solar cell efficiency minimum 16.4 %, 8 site string, totalnominal peak power output minimum 400wp, each shall be min 50Wp. Shall comply IEC61215. 4 Total column length 6 mtr, with 2mtr bottom Galvanised MSand AL alloy housing powder coated part minimum 4 mtr., solar PV module 4 mtr.,5 Test Reportcharge or above. 1. Standard fixture should confirm to applicable IEC 60598-1, IEC 61000-3-2, IEC 61547, LM 79 & LM 80, BIS 2. Test report for LED LM 80 (IS-16105), Internal wiring, fiber glass, insulted multistrand wire. 3. Over voltage Protection Declaration of Conformity safety compliance report for charge controller and should be certified as per IEC 60598-1, IEC 61000-3-2, IEC 61547. 4. Test report for vertical pole tested for shock & vibration, wind force to meet safety parameters 5. Battery test report from 3rd party, along with other test reports. 6. IEC certificate for IEC 60598-2-3and only IEC certificates from reputed laboratory/testing centre NABL approved. Complete system shall e complete in all respect along with foundation, carrying forwarding, storage and System approved by Engineer-In-charge or above. |