|
| 1 | Earthwork excavation by mechanical means (Hydraulic excavator) or manual means for foundation, substructures, plinth beam, cess pits & trenches, all kinds of foundation etc., in all types of soil like hard gravelly soil, sandy soil for the following depth from average ground level upto the required founding level, lines and grades in both dry and wet conditions including shoring, strutting, bailing out of water if necessary, levelling and ramming the bottom of trenches, dressing of sides, stacking the excavated material away from the edge of trenches, refilling the sides of foundation as required with selected excavated earth and depositing/ disposing the surplus excavated earth(Disposal soil to be levelled by breaking clods, if any and neatly dressed and levelled) within lead specified below all complete as per specification and as directed by the EIC. All kinds of soil with depth upto 1.5m below average ground level and disposing surplus excavated earth upto a lead of 50metres. |
| 2 | Collection, Supplying and stacking of decomposed dry farmyard manure without undesirable materials, stacking the same to at places as shown by Engineer for taking pre measurements including spreading the same at places shown with a lead upto 100metres and filling in pit etc., Complete all as per specification and as directed by the Engineer-in-Charge. |
| 3 | Collection, Supplying and stacking good quality Red earth without stones, gravel etc., and stacking for premeasurement at places as shown by Engineer for taking pre measurements including spreading the same at places shown with a lead upto 100 metres and filling in pits etc., Complete all as per specification and as directed by the Engineer-in-Charge. |
| 4 | Spreading of manure / Red earth in required thickness with a lead upto 100 meters including spreading , digging loosening, mixing the manure & red earth uniformly, removing the weeds grass stones, other unwanted materials completely two times before laying grass including levelling the same at places shown and filling in pits etc., Complete all as pe specification and as directed by the Engineer-in-charge (collection and supply of manure and red earth will be paid separately) |
| 5 | Providing, stacking and planting following plants / saplings kalmegh, Hadjod, Nirgundi,Marwa dona with sapling height of 30 cm of good quality well developed and healthy appearance in poly bag of size 20cm, including transporting, planting with intial watering all as per standard practice and as directed by the Engineer. |
| 6 | Providing, stacking and planting following plants / saplings Sarpgandha,steviea,Neer brahmi,Allomanda, duranta gold, Nerium, Coofiya, londana, Ruiliya, Alternandra, verbeena, Eurva, Anchalonium, Ziplanths, Accalipha, Ficus banda, Tecoma orange, Tme,ixora,Hemilia, Hibicus of hybrid varietieswith sapling height of 30 cm of good quality well developed and healthy appearance in poly bag of size 20cm, including transporting, planting with intial watering all as per standard practice and as directed by the Engineer. |
| 7 | Maintenance of lawns, Flower beds, hedges, trees etc., in garden area by watering at regular intervals, cutting and trimming hedges, unwanted growth of grasses as required including running lawn mover, removing weeds, collecting the cut grass, fallen leaves of trees and disposing the samr at dumping yards shown by the department, watering the trees inside the garden area xcomplete all as per specification and as directed by the engineer - in- charg. Note: 1 the rate shall include thecost of hire charges of lorry and labour for transporting of cut grass, leaves etc., to the dumping yard. 2. the rate shall include the cost of all tools, plamnts water delivery hose required for gardening. |