| 1 | Notes:-(i) The entire scope of work is to be carried out from ground level to nearly upto 25 metres of height and scattered surfaces where necessary and not in one particular location.(ii) Quoted rates are deemed to be inclusive for boom lift/crane as required. Contractors should arrange boomlift/crane and takes all safety precautions for workers including accidental coverage insurance for workmen employed at the time of carrying out works as described in Sch \"A\"/ BOQ.(iii) Contractor should visit the site before quoting the tender to assess the resources required to execute the work as the site include prestigeous buildings of INA.(iv) Cost of all factors are deemed to be included in the rate quoted in BOQ. No extra claim will be entertained.(v) The area where boomlift are not approachable near the building due to the terrain/design criteria, scaffolding may be set up to carry out the work. |
| 2 | Taking down existing water proofing treatment of any description over concrete padding of any thickness etc from roof including finishes or junction or parapet and cleaning the surface (by mechanical means like grinder, etc) and removal rubbish off the premises complete all as specified and as directed. |
| 3 | Demolition of cement concrete in roofs, floors (other than ground floors), beams, staircases, landing, chajjas and similar suspended work. |
| 4 | Dismantling stone slab and tiles of any description or thickness in floors, landings aprons, parapets etc.. laid bedded and pointed in any mortar including bedding concrete. |
| 5 | Cutting out cracks to V-section in existing roofs or terracing, cleaning out, wetting, grouting with cement and slurry 1:3 using water proofing compound. |
| 6 | Material and Labour for cement concrete 1:2:4, type B1 (20 mm graded stoneaggregate) as in roof kerb, rounded or chamfered on edges complete all as specified and as directed. |
| 7 | Material & Labour for 70 mm thick plain cement concrete 1:2:4, type B1 (20 mm graded stoneaggregate) as in filling and mass concrete, roof slab padding preparatory to roof treatmentcomplete all as specified and as directed. |
| 8 | Material & Labour for 10mm thick rendering in CM 1:3 on roof with water proofing compound surfaces finished even and smooth without using extra cement complete all as specified and as directed.Note:- Water proofing compound shall be measured and paid separately. |
| 9 | Supply only Liquid Water proofing compound of approved quality complete all as specified and as directed. |
| 10 | Material andLabour for providing roof treatment with 4 mm thick APP modified water proofing membrane weighing not less than 4.0 Kg/Sqm reinforced with non woven polyester matt weighing not less than 160 gm/Sqm having softening point not less than 140 degree centigrade, longitudinal tensile strength not less than 800 N/5 cm, tearing strength of 180N by torch-on application with minimum 10 cm side over lap & 15 cm end laps applied over and including bitumen primer @ 0.20 Kg/Sqm. A coat of blown grade hot bitumen 90/15 shall be applied over the membrane @ 1.2 Kg/Sqm. The rate quoted by the contractor shall also include taking down and refixing PVC water tanks wherever required, providing additional spout pipes, cutting and mitring the membrane at rainwater pipes, cutting and inserting of membrane into walls/ parapet wall etc as per the site requirement. |
| 11 | Material & Labour for 20 to 25mm thick flame finished sadarhally machine cut stoneof approved colour and shade as in floors, skirting/dado or on parapet etc complete all as specified and as directed. |
| 12 | All as per item No. 11 here in before but except sadarahalli stone complete all as specified and as directed. |
| 13 | Supply only Hilti make stainless steel anchor fastner- 10 x 80mm,stainless steel clamp 5 x 50 mm and headless bolt 10x150 mm for fixing of sadarahalli stone cladding complete all as specified and as directed. |
| 14 | Material & Labour for sealing all the joints in sadarahalli stone with PU sealent of Make : Forsroc, McCoy Soudal or equivalent including cleaning of existing surfaces atany height(nearly 30 Metres) byBOOM LIFT or CRANE all as specified and as directed by Engr-in-Charge. |
| 15 | Dismantling single layer of mangalore pattern tiles in roofing complete all as specified and as directed. |
| 16 | Material & Labour for roof tiles Mangalore pattern interlocking at side joints, laid dry complete all as specified and as directed. |
| 17 | All as per item No.16 here-in-before but except tiles complete all as specified and as directed. |
| 18 | Material & Labour for ridge or hip tiles to suit Mangalore pattern or roofing tiles bedded and jointed in cement mortar 1:6 complete all as specified and as directed. |
| 19 | Material & Labour for preparation of new MP roof tile surfaces by cleaning the tiles and applying two coats of antifungal paint using UNIGLOSS deluxe multi surface paint over a coat of primer complete all as specified and as directed. |
| 20 | Material & Labour for preparation of old MP roof tile surfaces by cleaning the tiles and applying one coats of antifungal paint using UNIGLOSS deluxe multi surface paint complete all as specified and as directed. |
| 21 | Material & Labour for application of two coats of Tank Mastic bituminous Anti-corrosive Multi-purpose coating Make STP Ltd or equivalent on corrosive portion of MS sheet valley gutter as per manufacturer instruction complete all as specified and directed.Application Methodology(a) Surface Preparation - The surface shall be cleaned thoroughly of all contaminants like dust, traces of curing compound, oil and grease. All surface imperfections and protrusions shall be removed and repaired. (b) Material Preparation - Stir TankMastic thoroughly before use to make it homogeneous.After stirring, wait for the product to settle in order to let entrapped air escape.(c) Application of Material - Apply TankMastic as supplied on the prepared surface by brush / roller / spray as per manufactures instructions min spreading rate of 9 sqm per ltr (Depends on surface condition). Repeated coats can be given only after the earlier coat dries completely minimum 12 to 16 hrs after 1st coat. |
| 22 | Cleaning and removal of blockages from rain water drain CI pipes of size 150mm dia concealed in column of building height not less than 30m all as specified and directed.Note : Rates are included for Scaffolding required. Contractors should arrange necessary scaffolding and takes all safety precautions for workers at the time of carrying out works asdescribed. |
| 23 | Supply & Fix in repair stainless steel roof drain grating for efficient rain water drainage size 200mmx200mm square design fixed on rain water pipe at roof complete all as specified and as directed. |
| 24 | Disconnecting existing tanks setting aside (or lowering if required) overhead PVC water tank of capacity 500 ltr including re-fixing in position after completion of roof treatment including all fittings (CPVC connection, tank nipple etc)complete all as specified and as directed. |
| 25 | All as per item No. 24 here in before but 1000 ltrs capacity |
| 26 | Supply & Fix in repair rotational moulded polyethylene water storage tanks 3 layer white colour with threaded cover (cylinderical vertical with closed top) hoisted and fied in position with suitable tank cover all as speciifed in SSR Part I of capacity 1000 ltrs. |
| 27 | Supply & Fix tank adaptor 32 mm dia fixed to 1000 lt water tank complete all as specified and as directed. |
| 28 | Supply & Fix 32 mm Gun-metal, globe or gate valves, with iron wheel head, screwed both ends for iron pipe and fixed complete all as specified and as directed. |
| 29 | Supply & Fix 32 mm Ball brass valves, high pressure, with polythene float and flynut complete, screwed for iron pipe or brass ferrule and fixed complete all as specified and as directed. |
| 30 | Taking up or down steel tubing and connections, 20mm dia complete all as specified and as directed. |
| 31 | Taking up or down steel tubing and connections, 25/32mm dia complete all as specified and as directed. |
| 32 | Supplying and laying of 20 mm dia CPVC pipes SDR 11 & Plain CPVC SDR 11 fittings on walls/ceiling or laying in floors complete all as specified and as directed. |
| 33 | Supplying and laying of25 mm dia CPVC pipes SDR 11 & Plain CPVC SDR 11 fittings on walls/ceiling or laying in floors complete all as specified and as directed. |
| 34 | Supplying and laying of 32 mm dia CPVC pipes SDR 11 & Plain CPVC SDR 11 fittings on walls/ceiling or laying in floors complete all as specified and as directed. |
| 35 | Taking down of cement plaster of any description or thickness/chipping of cement concrete in any situation from brick or concrete surface including raking out of joints, hacking for key scrubbing down with water to received new plaster complete all as specified and as directed. |
| 36 | Material & Labour for rendering 20 mm thick in two layers 10mm each on rough, uneven or uncut rubble masonry or concrete surfaces in CM 1:4 finished even & smooth without using extra cement mixed with liquid water proofing compound on top layer complete all as specified and as directed.Note - Liquid water proofing compound measured & paid separately. |
| 37 | Material & Labourfor preparation of new plastered surfaces and applying two coat of acrylic emulsion exterior gradepaint on wall over a coat of wall primerand putty including necessary scaffoldingsall as specified and as per manufacturers instructions and as directed. |
| 38 | Material & Labour for applying two or more coats of 100% Premium acrylic emulsion paint having VOC less than 50 gm/litre and UV resistance as per IS 15489:2004, Alkali & fungal resistance, dirt resistance exterior paint of required shade (Company Depot Tinted) with silicon additives @ 1.43 litre/ 10 sqm over and including priming coat of exterior primer applied @ 0.90 litre/ 10 sqm over old surfaces complete all as specified and as directed. |