| 1 | PART A 11 KV LINE under gorundS/O Al. (3x185) sqmm XLPE 11 KV |
| 2 | S/O Cable Jointing kit straight through 11 KV 3Cx185 sqmm |
| 3 | S/O Cable Jointing kit outdoor through 11 KV 3Cx185 sqmm |
| 4 | Supply of HDPE pipe 120 mm |
| 5 | Supplyof GI Pipe 6 inch dia |
| 6 | DP Structure with STP Annexure DP of 11 KV |
| 7 | Cable Hoisting with MS pipe, 4\" dia |
| 8 | 11 KV High Pressure Testing |
| 9 | Labour Charges @ 30% of Part A SI.No. 1 to 7 Dismentling of old line / material and Deposit to Store including cartage Erection with T&P Laying, Testing & Commissioning etc. Rs 534126.00 |
| 10 | PART B 11 KV LINE OVERHEADS/O ST Pole 11 Mtr |
| 11 | S/O 11 Kv Pin Insulator |
| 12 | S/O 11 kv G.I Pin with nut |
| 13 | S/O Disc Insulator Polymeric 70 KN |
| 14 | S/O Disc Fitting |
| 15 | S/O Top Channel 100x50x6mm (2240mm) |
| 16 | S/O Dropper Channel 100x50x6mm (2000mm) |
| 17 | S/O Concreating of Stay |
| 18 | S/O ACSR Weasel Conductor |
| 19 | S/O Earthing Comlete |
| 20 | S/O Stay Set Complete 16x1800mm |
| 21 | S/O G.I Wire |
| 22 | S/O M.S. T-Off Channel |
| 23 | S/O Danger Board with Clamp Nut and Bolt |
| 24 | S/O Barbed wire G.I |
| 25 | S/O Number Plate with Fitting |
| 26 | S/O Aluminium Paint |
| 27 | S/O Red Oxide Paint |
| 28 | S/O Concreating of Pole |
| 29 | M.S Nut & Bolt Washer etc. (All Size) |
| 30 | S/O Muffing of Poles |
| 31 | Labour Charges @ 30% of Part B SI.No. 9 to 29 Dismentling of old line / material and Deposit to Store including cartage Erection with T&P Laying, Testing & Commissioning etc. |
| 32 | PART C 33 KV LINE under groundS/O Al. (3x300) sqmm XLPE 33 KV |
| 33 | S/O 33 KV 3x300 sq mm XLPE Cable Jointing Kit Straight through |
| 34 | S/O 33 KV 3x300 sq mm XLPE Cable Jointing Kit Outdoor |
| 35 | S/O GI Pipe 6\" Dia |
| 36 | S/O DP Structure with STP Annexure DP of 33 KV |
| 37 | S/O 33 KV Polymer Pin Insulator |
| 38 | S/O ACSR Dog Cunductor |
| 39 | S/O 33 KV Polymer Disc Insulator |
| 40 | S/O 35 KV Dist Fitting 70KN |
| 41 | S/O M S Angle Iron 65x65x6mm Bracing with clamp |
| 42 | 33 KV high Pressure Testing |
| 43 | Labour Charges @ 30% of Part C SI.No. 30 to 39 Dismentling of old line / material and Deposit to Store including cartage Erection with T&P Laying, Testing & Commissioning etc. |
| 44 | GST @ 18% Extra Please Enable Macros to View BoQ information |