| 1 | Cleaning of site etc all complete. |
| 2 | E/W in excavation in foundation with hard mixed soil etc all complete.S.I. No 251 |
| 3 | Concrete with 40 mm gauge brick ballast ,fine sand and cement in 10 :5:1 etc.S.I.No 274 |
| 4 | R.C.C Coloum work in 1:11/2:3 with cement and coarse sand and stone ballast etc all complete.S.I. No 289 |
| 5 | Ist class Brick work in 1:4 with cement and Coarse sand etc all complete.S.I.No 305 (b) |
| 6 | R.C.C beam work in 1:11/2:3 with cement and coarse sand and stone ballast etc all complete.S.I. No 289 |
| 7 | Mild steel or iron in plain work such as reinforced concreted or reinforced brick work (when not included in overall rates) wrought to required shapes as necessary including bending of the work and including supply of steel its wastage. Bend hooks and authorized overlapping shall be measured. S.I. No 504 |
| 8 | Ist class Brick work in super Structure 1:4 with cement and Coarse sand etc all complete.S.I. No 305 (b)+309(4980+240) =5220.00 |
| 9 | S/F of M.S. Iron gate including all complete.S.I. No 503 |
| 10 | 12 mm thick plaster work in 1:3 with cement and fine sand etc all complete.S.I. No 583 |
| 11 | providing and applying white cementbased putty of average 1 mm of approved brand and manufacture surface smooth including all complete work. DSR rate code no 13.80 |
| 12 | Finishing wall with water proof cement paint including getc all complete.S.I. No (660+661) |
| 13 | Painting or Varnishing two coat over one coat primer including etc all complete.S.I. No (641+642) |
| 14 | E/W in filling including cutting cartage up to 8.00 Km. distance etc all complete.(Rate Analysis) |
| 15 | Brick soling laid-on -flat dry and joints filled with local earth etc all complete.S.I No 762. (A) |
| 16 | Collection and Consolidation of O.B.B 40 mm Size Brick Ballast with 20 % local sand including all complete.(Rate Analysis) |
| 17 | Interlocking Tiles- Rubber mouled reflective Zig-Zag 80 mm Providing and Laying of Interlocking Concrete Block Paverments having thickness 80mm as per drawing and technical specification clause 15041500 Mord spec. |
| 18 | Add For Coloured Interlocking including all complete. |
| 19 | S/F of Cemented Bench for Sitting including etc all complete.. |
| 20 | Cartage of materials by head load up to 5.00 (chainage) lead.S.I. No 231 (A) |
| 21 | Cartage of Bricks by head load up to 5.00 (chainage) lead.S.I. No 231 (B) |
| 22 | S/F of granite stone silapat with lettering etc all complete. |
| 23 | Add 18% GST Please Enable Macros to View BoQ information |