| 1 | Earth work excavaton in foundation in hard soil or gravelly soil within 50 m initial lead and 1.50 mt initial lift including rough dressing and bracking clods to maximum 5 cm to 7 cm and laying in layers to exceeding 0.3 mt in depth and as per direction of the department. |
| 2 | Providing, spreading, filling in foundation and plinth with sand watered and rammed as per OPWD.specification including all cost of materials, labour, conveyance, royalty,Tools and Plants etc.all complete, required for the work to finished items of work |
| 3 | Cement concrete (1:4:8) with 40 mm size hand broken hard granite metal including all cost of materials, labour, conveyance, royalty, Tools and Plants water for curing etc.all complete,as per OPWD specification required for the work to finished items of work. |
| 4 | Fly ash bricks 23cm x 11cm x 8cm size having crushing strength not less than 75 Kg/cm2 in cement mortar (1:6) in foundation and plinth including all cost of materials, labour, conveyance, royalty, Tools and Plants, water for curing etc. all complete,as per OPWD specification required for the work to finished items of work. |
| 5 | Fly ash bricks 23cm x 11cm x 8cm size having crushing strength not less than 75 Kg/cm2 in cement mortar (1:6) in Super structure including all cost of materials, labour, conveyance, royalty, Tools and Plants, water for curing etc. all complete,as per OPWD specification required for the work to finished items of work. |
| 6 | Fly ash bricks 23cm x 11cm x 8cm size having crushing strength not less than 75 Kg/cm2 in cement mortar (1:6) in Super structure including all cost of materials, labour, conveyance, royalty, Tools and Plants, water for curing etc. all complete,as per OPWD specification required for the work to finished items of work. (1st Floor) |
| 7 | Fly ash bricks 23cm x 11cm x 8cm size having crushing strength not less than 75 Kg/cm2 in cement mortar (1:6) in Super structure including all cost of materials, labour, conveyance, royalty, Tools and Plants, water for curing etc. all complete,as per OPWD specification required for the work to finished items of work. (Head Room) |
| 8 | Cement concrete work of M20 grade with 20 mm and down grade crusher broken hard granite chips including hosting and laying all cost of materials, labour, conveyance, royalty, T & P, water for curing etc.all complete as per OPWD specification required for the work to finished items of work |
| 9 | Cement concrete work of M20 grade with 20 mm and down grade crusher broken hard granite chips including hosting and laying all cost of materials, labour, conveyance, royalty, T & P, water for curing etc.all complete as per OPWD specification required for the work to finished items of work. (1st Floor column up to Lintel Beam) |
| 10 | Cement concrete work of M20 grade with 20 mm and down grade crusher broken hard granite chips including hosting and laying all cost of materials, labour, conveyance, royalty, T & P, water for curing etc.all complete as per OPWD specification required for the work to finished items of work. (Head Room) |
| 11 | Requirement of HYSD / MS rod & labour for cutting, bending, binding, straighting and laying the grills and placing in position including cost of rod & binding weir 18 to 20 gauge |
| 12 | Requirement of HYSD / MS rod & labour for cutting, bending, binding, straighting and laying the grills and placing in position including cost of rod & binding weir 18 to 20 gauge. (1st Floor) |
| 13 | Requirement of HYSD / MS rod & labour for cutting, bending, binding, straighting and laying the grills and placing in position including cost of rod & binding weir 18 to 20 gauge. (2nd Floor) |
| 14 | Rigid and smooth centering and shuttering for rCC works including false work and dismentalling then after casting including cost of materials complete in ground floor, RCC foundation, plinth band and footings bases of columns mass concrete pre-cast slabs etc |
| 15 | RCC beams, column, grider and bressmer, etc |
| 16 | RCC Lintel (1st Fllor & 2nd Floor) |
| 17 | RCC beams, column, grider and bressmer, etc. (1st Floor) |
| 18 | RCC floor and roof slabs, landings,balconies, projecting sun shades and chajjas. (1st Floor) |
| 19 | RCC beams, column, grider and bressmer, etc. (Head Room) |
| 20 | RCC floor and roof slabs, landings,balconies, projecting sun shades and chajjas. (Head Room) |
| 21 | 12 mm thick cement plaster (1:4) over brick work with cement punning for skirting |
| 22 | 12 mm thick cement plaster in cement morter(1:6) including all cost conveyance, rayalty etc all complete |
| 23 | 12 mm thick cement plaster in cement morter(1:6) including all cost conveyance, rayalty etc all complete. (1st Floor) |
| 24 | 12 mm thick cement plaster in cement morter(1:6) including all cost conveyance, rayalty etc all complete. (Head Room) |
| 25 | 6 mm thick cement plaster in cement morter(1:4) including all cost, conveyance, rayalty etc all complete |
| 26 | 6 mm thick cement plaster in cement morter(1:4) including all cost, conveyance, rayalty etc all complete. (Head Room Ceiling) |
| 27 | 16 mm thick cement plaster in cement morter(1:6) including all cost, conveyance, rayalty etc all complete. |
| 28 | 16 mm thick cement plaster in cement morter(1:6) including all cost, conveyance, rayalty etc all complete. (1st Floor) |
| 29 | 16 mm thick cement plaster in cement morter(1:6) including all cost, conveyance, rayalty etc all complete. (Head Room) |
| 30 | 2.5 cm thick grading concrete gradient (1:2:2) on roof slab with 6 mm size hard broken granite chips on new works including all cost, conveyance royalty etc. all complete. (1st Floor) |
| 31 | 2.5 cm thick grading concrete gradient (1:2:2) on roof slab with 6 mm size hard broken granite chips on new works including all cost, conveyance royalty etc. all complete. (Head Room) Please Enable Macros to View BoQ information |