| 1 | Dismantling of roads for laying of pipe line including sorting out and stacking of serviceable materials, stacking and disposal of unserviceable materials upto a distance of 50 m. |
| 2 | Cement Concrete road |
| 3 | 133.60mm (160mm O.D.) HDPE pipes |
| 4 | Interlocking CC Tiles |
| 5 | 91.80mm (110mm O.D.) HDPE pipes |
| 6 | Excavation of earth for pipe line trenches in ordinary soil(loam, clay, or sand) including lift upto 1.5m and lead upto 50m and refilling, watering, ramming of excavated earth into the trenches & disposal of surplus earth upto 50m from the center of the trenches |
| 7 | Supply of the following HDPE Pipes as per B.I.S. code no. 4984/2016 or its latest amendment including cost of 1 P.V.C. coupler per pipe length and inclusive of all taxes and duties, 3rd party inspection charges, packing and forwarding charges, trasnit insurance charges, road transportation charges etc. F.O.R. destination etc. complete. |
| 8 | 110 mm dia HDPE pipe PN 6: class PE 100 |
| 9 | 160 mm dia HDPE Pipe PN-6: Class PE-100 |
| 10 | Supply of HDPE specials for HDPE Pipes jointing purpose. |
| 11 | Carting of following pipes, specials and fittings from site store to site of work, lowering them into trenches, laying true to alignment and gradient, laying and jointing of pipe line including cutting of pipe for making up lengths as required for proper completion of work |
| 12 | 110 mm dia HDPE pipe PN 6: class PE 100 |
| 13 | 160 mm dia HDPE Pipe PN-6: Class PE-100 |
| 14 | Supply and fixing of following fittings including cartage of materials, labour, T&P etc. complete Sluice/wheel valve |
| 15 | 150mm dia |
| 16 | 100mm dia |
| 17 | Supply of all labour, materials, T&P etc. all complete and construction of following valve chambers as per |
| 18 | Provision of new water house hold Connection in Excavation in foundation in ordinary soil (loam,clay or sand ) with 7mtr 20mm dia HDPE pipe line, 20 mm dia G.I.elbow,Clamp with saddle,Tap/stop cock 20 mm dia,Ferrule brass for HDPE pipe with end cap,20 mm PP adopter,20 mm dia G.I.union etc including Labour charges. |
| 19 | Nala/road crossing up to AV 100 mm dia pipe with 200 mm DI K-7 pipe |
| 20 | Reinstatement of following type of roads dismantled during laying of pipe line including supply of all materials, labour and T & P etc. required for proper completion of the work. |
| 21 | Cement Concrete road (as per item no. ...above) for pipe line |
| 22 | Laying of C C old tile with 40% new Tiles soling including dressing surface and including supply of tile, filling of joints with local sand spreading and blinding coat of 10 mm to 25 mm deep of local sand over the entire surface and including all labour, T & P etc. required for proper completion of work. (as per item no..... above) for pipe line |
| 23 | Providing & Fixing of granite stone/MS board for inaugration of tubewell i/c all complete work |
| 24 | Interconnection of water line to main water line i/c all complete work |
| 25 | Site clearance and other unforeseen items |
| 26 | GST Please Enable Macros to View BoQ information |