|
| 1 | दुर्गा नाला पर सेतु बायो रेमिडेसन हेतु कन्स्ट्रेड वेटलेण्ड सिस्टम के निर्माण का कार्य। |
| 2 | Cleaning of silt manually by labour. |
| 3 | E/W excavation in liquid soil (mixed soil) etc all complete. |
| 4 | E/W excavation in foundation with ordinary all complete work.S.I.N 251 |
| 5 | PCC work in 1:4:8 with cement, c/sand and 40 mm stone ballast etc all complete.(SOR 2020-SI No. 281) |
| 6 | Construction of granular sub-base by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smoothMORD specifications 401 |
| 7 | Laying R.C.C. consisting of 1:2:4 with cement, course sand and approved 20mm gauge stone ballast over prepared sub grade after its rectifications & bringing it to proper camber and including supply of all materials, necessary centering &shuttering, labour and T&P etc. all complete.(SOR 2020 - SI No. 285) |
| 8 | Mild steel or iron work in plain work such as reinforced concrete etc all complete. (SOR 2020 -SI No. 504) |
| 9 | M-150 brick work in 1:3 cement coarse sand etc as per(SOR 2020 -SI No. 307) |
| 10 | 12 mm thick plaster in 1:2 with cement & coarse sand etc all cmplete.(SOR 2020 - Road Work. SI No. 581) |
| 11 | Mild steel or iron work in heavy size such as trusses,built up gates,door frames roof work,gates etc. (SOR 2020-SI No. 503) |
| 12 | Providing and making Gabion structure with 600 to 800 mm size stone and Mechaniclly Woven Double TwistedHexagonal shaped wire mesh gabion boxesas per IS 16014:2012, morth clause 2500, of required sise Meshtype 10x12(D=100mm with tolerance of +-2%), Zinc +10% AI ALLOY +pvc coated Mesh wire daimeter etc all comoplte. dsr 16.96 (4882.20 x 0.735=3588.42) |
| 13 | Stone Boulder pitching in apron including cost of Labour T &P etc, requared proper completion of the work.(2503 Morth- 15.1) |
| 14 | H/O Tractor with Trolly. Dsr 2021 |
| 15 | Diversion of water by 8 HP Diesel pump with fuel and operator. |
| 16 | Providing and laying of Bauhinia acuminata shrub or other same type shrub height 60-75 cm in earthen post of size 20 cm as per etc all complete. (dsr horticulture and landscaping 2020) @3/sqm |
| 17 | Protection of embankment of filling breaked portion with empty bags with sand including cost of EC Bags and sandproper placing of filled bags. Etc all complete. |
| 18 | P/F of retro-reflectorised cautionary, mandatory and informatory sign as per IRC :- 67-2012 made of high intensity grade sheeting type-IV vide clause 801.3, fixed over aluminium sheeting 1.5 mm thick supported on a mild steel angle iron post 75x75x6 mm etc all complete.(SOR-LUCK-S.I.No.MoRTH- 801-8.4) |
| 19 | Retro- Reflective Sheeting type-IV with 4mm thick ADM Double sidereflective signs with a corrosion resistant 4mmthick with 0.4 to 0.5 mm both side aluminium skin aluminium composite panal face to be fully covered with high+B48 intensity prismatic sheeting type IV as per IRC-67:2012 retro reflective sheeting with back frame MS angale of35x35×5 mm legends, letters, numesals and borders etc all complete. (SOR-LUCK-S.I.No.MoRTH-801) |
| 20 | Arrangement of Videography and photography at site before,after, before and middle of work etc all complete. |
| 21 | S /1. & Joining of R.C.C. Hume pipe N P -3 etc all complete. Sor 2020 |
| 22 | Head load of extra cartage material etc all complete.(3 chain) |
| 23 | S/F of sign Board with all complete. |
| 24 | Add Consultancy Fee.(for architectural drawing, VETTING etc)Add @ 1.5% |
| 25 | Add GST @ 18% |
| 26 | Maintenance For 1st Year (B) |
| 27 | Cleaning of silt manually by labour. |
| 28 | E/W excavation in foundation with ordinary all complete work.S.I.N 251 |
| 29 | Providing and laying of Bauhinia acuminata shrub or other same type shrub height 60-75 cm in earthen post of size 20 cm as per etc all complete. (dsr horticulture and landscaping 2020-49 x0.9 =40.5 ) |
| 30 | Protection of embankment of filling breaked portion with empty bags with sand including cost of EC Bags and sandproper placing of filled bags. Etc all complete. |
| 31 | Add GST @ 18% |
| 32 | Maintenance For 2nd Year |
| 33 | Maintenance For 3rd Year Please Enable Macros to View BoQ information |