| 1 | Construction of embankment with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacting to meet requirement of table 300-2. including all labour, material, labour cess, T&P etc complete but excluding GST. |
| 2 | Construction of granular sub-base by providing close graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with front end loader at OMC, and compacting with vibratory roller to achieve the desired density, complete as per clause 401 including all labour, material, labour cess, T&P etc complete but excluding GST. |
| 3 | Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density. including all labour, material, labour cess, T&P etc complete but excluding GST. |
| 4 | Providing and applying Tack coat with VG-10 Bitumen over Bituminous surface at the rate of 0.20 kg per sqm on the prepared bituminous surface cleaned with Hydraulic ar per Technical Specification Clause 503. including all labour, material, labour cess, T&P etc complete but excluding GST. |
| 5 | Providing and laying bituminous concrete with higher capacity batch type hot mix plant using crushed aggregates of specified grading, premixed with bituminous binder VG-30 @ 5.4 per cent of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause No. 507 complete in all respects including all labour, material, labour cess, T&P etc complete but excluding GST. |
| 6 | Construction of sub-grade and earthen shoulders with approved material obtained from borrow pits with all lifts & leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of table No. 300-2 including all labour, material, labour cess, T&P etc complete but excluding GST. Please Enable Macros to View BoQ information |