| 1 | 1. Extension of pipeline at Karumbirankottai AD Kudieruppu in karumbirankottai panchayat |
| 2 | Earth work excavation and depositing on bank with initial lead of 10 m and lift of 2 M in narrow trenches for laying of pipes etc |
| 3 | Supply and delivery of following PVC Pipes 63mm OD PVC 4KSC Pipes |
| 4 | Conveyance of the following rigd PVC Pipes, lowering to trenches and laying to proper grade and alignment 63mm OD PVC 4KSC Pipes |
| 5 | Refiiling the excaveted soil charges including cost and conveyamce of all materials to all labour charges etc |
| 6 | 2. Construction of PUMP Room at Mela Karumbirankottai near Pillayar Koil 10000 Lr Cap OHT in Karumbirankottai Panchayat. |
| 7 | Earth work excavation and depositing on bank with initial lead and lift in hard stiff clay, stiff black cotton,hard red earth, shales, murrum gravel, stoney earth and eart mixed with small size boulders and hard gravelly soil as per SS20 B for foundation etc complete., |
| 8 | Suply and Filling withCoarse Gravel including cost and conveyance of all materials to site and all labour charges etc., |
| 9 | Filling with M sand including cost and conveyance of all materials to site and all labour charges etc., |
| 10 | Cement concrete 1:4:8 mix using 40mm gauge hand broken granite tone jelly for foundation including dewatering if found ecessary and laid in layers of not more than 15 cm thick and compacted,etc., complete |
| 11 | Brick work in cement mortar 1:5 mix using country bricks 83/4\"x43/8\"x23/4\" and conveyance of all materials to site and all labour charges etc complete |
| 12 | R.C.C. 1:1.5:3mix using 20mm HBG metal including cost and conveyance of all materials to work site and all labour charges etc.comple |
| 13 | Supply and FABRICATION of Steel including cost and conveyance of all materials to site and all labour charges etc. |
| 14 | Providing form work centering for soffits of slab of plan surface including shuttering 3m high using MS sheets of size 15 x 25 x 3 mm laid over w.joints of size 10 x 6.50 cm spaced 75mm c/c complying with standard specification |
| 15 | Fabrication and supply of new steel door of Size 1.000x2.00m including cost and conveyance of all labour charges etc., complete. |
| 16 | Providing Granolithic Pattern Floor finish with plain cement concrete 1:2:4 using 10-12 mm ISS HBG metal and top rubbed smooth etc., complete |
| 17 | Ceiling Plastering with cm 1:3 mix( one cement and Three sand ) to 10 mm thick including cost and conveyance of all materials in all floors etc.,as directed by departmental officers etc, complete |
| 18 | Plastering with cm 1:5 mix( one cement and five sand ) to 12 mm thick including cost and conveyance of all materials in all floors etc.,as directed by departmental officers etc, complete |
| 19 | Distempering two coats with shell lime including cost and conveyance of all labour charges etc., complete. |
| 20 | Emulsion Painting two coats with shell lime including cost and conveyance of all labour charges etc., complete. |
| 21 | painting two coats for new iron works including cost and conveyance of all labour charges etc., complete. |
| 22 | 3. Providing House hold Tap Connection (07 Nos) and Extension of Pipeline from vandayar theru to keelakarumbirankottai in karumbirankottai Panchayat |
| 23 | Earth work excavation and depositing on bank with initial lead of 10 m and lift of 2 M in narrow trenches for laying of pipes etc |
| 24 | Supply and delivery of following PVC Pipes 63mm OD PVC 4KSC Pips |
| 25 | Conveyance of the following rigd PVC Pipes, lowering to trenches and laying to proper grade and alignment 63mm OD PVC 4KSC Pips |
| 26 | Refiiling the excaveted soil charges including cost and conveyamce of all materials to all labour charges etc |
| 27 | FOR FHTC |
| 28 | Earth work excavation and depositing on bank with initial lead of 10 m and lift of 2 M in narrow trenches for laying of pipes etc |
| 29 | Supply and delivery of following UPVC Pipes (Un Plasticized Polyvinyl Chloride) UPVC used for residential and home application water pressure in residential areas do not normally exceed the maximum tolerance. 20mm UPVC pipe |
| 30 | Conveyance of the following rigd UPVC Pipes, lowering to trenches and laying to proper grade and alignment 20mm UPVC pipe |
| 31 | Refiiling the excaveted soil charges including cost and conveyamce of all materials to all labour charges etc |
| 32 | Supply and fixing of following specials etc complete., |
| 33 | 20mm poly propylene comoression MTA |
| 34 | 20mm poly propylene comoression FTA |
| 35 | 20mm dia UPVC Elbow |
| 36 | 15mm GM Ferrule |
| 37 | 63mm x 20mm PVC saddle piece |
| 38 | Brass chromium plated screw down Tap |
| 39 | Provision for RCC Precast Post (0.15 x 0.15x 1.20m) |
| 40 | Provision for RCC Platform |
| 41 | Labour for drilling cutting threading and fixing ferrule in distribution pipe 20mm dia |
| 42 | Flow control value |
| 43 | GST Amount for providing Service to Government Contract Works for the above Construction & Maintenance Works. { GST Amount is the Total GST Amount for overall quoted amount (Both Construction and Maintenance) above this row in column \"BB\" for all works in this package}(Refer Clause 1 & 42 of Section 2 of Instruction to Bidders (ITB) of SBD) Please Enable Macros to View BoQ information |