| 1 | 1. Extension of Pipe Line @ Venkitakulam Keelatheru in Venkitakulam Panchayat |
| 2 | Earth work excavation and depositing on bank with initial lead of 10 m and lift of 2 M in narrow trenches for laying of pipes etc |
| 3 | Supply and delivery of following PVC Pipes 63mm OD PVC 4KSC Pipes |
| 4 | Conveyance of the following rigd PVC Pipes, lowering to trenches and laying to proper grade and alignment 63mm OD PVC 4KSC Pipes |
| 5 | Refiiling the excaveted soil charges including cost and conveyamce of all materials to all labour charges etc |
| 6 | 2. Construction of Kitchen Shed at Venkidakulam Community Hall near in Venkidakulam Panchayat |
| 7 | Earth work excavation and depositing on bank with initial lead and lift in hard stiff clay, stiff black cotton,hard red earth, shales, murrum gravel, stoney earth and eart mixed with small size boulders and hard gravelly soil as per SS20 B for foundation etc complete., |
| 8 | Filling with M sand including cost and conveyance of all materials to site and all labour charges etc., |
| 9 | Suply and Filling withCoarse Gravel including cost and conveyance of all materials to site and all labour charges etc., |
| 10 | Cement concrete 1:4:8 mix using 40mm gauge hand broken granite tone jelly for foundation including dewatering if found ecessary and laid in layers of not more than 15 cm thick and compacted,etc., complete |
| 11 | R.C.C. 1:1.5:3mix using 20mm HBG metal including cost and conveyance of all materials to work site and all labour charges etc.comple |
| 12 | Brick work in cement mortar 1:5 mix using country bricks 83/4\"x43/8\"x23/4\" and conveyance of all materials to site and all labour charges etc complete |
| 13 | Providing form work centering for soffits of slab of plan surface including shuttering 3m high using MS sheets of size 15 x 25 x 3 mm laid over w.joints of size 10 x 6.50 cm spaced 75mm c/c complying with standard specification |
| 14 | Plastering with cm 1:5 mix( one cement and five sand ) to 12 mm thick including cost and conveyance of all materials in all floors etc.,as directed by departmental officers etc, complete |
| 15 | Supply and FABRICATION of Steel including cost and conveyance of all materials to site and all labour charges etc. |
| 16 | Providing Granolithic Pattern Floor finish with plain cement concrete 1:2:4 using 10-12 mm ISS HBG metal and top rubbed smooth etc., complete |
| 17 | Distempering two coats with shell lime including cost and conveyance of all labour charges etc., complete. |
| 18 | Emulsion Painting two coats with shell lime including cost and conveyance of all labour charges etc., complete. |
| 19 | Supply and fixing of Galvalume Sheet including cost and conveyance of all labour charges etc., complete. |
| 20 | 3. Extension of Pipe Line @ Venkitakulam Melatheru in Venkitakulam Panchayat |
| 21 | Earth work excavation and depositing on bank with initial lead of 10 m and lift of 2 M in narrow trenches for laying of pipes etc |
| 22 | Supply and delivery of following PVC Pipes 63mm OD PVC 4KSC Pipes |
| 23 | Conveyance of the following rigd PVC Pipes, lowering to trenches and laying to proper grade and alignment 63mm OD PVC 4KSC Pipes |
| 24 | Refiiling the excaveted soil charges including cost and conveyamce of all materials to all labour charges etc |
| 25 | GST Amount for providing Service to Government Contract Works for the above Construction & Maintenance Works. { GST Amount is the Total GST Amount for overall quoted amount (Both Construction and Maintenance) above this row in column \"BB\" for all works in this package}(Refer Clause 1 & 24 of Section 2 of Instruction to Bidders (ITB) of SBD) Please Enable Macros to View BoQ information |