| 1 | Part A: Take apart, transportation and installation of 586.5 mtr. (i.e. 17 pillars) 1000mm width 1X90kW, 550V single drive belt conveyor complete at R-VIIA seam |
| 2 | Take apart of the 1000mm width, 1x90kW, 550V, single Drive Head unit Complete with Drive Drum, Driven Drum, Gear Box, Motor, Couplings, Bearing Blocks, baseplate, fencing etc. from previous panel |
| 3 | Take apart of the complete Discharge Unit with strike plate & chute plate of 1000mm width from previous panel |
| 4 | Take apart of the complete loop take up unit of 1000mm width from previous panel |
| 5 | Take apart of 586.5 mtr. 1000mm width belt conveyor structure complete with stringer, foot stool, top bracket, top roller, bottom roller, decking plate, scrapper etc. (considering 0.145Te per mtr.) from previous panel |
| 6 | Unlapping & pulling out of 1190 mtr. 1000mm width PVC belting from previous panel |
| 7 | Transportation of the 1000mm width, 1x90kW, 550V Drive Head complete including gear box, motor, couplings, bearing blocks, fencing etc. from previous panel and installation at 73L/6D with necessary fabrication job |
| 8 | Transportation of Discharge Unit complete with girders, strike plate, chute plates, scrappers etc. from previous panel and installation at 73L/5D with necessary fabrication job |
| 9 | Transportation of Loop Take Up Unit complete with motorized winch from previous panel and installation at 73L/(6D-7D) with necessary fabrication job |
| 10 | Transportation of 586.5 mtr. (i.e. 17 pillars) 1000 mm belt conveyor structure complete with stringer, foot stool, top bracket, top & bottom roller etc. from previous panel and installation from 73L/5D to 73/22D (considering 0.145Te per mtr.) |
| 11 | Transportation of Tail End Unit complete from previous panel and installation at 73L/22D with necessary fabrication job |
| 12 | Loading, transportation and unloading of one ACB (550V/200A), starter (550V/90kW), LS unit from previous panel to installation site, R-VIIA seam with help of haulages & 30 mtr. manually |
| 13 | Transportation of 1190 mtr. 1000mm width PVC belting from previous panel to installation site with help of haulages & 30 mtr. manually (including 17 mtr. belt for loop) |
| 14 | Laying, lapping, jointing & tensioning of this 1190 mtr. 1000mm width PVC belting in proposed belt |
| 15 | Supply of DA cylinder (6.2 cu.m/cylinder) |
| 16 | Supply of Oxygen cylinder (7.1 cu.m/cylinder) |
| 17 | Supply of MS Nut&Bolt of 5/8\" X 2\" |
| 18 | Supply of 5 Ton turn buckle (for tail end & loop trolley tensioning) |
| 19 | Part B: Civil Work |
| 20 | Civil foundation works for installation of 1X90kW, 550V, 1000mm wide belt conveyer drive head, discharge unit, loop take-up unit and platform for ACB, Starter for proposed belt conveyor in R-VIIA seam |
| 21 | Part C: Roof heightening by drilling blasting in stone, cleaning, roof bolting including cost of drill rod, drill bit for installation of proposed belt conveyor in R-VIIA seam |
| 22 | Roof heightening by drilling blasting in stone, including dressing, cleaning & cost of drill rod, drill bit for installation of proposed belt conveyor in R-VIIA seam |
| 23 | Roof bolting including carrying of materials from surface to u/g side, drilling, grouting & cost of drill rod and drill bit. |
| 24 | Total impact of GST for the purpose of CTC Please Enable Macros to View BoQ information |