Installation of 483 mtr. 1000mm width belt structures with belting along 64L in R-VII seam at 3&4 Incline, J.P.Colly.
2
Transportation of the 1000mm width structures and installation at 64L/12D to 64L/26D(R-VII Seam) along with all associated jobs for extension of belt conveyor in regular intervals(14 times)(excluding supply of materials).
3
Transportation of 966 mtr.(approx) 1000mm PVC belting through haulages & 100mtr. manually to 64L(R-VII) belt extension site.
4
Laying, Lapping, Jointing & Tensioning of this 966 mtr. 1000mm belting from 64L/12D to 64L/26D in R-VII seam during fourteen times belt extension and trial run.
5
Shifting and installation of tailend at the time of belt extension (64L/12D to 64L/26D)
6
Taking apart 1000mm width, structure, lockout arrangement ((0.1457*34.5*14=70.4) ton) and transportation outside panel(by haulages and manually as required)(excluding supply of materials) of previously installed belt conveyors at panel 7
7
Unlapping & pulling out of approximately 966 mtr. 1000mm width PVC belting of previously installed belt conveyors at panel 7 and salvaging them from this panel in R-VII seam to (72L-71L)/4D in R-VII seam by the help of haulage.
8
Supply of M.S. Nut & Bolt (5/8\"x2\")
9
Total impact of GST for the purpose of CTC Please Enable Macros to View BoQ information
We takes all possible care for accurate & authentic tender information, however Users
are requested to refer Original source of Tender Notice / Tender Document published by
Tender Issuing Agency before taking any call regarding this tender.