| 1 | Part A: Transportation, installation, commissioning & trial run of one 1000mm width, 1X110kW, 550V, single drive belt conveyor for a length of 414mtr from 80L to 68L in R-VIIA seam. |
| 2 | Loading, transportation and unloading of one breaker(550V/200A), starter, LS unit from surface to installation site(R-VIIA) with help of haulages & 100 mtr manually. (Distance- approx. 3800mtr.) |
| 3 | Laying-hanging of 100mtr 6.6kV grade 70 sq.mm. PVCDWA cable from TSU to ACB manually. |
| 4 | Transportation of the 1000mm width, 1X110kW, 550kV, Drive Head unit Complete with Loop take up structure, lockout arrangement(71.63) ton) and installation at site (R-VIIA) with necessary fabrication job. |
| 5 | Transportation of 828mtr. 1000mm width PVC belting from dismantled site to belt installation site with help of haulages & 10mtr manually. |
| 6 | Laying, lapping, jointing & tensioning of this 828mtr. 1000mm width PVC belting in proposed belt. |
| 7 | Taking apart 1000mm width, 1X110kW, 550V, single Drive Head unit Complete with Drive Drum, Driven Drum, Gear Box, Motor, Couplings, Bearing Blocks, baseplate, fencing etc., Loop take up structure, lockout arrangement((71.63) ton) and transportation outside panel(by haulages and manually as required) of previously installed belt conveyors at earlir panels. |
| 8 | Unlapping and pulling out PVC belting for belt shortening 1000mm of 840 mtr. length and shifting the same outside the panel |
| 9 | Transportation of 500mtr belt sequence cable from surafce to installation site(R-VIIA); then laying-placing them from 80L belt starter to belt starter in R-VIIA seam. |
| 10 | Testing, trial run, alignment & commissioning of belt conveyor in R-VIIA seam. |
| 11 | Supply of M.S. Nut & Bolt 5/8x2\" |
| 12 | Supply of DA cylinder(6.2 cum) |
| 13 | Supply of industrial oxygen cylinder(7.1cum) |
| 14 | Supply of 5T Turnbukle 89 G 63-88 |
| 15 | Civil foundation works for installation of 1X110kW, 550V, 1000mm wide belt conveyer drive head, discharge unit, loop take-up unit and platform for ACB, Starter for proposed belt conveyor of 3&4 incline, JPC. |
| 16 | Part B: Transportation, installation, commissioning & trial run of one 1000mm width, 1X110kW, 550V, single drive belt conveyor for a length of 102.5mtr along 69L in R-VIIA seam. |
| 17 | Loading, transportation and unloading of one breaker(550V/200A), starter, LS unit from surface to installation site(R-VIIA) with help of haulages & 100 mtr manually. (Distance- approx. 3800mtr.) |
| 18 | Laying-hanging of 100mtr 6.6kV grade 70 sq.mm. PVCDWA cable from TSU to ACB manually. |
| 19 | Transportation of the 1000mm width, 1X110kW, 550kV, Drive Head unit Complete with Loop take up structure, lockout arrangement(26.4) ton) and installation at site (R-VIIA) with necessary fabrication job. |
| 20 | Transportation of 210mtr. 1000mm width PVC belting from dismantled site to belt installation site with help of haulages & 10mtr manually. |
| 21 | Laying, lapping, jointing & tensioning of this 210mtr. 1000mm width PVC belting in proposed belt. |
| 22 | Taking apart 1000mm width, 1X110kW, 550V, single Drive Head unit Complete with Drive Drum, Driven Drum, Gear Box, Motor, Couplings, Bearing Blocks, baseplate, fencing etc., Loop take up structure, lockout arrangement((26.4) ton) and transportation outside panel(by haulages and manually as required) of previously installed belt conveyors at earlier panels. |
| 23 | Unlapping and pulling out PVC belting 1000mm of 210mtr length and transport outside panel |
| 24 | Transportation of 500mtr belt sequence cable from surafce to installation site(R-VIIA); then laying-placing them from previous belt starter to installed belt starter in R-VIIA seam. |
| 25 | Testing, trial run, alignment & commissioning of belt conveyor in R-VIIA seam. |
| 26 | Supply of DA cylinder((12.4 cu. Mtr) @ 6.2Cu. Mtr/cyl.= 2 cyl.) |
| 27 | Supply of Oxygen cylinder(42.6 Cu.mtr)@ 7.1Cu.mtr/cyl.= 6 cyl.) |
| 28 | Supply of M.S. Nut & Bolt 5/8\"\"X2\" |
| 29 | Supply of 5T Turnbukle |
| 30 | Civil foundation works for installation of 1X110kW, 550V, 1000mm wide belt conveyer drive head, discharge unit, loop take-up unit and platform for ACB, Starter for proposed belt conveyor of 3&4 incline, JPC. |
| 31 | Roof heightening by drilling blasting in stone, cleaning, roof bolting including cost of drill rod, drill bit for installation of proposed belt conveyor in R-VIIA seam of 3&4 incline under JPC. (with GST) |
| 32 | Total impact of GST for the purpose of CTC Please Enable Macros to View BoQ information |