| 1 | Pre-Casting & fixing Boundary pillar of Mauaima dy. Head to Tail Canal both side every 200 m including all cost of material,labour T&P etc. work complete. As per direction of engineer in charge. (size-250X250X1650 mm) |
| 2 | Pre-Casting & fixing Kilometer pillar of Mauaima dy. Head to Tail including all cost of material,labour T&P etc. work complete. As per direction of engineer in charge. (size-300X200X1050 mm) |
| 3 | Fabrication,supply and fixing of sign board on angle iron frame 40X40X6 mm. 25X3 mm flat iron board and 18 SWG M.S. Sheet with one coat of red oxide primer,painting and writing letters on it. including cost of all material, labour and T&P etc. on Mauaima dy. As per direction of engineer in charge. |
| 4 | Earth Work in excavation of foundation in all type of soil including all lead,lift T&P etc. complete. As per direction of engineer in charge. |
| 5 | Laying Plain Cement Concrete in 1:3:6 with Cement, Coarse sand having F.M. not less than 2.0 and maximum size of 40 mm crushed stone ballast & including all cost of labour, materials,T&P etc. required for proper completion of work. As per direction of engineer in charge. |
| 6 | 1st class(150) Brick Work in 1:4 with Cement and Coarse sand having F.M. not less than 2.0 including all cost of labour,materials,T&P etc. required for proper completion of work. As per direction of engineer in charge. |
| 7 | Preparation of sub grade for lining work including all cost of material, labour T&P etc. complete. As per direction of engineer in charge. |
| 8 | Supply & Laying LDPE Film(200 micron) below Cement concrete Lining including all cost of material,labour T&P etc. complete. As per direction of engineer in charge. |
| 9 | Laying Plain Cement Concrete in 1:2:4 with Cement, Coarse sand having F.M. not less than 2.0 and maximum size 20 mm crushed stone ballast & including all cost of labour,materials,T&P etc. required for proper completion of work. As per direction of engineer in charge. |
| 10 | Cement pointing 1:2 (struck deep ) Cement mortar including all cost of labour,materials,T&P etc. required for proper completion of work. As per direction of engineer in charge. |
| 11 | Wearing coat in M-20 (1:1.5:3) including cost of all material labour & T&P etc. complete. As per direction of engineer in charge. |
| 12 | Providing and fixing 100 mm dia R.C.C. N.P.2 pipe including all cost of material,labour T&P etc. complete. As per direction of engineer in charge. |
| 13 | Painting of pucca Structure including cost of Labour & T&P etc. complete. As per direction of engineer in charge. |
| 14 | Cement Plastering 1:4 Cement mortar including all cost of labour, materials, T&P etc. required for proper completion of work. As per direction of engineer in charge. |
| 15 | Providing Steel Reinforcement and cutting bending, binding including all cost of labour material & T&P etc. As per direction of engineer in charge. |
| 16 | Reinforced Cement Concrete M-20 with stone grite 10 to 20mm. Size, cement and course sand including cost of labour material etc. complete. As per direction of Engineer in charge. |
| 17 | Centering & Shuttering including cost of material, labour etc. complete. As per direction of Engineer in charge. |
| 18 | Centering & Shuttering for foundation including cost of material, labour etc. complete. As per direction of Engineer in charge. |
| 19 | Earth Work on Ramp approach and Road Diversion with material and labour etc. as per direction of engineer in charge. |
| 20 | Ist class(150) brick soling on edge both side including cost of Labour & T&P etc. complete. As per direction of engineer in charge. |
| 21 | Suppling and Fixing 75mm. Dia P.V.C. pipe for weep holes & rain water including cost of labour material etc. As per direction of engineer in charge. |
| 22 | Painting one coat of red oxide primer on steel surface after sand papering and cleaninig of surface including cost of all material labour and t&p etc. As per direction of engineer in charge. |
| 23 | Painting two coat synthetic enamel paint including all material, labour T&P etc. complete. As per direction of engineer in charge. |
| 24 | Oiling and greasing charge in steel gate including all cost of material, labour T&P etc. complete. As per direction of engineer in charge. |
| 25 | Casting and fixing of R.C.C. Wheel guard including all labour,materials T&P etc. complete. As per direction of engineer in charge.( size-200X200X1200 mm) |
| 26 | Dewatering by hiring 5H.P. diesel pumps including operator & P.O.L. complete. As per direction of Engineer-in-charge. |
| 27 | Filling expansion Joint with joint filler board 12.5 mm thick as per direction of engineer in charge. Please Enable Macros to View BoQ information |