| 1 | Earth work in excavation by mechanical means (Hydraulic excavator) means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5m, in any type of soil as directed by Engineer-incharge Complete all as specified and directed. |
| 2 | All as per item No 01 above but exceeding 1.5 m deep and n.exc 3.00 m. Complete all as specified and directed. |
| 3 | Returning, filling in, including spreading, levelling, watering and well ramming in layers not exceeding 25 cm.complete all as specifieddirected. |
| 4 | Removing excavated materialn exceeding 50m and depositing where directed at a level n exc. 1.5 m complete all as specifieddirected. |
| 5 | Material and Labour for Plain Cement concrete in foundations, filling and mass concrete of type C2 1:3:6 ( 40 mm graded aggregate Cement Complete all as specified and directed. |
| 6 | Material and Labour for reinforced cement concrete (M-25 design mix) using 20mm graded aggregates as in foundations, including rafts, footings, foundation beams; plinth beams; bases for columns, etc.; basement slabs, under-reamed piles and mass concreteComplete all as specified and directed. |
| 7 | Material and Labour for reinforced cement concrete (M-25 design mix) using 20mm graded aggregates as in walls, retaining walls, basement walls, ballast walls and the like; any thickness; above top of footings; including attached pilasters and buttresses Complete all as specified and directed. |
| 8 | Material and Labour for reinforced cement concrete (M-25 design mix)using 20mm graded aggregatesas inSlabs supported on walls, beams and columns in floors, roofs, landings, balconies, canopies, deck slabs and in shelves and the like Complete all as specified and directed.Note for item Nos 6 to 8: Reinforcement & form work shall be measured and paid separately. |
| 9 | Material and Labour for Precast cement reinforced cement concreteslabs (M-25 design mix) using 20mm graded aggregates) set in CM 1:4 including formwork of thickness upto 15cm thick etc all as specified and as directed by Engr-In-Charge Complete all as specified and directed. Note: Reinforcement shall be measured and paid separately. |
| 10 | Material and Labour for formwork to faces of drainage base, etc.; vertical or to batter fair finished surfaces, complete all as specified as directed. |
| 11 | Material and Labour for formwork to faces of drainage walls, and similar items etc. vertical or to batter fair finished surfaces, complete all as specifieddirected. |
| 12 | Material and Labour for formwork to soffits of drainage covered slab and similar items etc.to batter fair finished surfaces, complete all as specifieddirected. |
| 13 | Low density polyethylene pipes (LDPE) of 50mm dia of pressure rating 6kgf/cm2 embeded in retaining walls complete as weep holes etc. Complete all as specified and directed. |
| 14 | Supply and Fix in repairs TMT steel bars 10 mm dia and over, cut to length, bent to shape required, including cranking, bending spirally for hooping for columns, hooking ends and binding with and including mild steel wire (annealed) not less than 0.90 mm dia. Or securing with clips Complete all as specified and directed. |