|
| 1 | TABLE WRITING : FD - 33/249/275Taking out existing unserviceable top from table writting and Supply and Fix new top made of 18 mm thick prelaminated MDF board exterior grade ISI marked incl all round 4 mm thick teak wood beading, complete all as specified and shown on drg. (Note:- Above drawingpertains to Srl item No 01to 08 here-in-after.) |
| 2 | Taking out old unserviceable particle board and chromium plated knobs from upper drawer of Table writingand Supply and Fix new made of 18mm thick prelaminated MDF board exterior grade and chromium plated knobs to the upper drwarer, complete all as specified and shown on drg. |
| 3 | Taking out old unsersviceable long stiffner from table writing and Supply and Fix new stiffner made of 2nd class hard wood, complete all as specified and as shown on drg. |
| 4 | Taking out old unsersviceable Side stiffner from table writing and Supply and Fix new stiffner made of 2nd class hard wood, complete all as specified and as shown on drg. |
| 5 | Taking out old unserviceable cabinet of table writing and Supply and Fix new cabinet made of 18mm thick prelaminated MDF board exterior grade in both side and bottom, complete all as specified and as shown on drg. |
| 6 | Taking out old unserviceable shutter from table writing and Supply and Fix new shutter made of 18mm thick prelaminated MDF board exterior grade with 4mm thick teak wood beading duly fitted with suitable stainless steel hinges including one knob complete all as specified and as shown on drg. |
| 7 | Taking outunserviceable shoe from table writing and supply and fix new PVC/hard rubber shoe complete all as specified and directed by Engr in Charge. |
| 8 | Material and labour for preparation of wooden surfaces of table writing and polishing of table writing, glossy finished, complete all as specified and directed by Engr - in- Charge. |
| 9 | LOCKER BED SIDE WOODEN :FD - 54 & 222 Taking out unserviceableshutter from lockerand Supply and Fix new shutter made out of 18mm thick ply wood grade BWR, type BB, hung with 2 Nos of MS but hinges medium 75mm, 1 Nos of 100mm aluminium handle including 4mm thick teak wood beading all round the shutter complete all as specified and as shown on drg. (one shutter measured as single unit) (Note:- Above drawingpertains to Srl item No 09 to 13 here-in-after.) |
| 10 | Taking out unserviceableback ply wood from locker and Supply and Fix new back made of 6mm thick ply wood grade BWR, type BB, fixed with screws complete all as specified and as shown on drg. |
| 11 | Taking out unserviceable Hasp and staple from locker and S&F new Hasp and staple fixed with suitable size of screw, complete all as specified and as shown on drg. |
| 12 | Taking out unserviceablelegs with bottom frame from locker bed side and Supply and Fix new legs and bottom framemade with 2nd class hard wood complete all as specified and as shown on drg. |
| 13 | Material and labour for preparation of wooden surfaces of locker bed sideand polishing oflocker bed side, glossy finished, complete all as specified and directed by Engr - in- Charge. |
| 14 | Hat Stand with mirror : FD - 233Taking out old unserviceable looking mirror from hat stand with mirror and Supply and Fix new mirror 5mm thick of approved quality duly fixed with well seasoned bedding, complete all as specified and as shown on drg.(Note:- Above drawingpertains to Srl item No 14 to 19 here-in-after.) |
| 15 | Taking out old unserviceable brass peg from hat stand with mirror and Supply and Fix new brass peg approved quality duly fixed with brass screws,complete all as specified and as shown on drg |
| 16 | Taking out old unserviceable back side ply from hat stand with mirror and Supply and Fix new ply wood 4 mm thick of commercial type, fixed with head less nail, complete all as specified and as shown on drg. |
| 17 | Taking out old unserviceable frontside Teak Face ply from hat stand with mirror and Supply and Fix new teak face ply wood 4 mm thick of commercialfixed with head less nail, complete all as specified and as shown on drg. |
| 18 | Taking out old unserviceable beading from hat stand with mirror and Supply and Fix new beading made of first class hard wood teak of size 35 x 6mm all round, complete all as specified and as shown on drg. |
| 19 | Material and labour for preparation of wooden surfaces of hat stand with mirror and polishing of hat stand with mirror, glossy finished, complete all as specified and directed by Engr - in- Charge. |
| 20 | CHAIR WRITING, CHAIR VISITORS:-FD/E6/MAP/12 & TPRemoving unserviceable seat, S & F new seat of 12 mm thick hot pressed plywood upholstered with fabric & moulded polyurethane foam. The seat foam shall be designed with contour lumber supportwith PVC lipping all around. The cushions shall be of 40 density, 75mm thick along with the fabric of approved quality & color. All as directed by Engr-in-Charge.(Note:- Above drawingpertains to Srl item No 20 to 24 here-in-after.) |
| 21 | All as per serial item No.21 here-in-before but for back of chair. |
| 22 | Removing unserviceable hand rest, S & F new hand rest replacing the old matching the previous all in shape, size, material & quality, complete all as specified and directed. |
| 23 | Removing unserviceable rubber stoppers, & S & F new rubber stoppers as approved, complete all as specified and directed. |
| 24 | M & Lpainting all over the steel chairs with one coat of synthetic enamel paint of black colour appliedwith spray gun after properly smoothening the surface with the help of an electric grinder, including applying putty on dents, complete all as specified and directed by Engineer-in-Charge. |
| 25 | ALMIRAH LARGE STEEL WITH SHELVE FD-1031, FD-67(M)Removing unserviceable shelves, S & F new shelves with appropriate nutsand bolts, fabricated out of 1 mm thick MS sheet duly applied with red oxide zinc chrome primer, complete all as specified and directed.(Note:- Above drawingpertains to Srl item No 25 to 35 here-in-after.) |
| 26 | Removing unserviceable lock, S & F new lock, 6 leverspattern of steel with duplicate key & hole cover. The keys & lock shall have embedded similar numbers for identification all as directed. |
| 27 | Removing unserviceable steel chromium plated handle, S & F new steel chromium plated handle 125mm size approved quality completed all as directed. |
| 28 | Removing unserviceablelocking assembly,S & F new locking assembly with cover duly painted complete all as specified and directed. |
| 29 | Removing unserviceable hanging rod, S & Fnew hanging rod 20 mm dia, 1.6mm thick CP steel conduit pipe with sockets all as directed. |
| 30 | Removing unserviceable bottom base from Almirah large steel and supply & Fix new bottom base made out of 1mm thick MS sheetduly applied with red oxide zinc chrome primer, complete all as specified and directed. |
| 31 | Adjustment of the existing shelves of Almirah large steel by providing new clamps incl removing unserviceable clamps, complete all as specified and directed. |
| 32 | Removing of existing unserviceable hinges from Almirah large steel andS & F new hinges medium weight, cold rolled mild steel of size 75mm, complete all as specified and directed. |
| 33 | Removing unserviceable leg, S & F New leg made out of 1mm thick MS sheet duly applied with red oxide zinc chrome primer, complete all as specified and directed. |
| 34 | Removing of existing unserviceable shutter from Almirah large steel and supply and fix new shutter made out of 1mm thick MS sheet duly applied with red oxide zinc chrome primer, complete all as specified and directed. |
| 35 | M&L denting & painting Almirah both internally and externally with synthetic enamel paint ofblack /Oilve Green/Smoke colour as specified and applying with spray gun after properly smoothening the surface with the help of an electric grinder, applying putty on dents and providing two coats ofsynthetic enamel paint complete all as specified and directed by Engr-in-Charge. |
| 36 | ALMIRAH MEDIUM STEEL WITH SHELVE : FD-1032Removing unserviceable shelves, S & F new shelves with appropriate nutsand bolts, fabricated out of 1 mm thick MS sheet duly applied with red oxide zinc chrome primer, complete all as specified and directed.(Note:- Above drawingpertains to Srl item No 36 to 45 here-in-after.) |
| 37 | Removing unserviceable lock, S & F new lock 6 levers Godrej pattern of steel with duplicate key & hole cover. The keys & lock shall have embedded similar numbers for identification all as directed. |
| 38 | Removing unserviceable steel chromium plated handle, S & F new steel chromium plated handle 125mm size approved quality completed all as directed. |
| 39 | Removing unserviceable locking assembly with cover,S & F new locking assembly with cover duly painted complete all as specified and directed. |
| 40 | Removingunserviceable bottom base from Almirah medium steel and supply & Fix new bottom base made out of 1mm thick MS sheet duly applied with red oxide zinc chrome primer, complete all as specified and directed. |
| 41 | Adjustment of the existing shelves of Almirah medium steel by providing new clamps incl removing unserviceable clamps complete all as specified and directed. |
| 42 | Removing of existing unserviceable hinges from Almirah med steel andS & F new hinges medium weight, cold rolled mild steel of size 75mm complete all as specified and directed. |
| 43 | Removing of existing unserviceable shutter from Almirah med steel and supply and fix new shutter made out of 1mmthick MS sheet duly applied with red oxide zinc chrome primer, complete all as specified and directed. |
| 44 | Removing unserviceable legs, S & F new legs made out of 1mm thick MS sheet duly applied with red oxide zinc chrome primer, complete all as specified and directed. |
| 45 | Material & Labour denting & painting the Almirah both internally and externally with synthetic enamel paint ofblack /Oilve Green/Smoke colourand applying with spray gun after properly smoothening the surface with the help of an electric grinder, applying putty on dents and providing two coats of synthetic enamel paint complete all as specified and directed by Engr-in-Charge. |
| 46 | TABLE OFFICE CLERK STEEL: FD-1004 & 84(M)Removing unserviceable top and S & F new top of pre-laminated MDF board 18mm thick exterior grade in shade as approved by GE both side lamination with PVC edging matching the color of the top complete all as specified and directed.(Note:- Above drawingpertains to Srl item No 46 to 50 here-in-after.) |
| 47 | Removing unserviceable drawer & S & F new drawer steel all as per drawing. |
| 48 | Removing of existing unserviceable lock of drawer from table office clerk steel and supply and fix new locks of drawer 4 lever complete all as specified and directed. |
| 49 | Removing unserviceable shoe, S & F new hard rubber shoe to legs complete all as specified and directed. |
| 50 | M & L for painting all over the steel table withone coat synthetic enamel paint of black/oilve green colour and applying with spray gun after properly smoothening the surface with the help of an electric grinder, applying putty on dents, complete all as specified and directed by Engineer-in-Charge. |
| 51 | TABLE OFFICE OFFICERS STEEL: FD-1003 & (84)/84MRemoving unserviceable top, S & F new top of pre-laminated MDF board 19mm thick exterior grade in shade as approved by GE and both side lamination with 4mm teak wood beading all round the table.(Note:- Above drawingpertains to Srl item No 51 to 55 here-in-after.) |
| 52 | Removing unserviceable drawer and cabinet, S & F new drawer &cabinetsteel all as per drawing. |
| 53 | Removing of existing unserviceable lock of drawer from table office officers steel and supply and fix new lock of drawer 4 lever complete all as specified and directed. |
| 54 | Removing unserviceable shoe & S & F new hard rubber shoe to legs complete all as specified and directed. |
| 55 | M & Lpainting all over the steel tablewith one coat synthetic enamel paint of black colour and applyingwith spray gun after properly smoothening the surface with the help of an electric grinder, applying putty on dents, complete all as specified and directed by Engineer-in-Charge. |
| 56 | LOCKER BED SIDE STEEL : FD-257,1024Removing unserviceablehasp & staples S & F newhasp & staples 75mm long as per drg all as directed.(Note:- Above drawingpertains to Srl item No 56 to 64 here-in-after.) |
| 57 | Removing unserviceable MS steel CP handle, S & F new MS steel CP handle 100mm long as per drg all as directed. |
| 58 | Removing unserviceable CP steel conduit , S & F new CP steel conduit 20mm dia hanging rodwith brackets16 guage as per drg all as directed.. |
| 59 | Removing of existing unserviceable hinges from locker bed side andS & F new hinges medium weight, cold rolled mild steel of size 75mm complete all as specified and directed. |
| 60 | Removing unserviceable leg locker bed side steel , S & F new leg made out of 1mm thick MS sheet duly applied with red oxide zinc chromate primer, complete all as specified and directed. |
| 61 | Removing of existing unserviceable shutter form locker bed side steel and supply and fix new shutter made out of 1mm thick MS sheet duly applied with red oxide zinc chromate primer, complete all as specified and directed. |
| 62 | Taking out unserviceable bottom base from locker bed side steel and supply and fix new bottom base made out of 1mm thick MS sheet duly applied with red oxide zinc chromate primer, complete all as specified and directed. |
| 63 | Removing unserviceable shelve, S & F new shelve made out of 1mm thick MS sheet duly applied with red oxide zinc chromate primer, complete all as specified and directed. |
| 64 | M & Ldenting & painting of locker with one coat synthetic enamel paint colour olive green after preperation of surface by cleaning & smoothening with electric grinder & applying putty/primer where necessity complete all as specified, shown on drg & directed by Engr-in-Charge. |
| 65 | CHAIR COMPUTER, CHAIR REVOLVING EXECUTIVE(HIGH/LOW BACK), CHAIR REVOLVING WITH ARMS : FD/E6/MAP/01 & TPRemoving unserviceable seat, S & F new seat of 12 mm thick hot pressed plywood upholstered with fabric & moulded polyurethane foam. The seat foam shall be designed with contour lumber supportwith PVC lipping all around. The cushions shall be of 40 density, 75mm thick along with the fabric of approved quality & color. All as directed by Engr-in-Charge.(Note:- Above drawingpertains to Srl item No 65 to 71 here-in-after.) |
| 66 | All as per serial item No 65.00 here-in-before but for back of chair. |
| 67 | Removing unserviceable castor wheels, S & F new castor wheelsas per the approved sample allas directed. |
| 68 | Removing unserviceable hand rest, S & F new hand restmatching the previous all in shape, size, material & quality all as directed. |
| 69 | Removing unserviceable pedestal assembly, S & F new pedestal assemblyall matching the shape, size & quality of the previous all as directed. |
| 70 | Removing unserviceable synchro tilting mechanism & replacing with new synchro tilting mechanism. |
| 71 | M & Lservicing the gas lift mechanism & making the seat adjustment functional. All as directed by Engr-in-Charge. |
| 72 | TABLE COMPUTER : FD/E6/MAP/03 & TPRemoving unserviceable top, S & F new top of pre-laminated MDF board 18mm thick exterior grade in shape as approved by GE both side lamination with 4mm thick teak wood beading duly polished and sunmica pasted matching the color of the top as per required complete all as specified and directed.(Note:- Above drawingpertains to Srl item No 72 to 76 here-in-after.) |
| 73 | Removing unserviceable key board tray & S & F new key board tray18mm thick prelaminated MDF board of exterior grade (450x480mm) on telescopic channel all as per drawing. |
| 74 | Removing unserviceable drawer and S&F new drawer 18mm thick prelaminated particle board 75mm deep on telescopic channel all as per drawing. |
| 75 | Removing unserviceable shoes, S & F new hard rubber shoes (nylon buffers) to legs, complete all as specified and directed. |
| 76 | Material and labour for preparation of old painted steel surfaces of Table Computer and applying one coat of synthetic enamel paint, complete all as specified and as directed. |
| 77 | RACK STEEL : FD-1038 Taking out existing unserviceable Shelves (3mm dia MS Rod 3 nos equidistance) from shoe rackand supply and fixing for new shelve20 mm dia MS Pipe with 3mm dia MS Rod 3 nos equidistance welded to leg in same in parallel position each other, complete all as specified and directed .(Note : Above drawingpertains to Srl item No 77 to 79 here-in-after). |
| 78 | M & Lwelding before painting (as per requirement) the rack steel by two coat of synthetic enamel oilve green colour of approved quality over a coat of primer after scrapping off the existing worn out paint with an electric grinder complete all as specified & directed. |
| 79 | Removing unserviceable shoes, S & F new PVC shoes to legs, complete all as specified and directed. |
| 80 | BOOK CASE STEEL FD-1028Removing unserviceable MS channel, S&F new channel 125mm & 1.00mm thick MS sheet channel. (Note : Above drawing pertain to ser item No 80 to 85 ). |
| 81 | Removing unserviceable iron cleat stopper, S&F new iron cleat stopper 3.0mm thick MS sheet channel, complete all as specified and directed. |
| 82 | Removing unserviceable lock, S & F new lock 6 levers Godrej pattern of steel with duplicate key & hole cover. The keys & lock shall have embedded similar numbers for identification all as directed. |
| 83 | Removing unserviceable MS steel CP handle, S & F new MS steel CP handle 100mm long as per drg, complete all as specified and directed. |
| 84 | Removal and replacement of unserviceable glass from each panel of Book case steel as per drg and required. |
| 85 | M & Ldenting & painting of Book Case Steel with one coat synthetic enamel paint colour olive green/Smoke Colour after preperation of surface by cleaning & smoothening with electric grinder & applying putty/primer where necessary, complete all as specified, shown on drg & directed by Engr-in-Charge. |
| 86 | Sofa Set 05 (Five Seater):(One Three Seater and Two Single Seater)] :Trade Pattern) :-Taking out unserviceable legs from Sofa Set [05 (Five Seater) : (One Three Seater and Two Single Seater)] front or rear legs and Supply and Fix new legs made out of 2nd class hard wood, complete all as specified and as shown on drawing(s).(Note : Above drawing pertain to ser item No 86 to 90 ). |
| 87 | Taking out unservicable arms of Sofa Set [05 (Five Seater) : (One Three Seater and Two Single Seater)] and Supply and Fix new arms made out of 2nd class hard wood all as shown on drawing(s). |
| 88 | Taking out damaged upholstery from Sofa (Single Seater) and supply and fix new foam 25 mm thick, 40 density, duly covered with Tapestry Cloth/ Leatherite Rexine both costing not less than Rs 450/- per meter as approved by GE perfect fitting and stitching the foams with lining cloth and Tapestry Cloth/Leatherite Rexine as per existing design including restructuring internal wooden framework and replacement of the damaged members with 2nd class hard wood members as per existing size, complete all as specified and directed. |
| 89 | Taking out damaged upholstery from Sofa (Three Seater) and supply and fix new foam 25 mm thick, 40 density, duly covered with Tapestry Cloth/ Leatherite Rexine both costing not less than Rs 450/- per meter as approved by GE perfect fitting and stitching the foams with inner lining cloth and Tapestry Cloth/Leatherite Rexine as per existing design including restructuring internal wooden framework and replacement of the damaged members with 2nd class hard wood members as per existing size, complete all as specified and directed. |
| 90 | Material and labour for preparation of wooden surfaces and polishing new legs of Sofa Set [Five Seater (One Three Seater and Two Single Seater)] with two or more coats of French polish, glossy finish, after preparation of surface, complete all as specified and directed. (Note:- Sofa Set [05 (Five Seater):(One Three Seater and Two Single Seater)] : Trade Pattern) |
| 91 | Materials and Labour for rendering 8 mm thick, cement plaster, in cement mortar (1:4) mixed with water proofing compound as per manufactures instructions over and including 12 mm thick backing coat in cement mortar (1:4) on fair faces of brick work or concrete surface in walls, complete all as specified and directed.Note: - (Water proofing compound will be measured and paid separately) |