| Sl. No. | Item Description |
| 1 | Lumpsum price worked out by the tenderer for BUILDING / STURCTURESas listed in Schedule \"A\"Part-I |
| 2 | Lumpsum price worked out by the tenderer for SITE CLEARANCE AND AREA DEVELOPMENT as listed in Schedule \"A\"Part-II |
| 3 | Lumpsum price worked out by the tenderer for INTERNAL WATER SUPPLY as listed in Schedule \"A\"Part-III |
| 4 | Lumpsum price worked out by the tenderer for INTERNAL ELECTRIC SUPPLY as listed in Schedule \"A\"Part-IV |
| 5 | Lumpsum price worked out by the tenderer for PROTECTIVE WORK as listed in Schedule \"A\"Part-V |
| 6 | Lumpsum price worked out by the tenderer for ROAD/ PATH/ CULVERT as listed in Schedule \"A\"Part-VI |
| 7 | Lumpsum price worked out by the tenderer for SEWAGE DISPOSAL/ DIVERSION OF EXISTING SEAWAGE LINE as listed in Schedule \"A\"Part-VII |
| 8 | Lumpsum price worked out by the tenderer for AREA DRAINAGE as listed in Schedule \"A\"Part-VIII |
| 9 | Lumpsum price worked out by the tenderer for FENCING & GATE as listed in Schedule \"A\"Part-IX |
| 10 | Lumpsum price worked out by the tenderer for EXTERNAL WATER SUPPLY as listed in Schedule \"A\"Part-X |
| 11 | Lumpsum price worked out by the tenderer for EXTERNAL ELECTRIC SUPPLY as listed in Schedule \"A\"Part-XI |
| 12 | NOTE: 1. Schedule ‘A’ Part - I here-in-before is not prepriced by MES and left blank under Col. 5 signifies this fact only. Bidder shall insert their rates in Green colour filled under Col-6.2. Schedule ‘A’ Part - II to XI here-in-before are prepriced by MES under Ser No. 2.00to 11.00 Bidders shall insert their lumpsum amount in the Green coloured field under Col-6 only.3. Schedule ‘A’ Part - XII (STP & MISCELLANEOUS ITEMS) hereinafter is not prepriced by MES and prepriced by MES and rate left blank under Col.5 signifies this fact only. Bidder shall insert their rates in Green colour filled under Col-6. |
| 13 | SCHEDULE ‘A’ PART - XII (STP & MISCELLANEOUS ITEMS) |
| 14 | SEWAGE TREATMENT PLANT (STP) AT AVA HILLDesigning (hydraulically, structurally & aesthetically), providing, constructing, hydraulic testing,commissioning and giving satisfactory trials of STP of capacity 75 cum/day (KLD) (suiting to the climatic conditions of the site) consisting of Inlet chamber(RCC), Fine bar Screenchamber (manual) RCC with steel screen, Oil & Grease Remover (RCC), Grit separator, Equalization Tank (2 Tanks of 50% Capacity each)/ any other type of tank as per requirement of technology adopted, Air Grid for Equalization Tanks/ any other type of system as per requirement of technology adopted if required, Feed Pumps (2 No), Bacterial media (of appropriate density, size and quantity to keep very high MLSS > 15,000mg/lit)/ any other system of bacterial ingestion in appropriate density and quantity to keep suitable count at all stages, Air Blowers if required based on technology adopted, Tube Settler assembly if required based on technology adopted, Sludge Drying Bed of appropriate size if required based on technology adopted, Chlorine Dozing System, Chlorine contact tank, Foundation for all E/M equipments, Associated piping work withrequired valves, gates, drains, pathways, Electrical control Panel with interconnecting cable, spare parts for2 years of operation, etc. complete as turnkey job with all involved civil, electrical, digital and mechanicalworks as per detailed specifications for civil, electrical and mechanical components with all duties and taxes complete. For tertiary treatment it also includes Filter Feed Tank of RCC, Filter Feed Pumps, Dual Media Filter,Activated Carbon Filter, Treated water Tank in RCC. Treated water can be used for irrigation, horticulture, fire fighting and MT wash complete all as directed. |
| 15 | SEWAGE TREATMENT PLANT (STP) AT MANDIR VIEWDesigning (hydraulically, structurally & aesthetically), providing, constructing, hydraulic testing,commissioning and giving satisfactory trials of STP of capacity 65 cum/day (KLD) (suiting to the climatic conditions of the site) consisting of Inlet chamber(RCC), Fine bar Screenchamber (manual) RCC with steel screen, Oil & Grease Remover (RCC), Grit separator, Equalization Tank (2 Tanks of 50% Capacity each)/ any other type of tank as per requirement of technology adopted, Air Grid for Equalization Tanks/ any other type of system as per requirement of technology adopted if required, Feed Pumps (2 No), Bacterial media (of appropriate density, size and quantity to keep very high MLSS > 15,000mg/lit)/ any other system of bacterial ingestion in appropriate density and quantity to keep suitable count at all stages, Air Blowers if required based on technology adopted, Tube Settler assembly if required based on technology adopted, Sludge Drying Bed of appropriate size if required based on technology adopted, Chlorine Dozing System, Chlorine contact tank, Foundation for all E/M equipments, Associated piping work withrequired valves, gates, drains, pathways, Electrical control Panel with interconnecting cable, spare parts for2 years of operation, etc. complete as turnkey job with all involved civil, electrical, digital and mechanicalworks as per detailed specifications for civil, electrical and mechanical components with all duties and taxes complete. For tertiary treatment it also includes Filter Feed Tank of RCC, Filter Feed Pumps, Dual Media Filter,Activated Carbon Filter, Treated water Tank in RCC. Treated water can be used for irrigation, horticulture, fire fighting and MT wash complete all as directed. |
| 16 | Designing (hydraulically, structurally and aesthetically), and constructing RCC sumps in M-30 mixof required capacity including excavation in all types of strata, foundation concrete, containerwalls, bottom slab, top RCC roof slab with CI manhole covers and with plaster and water proofing as per zonal specification including epoxy paint inside, refilling of earth and disposal of surplusearth within 50 m lead, including all piping connections, valves, internal electrification, MS ladder,ventilation shaft, BB chambers with 5m of outer wall of tank complete including test for water tightness and hydraulic functioning. Top room as per zonal specifications included for average flow 51-100 cum/day and with overall depth 6.5 m, IL of sewer upto 4 m, inner dia of sewer 2m for collection sump at Ava Hill and mandir view etc complete all as directed. |
| 17 | Supply and installation of Non clog vertical submersible pumps of capacity 25 m head and 125 LPM, 3HP with chrome steel impeller and cutter, non-clog topass 40 mm size particles including guide rail and lifting chain, cables, earthing, testing complete with 2 years maintenance etc complete all as specified and as directed |
| 18 | Supply and installation of Non clog vertical submersible pumps of capacity 25 m head and 75 LPM, 1 HP with chrome steel impeller and cutter, non-clog topass 40 mm size particles including guide rail and lifting chain, cables, Earthing, testing complete with 2 years maintenance etc complete all as specified and as directed |
| 19 | Supply and installation of Non clog vertical submersible pumps of capacity 25 m head and 75 LPM, 1 HP with chrome steel impeller and cutter, non-clog topass 40 mm size particles including guide rail and lifting chain, cables, Earthing, testing complete with 2 years maintenance for lift well at Ava Hill etc complete all as specified and as directed |
| 20 | Supply and fix MCC Panel with PLC control and scada system automation and OCEMS for 65 KLD STP at Mandir View area etc complete all as specified and as directed |
| 21 | Supply and fix MCC Panel with PLC control and scada system automation and OCEMS for 75 KLD STP at Ava Hill area etc complete all as specified and as directed |
| 22 | Supply and fix High density polyethylene pipes (HDPE) of 150 mm diameter, pressure rating 6 kgf/cm2 fixed complete to walls, ceilings or in floors etc complete all as specified and as directed |
| 23 | INTERNAL WATER SUPPLYSupply and fix 15mm two way, single handle, bib cock with flange Bib taps, fancy type, chromium plate cast copper alloy with crutch or butterfly handle, screwed down, screwed for iron pipe or for brass ferrule and fixed complete all as specified and as directed |
| 24 | Supply and fix 15 mm bore angle cocks, cast copper alloy, screwed down, high pressure, with crutch or butterfly handle, screwed both ends for iron pipe or for unions and fixed but fancy type chromium plated all as specified and directed. complete all as specified and as directed. |
| 25 | SEWAGE DISPOSALMaterial and labour for Double Wall Corrugated Polyethylene Pipes (DWCPE) (SN8) 180mm outer dia & 163mm inner dia, laid in trench & in manhole etc complete all as specified and directed. |
| 26 | Material and labour for Double Wall Corrugated Polyethylene Pipes (DWCPE) (SN8) 200mm outer dia & 175mm inner dia, laid in trench & in manhole etc complete all as specified and directed. |
| 27 | Supply and install centrifugal Monoblock pump set suitable for 415 V, 3 phase system having capacity 10 HP all as specified and as directed by Engineer-in-Charge |
| 28 | Supply and fix Fully Automatic Star Delta Starter 7.5 HP to 15 HP type ML 1.5 current rating 10 to 25 Amps in Sheet-Steel Enclosurewith Single Phase Protection feature (Motor Rating AC-3 Duty, 415 V, 50HZ, 3 Ph) all as specified and as directed.Make: L&T/ ABB/ Siemens/ Havells/ Cropton Greaves/ BCH/ C&S Limited/ GE |
| 29 | Supply and fix Foot Valve conforming to IS4038, 50 mm (2”) dia complete all as specified and as directed. |
| 30 | EXTERNAL ELECTRIC SUPPLYSupply and fix terminal box made of thermoplastic type out door type of size 260 x 210 x 116 mm for fixing on pole with and including of mild steel clamps with bolt and nuts, provn for cable entry for incoming and outgoing from bottom including MCB SP 6 Amps 10 kA -1 Nos and 8 way connectorwith internal copper wiring connection duly fixedwith and including cable glants threaded typemade of polymide with lock nut complete all as specified and as directed. |
| 31 | DG SETSupply, Install, test and commissioning, factory assembled silent Diesel Engine driven generator set as per CPCB IV+/ latest CPCB norms, fully wired alternator to give an out put of 20 kVA continuously raing at a power factor 0.8 lagging, 3 phase 4 wire, 415 volts 50 Hz + 1% supply,directly coupled with diesel engine, liquid cooled of of suitable BHP de-rated for Wellington, Nilgiris at high altitude of approximate 2000 Mtr mounted on common base frame complete with floor mounting fuel tank (service tank) of adequate capacity with fuel line and accessories, PCC foundation work as per manufacture\"s instructions, vibration damper pads, AMF control panel, Battery& other accessories etc and comprising of following :- |
| 32 | (a) Diesel Engine liquid cooled, turbocharged with after cooler to deliver required BHP a under NTP condition ofBS 5514 standard de-rated for Wellington, Nilgiris at high altitude of approximate 2000 Mtr and conforming to IS 10001/10002 with an overload capacity of 10% for one hour in any 12 hours continuous operation with the following accessories.(i)Dry type air cleaner(ii) Exhaust Silence suitable for canopy(iii)Expansion bellow(iv) Lube oil Cooler(v)Fuel Filters(vi) Radiator with pusher type fan and mounting(vii)In-line mono block fuel injection pump(viii)Mechanical governor and fuel feed pump(ix) Fly wheel with starter ring and bell bousing suitable for close coupling(x) 12 Volt electric starter motor(xi) Battery charging alternator(xii) Microprocessor based KG934(L1) Controller mounted are fixed in power panel(xiii) Protection system for Low lube oil pressure and High water temperature(xiv) Battery:- Suitable Maintenance free battery with leads & terminals as per OEM recommendation (Make- Exide/Amron) .(xv) Fuel tank:08 hrs. full load diesel storage capacity fuel tank with mounting brackets factory made of 5mm thick HR/MS sheet with level indicator, fuel inlet, fuel outlet, air vent, drain plug, in let arrangement for diesel filling from exterior canopy (without opening its panel) etc complete all as specified and directed. |
| 33 | (b) Alternator suitable rated at 20 kVA at 0.8 power factor , 415 volts, 3 phase, 4 wire, 50 Hz atself excited and self regulated with AVR brushless excitation, screen protected, drip proof , insulation class H,self ventilated, floormounted with ball or bearing on end shields and conforming to IS: 4722 suitable for engine as mentioned here-in before. (c) Accoustic Enclosure:- Acoustic enclosure with outer body made of 3mm thick CRCA sheet , epoxy coated and sound insulation to reduce noise level to 75 dBA measured at 1.0 meter average distance for audible frequenciesas per guide of Central Pollution Control Board or latest CPCB norms and of suitable size and OEM specification and inside illumination with 1 No. 1 x 18 watt LED fitting(d)Standard Gen set Controller with Control Panel -Gen Set controller unit totally enclosed, steel construction control panel suitable for indoor floor/ wall mounting installation with control fuse base with necessary link, power terminals and control terminal start and stop relayhaving following safeties and display parameters :-(i) Engine display Parameter for :-(aa) Oil Pressure(ab) Engine Collant Temperature(ac) Fuel Status(ad) Engine Speed(ae)Battery Voltage(af) Engine Hours |
| 34 | (ii) Mechanical Safeties (along with Display) for :-(aa)Under / Over Speed(ab)Low lube oil Pressure(ac)High Engine coolant Temperature(iii) Gen-Set Display parameter for :-(aa)Phase Voltage(ab)Line Current(ac)Frequency & PF(ad)Average Voltage(ae)Average Current(af) Phase KW and Total KW(ag)KWH(ah)KVA & KVAR(iv) Electrical Safety (alongwith display ) parameter for :-(aa) Genset under / over voltage(ab) Under / Over Frequecny(ac) Phase Failure(ad) Phase sequence reverse(ae) Over Current(af)Over KW(e) Civil works:- All civil works related to foundation(Foundation for DG set using cement concrete type B0 1:2:4(12.5mm) graded aggreagate as directed by Engr-in-charge), installation of panel and equipment & depth of foundation shall be minimum 300mm with anti vibration pads, or as recommended by manufacturers is included in the quoted rate. Cable from DG set to AMF panel, AMF panel to main panel will be measured under relevant schedule. |
| 35 | Manning and Operation including Comprehensive Maintenance |
| 36 | First Year ( for 06 Months only) |
| 37 | Manning & Operation ofSewage treatment plant of capacity 75 KLD at AVA Hill Area, consisting of following equipments & Electrical Panel boards etc. by employing one OEM Trained FGM Per Shift of 8 hrs for 3 Shifts, 24 Hrs per day, (0600 Hrs to 1400 Hrs First Shift and 1400 to 2200 Hrs Second Shift & 2200 Hrs to 0600 Hrs Third shift) including Sundays & Holidays andincluding replacement of consumable spares like a) Gaskets, b) Gland Packing, c) O-Rings, d) Drive belt for air blower, e) Drive belts for centrifuge at clarifier, f) Electrical accessories, g) Indication bulbs, h) Fuses, j) Blades, k) Pipe fixing solution &Adhesives, m) Filtering & support media for sand filter Fine sand, coarse sand, silex, pebbles media, n) Filtering & support media for carbon filter Activated carbon media (o) DG Set , etc and any consumable spares deemed necessary as per site reqiurement.The quoted rate shall be inclusive of replacement of consumalble spares,necessary chemicals complete all as specified and directed. |
| 38 | Manning & Operation ofSewage treatment plant of capacity 75 KLD at AVA Hill Area, consisting of following equipments & Electrical Panel boards etc. by employing one OEM Trained Helper Per Shift of 8 hrs for 3 Shifts, 24 Hrs per day, (0600 Hrs to 1400 Hrs First Shift and 1400 to 2200 Hrs Second Shift & 2200 Hrs to 0600 Hrs Third shift) including Sundays & Holidays andincluding replacement of consumable spares like a) Gaskets, b) Gland Packing, c) O-Rings, d) Drive belt for air blower, e) Drive belts for centrifuge at clarifier, f) Electrical accessories, g) Indication bulbs, h) Fuses, j) Blades, k) Pipe fixing solution &Adhesives, m) Filtering & support media for sand filter Fine sand, coarse sand, silex, pebbles media, n) Filtering & support media for carbon filter Activated carbon media (o) DG Set , etc and any consumable spares deemed necessary as per site reqiurement.The quoted rate shall be inclusive of replacement of consumalble spares,necessary chemicalsrequired for operation and daily maintenace of STP complete all as specified and directed. |
| 39 | 1Manning & Operation ofSewage treatment plant of capacity 65 KLD at Mandir View Area, consisting of following equipments & Electrical Panel boards etc. by employing one OEM Trained FGM Per Shift of 8 hrs for 3 Shifts, 24 Hrs per day, (0600 Hrs to 1400 Hrs First Shift and 1400 to 2200 Hrs Second Shift & 2200 Hrs to 0600 Hrs Third shift) including Sundays & Holidays andincluding replacement of consumable spares like a) Gaskets, b) Gland Packing, c) O-Rings, d) Drive belt for air blower, e) Drive belts for centrifuge at clarifier, f) Electrical accessories, g) Indication bulbs, h) Fuses, j) Blades, k) Pipe fixing solution &Adhesives, m) Filtering & support media for sand filter Fine sand, coarse sand, silex, pebbles media, n) Filtering & support media for carbon filter Activated carbon media (o) DG Set , etc and any consumable spares deemed necessary as per site reqiurement.The quoted rate shall be inclusive of replacement of consumalble spares,necessary chemicals complete all as specified and directed. |
| 40 | Manning & Operation ofSewage treatment plant of capacity 65 KLD at Mandir View Area, consisting of following equipments & Electrical Panel boards etc. by employing one OEM Trained Helper Per Shift of 8 hrs for 3 Shifts, 24 Hrs per day, (0600 Hrs to 1400 Hrs First Shift and 1400 to 2200 Hrs Second Shift & 2200 Hrs to 0600 Hrs Third shift) including Sundays & Holidays andincluding replacement of consumable spares like a) Gaskets, b) Gland Packing, c) O-Rings, d) Drive belt for air blower, e) Drive belts for centrifuge at clarifier, f) Electrical accessories, g) Indication bulbs, h) Fuses, j) Blades, k) Pipe fixing solution &Adhesives, m) Filtering & support media for sand filter Fine sand, coarse sand, silex, pebbles media, n) Filtering & support media for carbon filter Activated carbon media (o) DG Set , etc and any consumable spares deemed necessary as per site reqiurement.The quoted rate shall be inclusive of replacement of consumalble spares,necessary chemicalsrequired for operation and daily maintenace of STP complete all as specified and directed. |
| 41 | Note for Sch. Item No 31, 32, 33 & 34:- (1) (a) Operating Pump sets of any capacity as directed (b)Checking sewage level in the STP. (c) Maintaining Log Book for STP (e) Maintaining record of timing of STP operation (f) Operating Sluice/Gate Valves located within 1 KM from the STP for Supply of treated water to garden/MT vehicle washing as per the time schedule/requirement. (g) Routine maintenance & cleaning/back washing of filteration plant. (h) Carrying out necessary measure to achieve parameters of STP treated water as per Standards for Discharge of STP should be are as follows:- (a) pH 6.5 - 8.5(b) COD <30 mg/L (c) BOD <10 mg/L (d) TSS <10 mg/L (e) Total Nitrogen 10 mg/L (f) Total Phosphorus 1 mg/L (g) Fecal Coliform Nil (h) Odour No foul odour and latest as per latest CPHEEO Manual for Sewerage and Sewage Disposal (j) Operation of DG Set etc (k) Inspect equalization tank/entry to system for blockages, plastics etc and remove. (m) Inspect aerator and note biomass growth, recirculation and any malodour. (n) Grease for all bearings. (o) Drain gearbox oil and replaceAlso check holding plate bolts.(p) Check shaft for wear and alignment. (q) Check all bearings for wear and tear, check all bolts for tightness and check chain coupling and check bolts for tightness. (r) Check motor for overheating (by touch) and remove dust etc. from air fins,grease all bearings through nipples,grease all chain couplings through casing nipples, check oil level in gearbox and top up if necessary,check sludge return system from humus tank for function,apply light lubricating oil in small quantities to locks and hinges,preparing & submitting monthly report on performance of the plant |
| 42 | (2) EQUIPMENTS :(a) (i)Starter Panel - 01 No (b)20 kVA DG set- 01 Nos (c) pH correction Dosing System Pump -01(d) Blower for Equalisation tank -02 Nos(e) Lamella Feed Pump non submersible type - 02 Nos (f) Coagulant Dosing System of 01 nos pump (g) Flocculant dosing System of 01 nos pump (h) Static mixer & Flocculation Tank (j) Static mixer & Flocculation Tank - 01 Set (k) Lamella Clarifier - 01 set (l) Sludge Transfer Pump (m) MBBR feed pump type non submersible - 02 set (n) Air Blower of qty 02 nos (o) Sludge Pump MBBR - 01 (p) Chlorine dosing system pump - 01 No (q) Filter Feed pump - 02 Nos (r) Sludge Transfer (Sewage Lift Well) Pump (s) Treated water transfer pumps - 02 Nos (t) Instruments - 1 lot (u) Connecting Valves of various type/sizes (v) Consumable items (chemicals )for treatment.(w) Raw/Treated water test should be monthly from NABL approved lab andtest report shoul be submitted last day of every month.(3) (i) Contractor shall submit ID proof, residential proof, bank A/C details to department and obtain approval of Engineer-in-Charge before employing a person as operator.(ii) Plant operator shall be available as per the shift timings specified in the tender and he will report to JE E/M in-ChargeIn case of emergency he will function according to their direction.If he is found absent or move without intimating to in-Charge or JE E/M he will be treated as absent for the said shift and recovery of Rs 1500/-per shift shall be affected.(iii) Payment as per quoted rate shall also be deducted in addition to the penalty as specified above. (iv) Contractor shall submit the labour licenece VAT & Copy of GST Regn registered number issued by concerned authority.(v) The payment shall be made to employees on or before 10th of every calender month.Payment to employees shall be done by crossed cheque / RTGS / NEFT / IMPS through Aadhar card linked Bank Account only and it shall not be less than minumum fair wages as per Act in vogue (vi) The rate quoted by the contractor shall be inclusive of life insurance for the tradesmen employed by him in case of untoward incident such as injuries fracture or casualty while on duty(vii) Surprise check will be carried out by department representative and if any employes is not available at his working place, he will be treated as absent. |
| 43 | (viii)Contractor has to submit the list of employees including reserve alongwith police verification, Aadhar card, Aadhar card linked Bank Account No and relevant documents as mentioned in PS to the Engineer-in-Charge alongwith performance security before issue work order.(ix)Contractor has to submit proof of payment of EPF subscription made by his alongwith RAR failing which RAR will not be progressed for payment(x)Contractor has to employ the number of labours per day as intimated by the Engineer-in-Charge for which he has to make alternative arrangement. (xi) The rates quoted by the contractor shall be deemed to be included provision of all latest labour laws / regulations including all relevant taxes as applicable.(xii)Contractor shall quote the rates considering their monthly leaves, releiver etc as per labour laws and nothing extra shall be paid on account of the above. In case of absence of staff/tradesman from duty, payment of that day will not be paid. In addition to that a penalty of Rs 1500/- per day per person will be recovered from contractors dues.Also in case of long absence (more than one week) of staff/tradesman, the penalty shall be recovered including Sundays & Holidays if any.The contractor shall have no claim on this account.(xiii) Contractor has to supply two sets of Tools and Plants (as applicable) to the labours employed by him and should be placed with the safe custody of department.Rates quoted shall be deemed to be included the above provision. |
| 44 | Testing of water before and after treatment of Sewage through NABL accredited lab for following parameters:-(i) Suspended Solids (ii) Particle size of Suspended solid (iii) Dissolved solids (inorganic) (iv) pH value (v) Oil & Grease (vi) Total Residual Chlorine (vii) Ammonical Nitrogen (as N) (viii) Total Nitrogen (as N) (ix) Free Ammonia (as NH3) (x) Biochemical Oxygen Demand (xi) Chemical Oxygen Demandand test report shoul be submitted last day of every month. |
| 45 | Second Year |
| 46 | Manning & Operation ofSewage treatment plant of capacity 75 KLD at AVA Hill Area, consisting of following equipments & Electrical Panel boards etc. by employing one OEM Trained FGM Per Shift of 8 hrs for 3 Shifts, 24 Hrs per day, (0600 Hrs to 1400 Hrs First Shift and 1400 to 2200 Hrs Second Shift & 2200 Hrs to 0600 Hrs Third shift) including Sundays & Holidays andincluding replacement of consumable spares like a) Gaskets, b) Gland Packing, c) O-Rings, d) Drive belt for air blower, e) Drive belts for centrifuge at clarifier, f) Electrical accessories, g) Indication bulbs, h) Fuses, j) Blades, k) Pipe fixing solution &Adhesives, m) Filtering & support media for sand filter Fine sand, coarse sand, silex, pebbles media, n) Filtering & support media for carbon filter Activated carbon media (o) DG Set , etc and any consumable spares deemed necessary as per site reqiurement.The quoted rate shall be inclusive of replacement of consumalble spares,necessary chemicals complete all as specified and directed. |
| 47 | Manning & Operation ofSewage treatment plant of capacity 75 KLD at AVA Hill Area, consisting of following equipments & Electrical Panel boards etc. by employing one OEM Trained Helper Per Shift of 8 hrs for 3 Shifts, 24 Hrs per day, (0600 Hrs to 1400 Hrs First Shift and 1400 to 2200 Hrs Second Shift & 2200 Hrs to 0600 Hrs Third shift) including Sundays & Holidays andincluding replacement of consumable spares like a) Gaskets, b) Gland Packing, c) O-Rings, d) Drive belt for air blower, e) Drive belts for centrifuge at clarifier, f) Electrical accessories, g) Indication bulbs, h) Fuses, j) Blades, k) Pipe fixing solution &Adhesives, m) Filtering & support media for sand filter Fine sand, coarse sand, silex, pebbles media, n) Filtering & support media for carbon filter Activated carbon media (o) DG Set , etc and any consumable spares deemed necessary as per site reqiurement.The quoted rate shall be inclusive of replacement of consumalble spares,necessary chemicalsrequired for operation and daily maintenace of STP complete all as specified and directed. |
| 48 | 1Manning & Operation ofSewage treatment plant of capacity 65 KLD at Mandir View Area, consisting of following equipments & Electrical Panel boards etc. by employing one OEM Trained FGM Per Shift of 8 hrs for 3 Shifts, 24 Hrs per day, (0600 Hrs to 1400 Hrs First Shift and 1400 to 2200 Hrs Second Shift & 2200 Hrs to 0600 Hrs Third shift) including Sundays & Holidays andincluding replacement of consumable spares like a) Gaskets, b) Gland Packing, c) O-Rings, d) Drive belt for air blower, e) Drive belts for centrifuge at clarifier, f) Electrical accessories, g) Indication bulbs, h) Fuses, j) Blades, k) Pipe fixing solution &Adhesives, m) Filtering & support media for sand filter Fine sand, coarse sand, silex, pebbles media, n) Filtering & support media for carbon filter Activated carbon media (o) DG Set , etc and any consumable spares deemed necessary as per site reqiurement.The quoted rate shall be inclusive of replacement of consumalble spares,necessary chemicals complete all as specified and directed. |
| 49 | Manning & Operation ofSewage treatment plant of capacity 65 KLD at Mandir View Area, consisting of following equipments & Electrical Panel boards etc. by employing one OEM Trained Helper Per Shift of 8 hrs for 3 Shifts, 24 Hrs per day, (0600 Hrs to 1400 Hrs First Shift and 1400 to 2200 Hrs Second Shift & 2200 Hrs to 0600 Hrs Third shift) including Sundays & Holidays andincluding replacement of consumable spares like a) Gaskets, b) Gland Packing, c) O-Rings, d) Drive belt for air blower, e) Drive belts for centrifuge at clarifier, f) Electrical accessories, g) Indication bulbs, h) Fuses, j) Blades, k) Pipe fixing solution &Adhesives, m) Filtering & support media for sand filter Fine sand, coarse sand, silex, pebbles media, n) Filtering & support media for carbon filter Activated carbon media (o) DG Set , etc and any consumable spares deemed necessary as per site reqiurement.The quoted rate shall be inclusive of replacement of consumalble spares,necessary chemicalsrequired for operation and daily maintenace of STP complete all as specified and directed. |
| 50 | Note for Sch. Item No 31, 32, 33 & 34:- (1) (a) Operating Pump sets of any capacity as directed (b)Checking sewage level in the STP. (c) Maintaining Log Book for STP (e) Maintaining record of timing of STP operation (f) Operating Sluice/Gate Valves located within 1 KM from the STP for Supply of treated water to garden/MT vehicle washing as per the time schedule/requirement. (g) Routine maintenance & cleaning/back washing of filteration plant. (h) Carrying out necessary measure to achieve parameters of STP treated water as per Standards for Discharge of STP should be are as follows:- (a) pH 6.5 - 8.5(b) COD <30 mg/L (c) BOD <10 mg/L (d) TSS <10 mg/L (e) Total Nitrogen 10 mg/L (f) Total Phosphorus 1 mg/L (g) Fecal Coliform Nil (h) Odour No foul odour and latest as per latest CPHEEO Manual for Sewerage and Sewage Disposal (j) Operation of DG Set etc (k) Inspect equalization tank/entry to system for blockages, plastics etc and remove. (m) Inspect aerator and note biomass growth, recirculation and any malodour. (n) Grease for all bearings. (o) Drain gearbox oil and replaceAlso check holding plate bolts.(p) Check shaft for wear and alignment. (q) Check all bearings for wear and tear, check all bolts for tightness and check chain coupling and check bolts for tightness. (r) Check motor for overheating (by touch) and remove dust etc. from air fins,grease all bearings through nipples,grease all chain couplings through casing nipples, check oil level in gearbox and top up if necessary,check sludge return system from humus tank for function,apply light lubricating oil in small quantities to locks and hinges,preparing & submitting monthly report on performance of the plant |
| 51 | (2) EQUIPMENTS :(a) (i)Starter Panel - 01 No (b)20 kVA DG set- 01 Nos (c) pH correction Dosing System Pump -01(d) Blower for Equalisation tank -02 Nos(e) Lamella Feed Pump non submersible type - 02 Nos (f) Coagulant Dosing System of 01 nos pump (g) Flocculant dosing System of 01 nos pump (h) Static mixer & Flocculation Tank (j) Static mixer & Flocculation Tank - 01 Set (k) Lamella Clarifier - 01 set (l) Sludge Transfer Pump (m) MBBR feed pump type non submersible - 02 set (n) Air Blower of qty 02 nos (o) Sludge Pump MBBR - 01 (p) Chlorine dosing system pump - 01 No (q) Filter Feed pump - 02 Nos (r) Sludge Transfer (Sewage Lift Well) Pump (s) Treated water transfer pumps - 02 Nos (t) Instruments - 1 lot (u) Connecting Valves of various type/sizes (v) Consumable items (chemicals )for treatment.(w) Raw/Treated water test should be monthly from NABL approved lab andtest report shoul be submitted last day of every month.(3) (i) Contractor shall submit ID proof, residential proof, bank A/C details to department and obtain approval of Engineer-in-Charge before employing a person as operator.(ii) Plant operator shall be available as per the shift timings specified in the tender and he will report to JE E/M in-ChargeIn case of emergency he will function according to their direction.If he is found absent or move without intimating to in-Charge or JE E/M he will be treated as absent for the said shift and recovery of Rs 1500/-per shift shall be affected.(iii) Payment as per quoted rate shall also be deducted in addition to the penalty as specified above. (iv) Contractor shall submit the labour licenece VAT & Copy of GST Regn registered number issued by concerned authority.(v) The payment shall be made to employees on or before 10th of every calender month.Payment to employees shall be done by crossed cheque / RTGS / NEFT / IMPS through Aadhar card linked Bank Account only and it shall not be less than minumum fair wages as per Act in vogue (vi) The rate quoted by the contractor shall be inclusive of life insurance for the tradesmen employed by him in case of untoward incident such as injuries fracture or casualty while on duty(vii) Surprise check will be carried out by department representative and if any employes is not available at his working place, he will be treated as absent. |
| 52 | (viii)Contractor has to submit the list of employees including reserve alongwith police verification, Aadhar card, Aadhar card linked Bank Account No and relevant documents as mentioned in PS to the Engineer-in-Charge alongwith performance security before issue work order.(ix)Contractor has to submit proof of payment of EPF subscription made by his alongwith RAR failing which RAR will not be progressed for payment(x)Contractor has to employ the number of labours per day as intimated by the Engineer-in-Charge for which he has to make alternative arrangement. (xi) The rates quoted by the contractor shall be deemed to be included provision of all latest labour laws / regulations including all relevant taxes as applicable.(xii)Contractor shall quote the rates considering their monthly leaves, releiver etc as per labour laws and nothing extra shall be paid on account of the above. In case of absence of staff/tradesman from duty, payment of that day will not be paid. In addition to that a penalty of Rs 1500/- per day per person will be recovered from contractors dues.Also in case of long absence (more than one week) of staff/tradesman, the penalty shall be recovered including Sundays & Holidays if any.The contractor shall have no claim on this account.(xiii) Contractor has to supply two sets of Tools and Plants (as applicable) to the labours employed by him and should be placed with the safe custody of department.Rates quoted shall be deemed to be included the above provision. |
| 53 | Testing of water before and after treatment of Sewage through NABL accredited lab for following parameters:-(i) Suspended Solids (ii) Particle size of Suspended solid (iii) Dissolved solids (inorganic) (iv) pH value (v) Oil & Grease (vi) Total Residual Chlorine (vii) Ammonical Nitrogen (as N) (viii) Total Nitrogen (as N) (ix) Free Ammonia (as NH3) (x) Biochemical Oxygen Demand (xi) Chemical Oxygen Demandand test report shoul be submitted last day of every month. |
| 54 | THIRD YEAR |
| 55 | Manning & Operation ofSewage treatment plant of capacity 75 KLD at AVA Hill Area, consisting of following equipments & Electrical Panel boards etc. by employing one OEM Trained FGM Per Shift of 8 hrs for 3 Shifts, 24 Hrs per day, (0600 Hrs to 1400 Hrs First Shift and 1400 to 2200 Hrs Second Shift & 2200 Hrs to 0600 Hrs Third shift) including Sundays & Holidays andincluding replacement of consumable spares like a) Gaskets, b) Gland Packing, c) O-Rings, d) Drive belt for air blower, e) Drive belts for centrifuge at clarifier, f) Electrical accessories, g) Indication bulbs, h) Fuses, j) Blades, k) Pipe fixing solution &Adhesives, m) Filtering & support media for sand filter Fine sand, coarse sand, silex, pebbles media, n) Filtering & support media for carbon filter Activated carbon media (o) DG Set , etc and any consumable spares deemed necessary as per site reqiurement.The quoted rate shall be inclusive of replacement of consumalble spares,necessary chemicals complete all as specified and directed. |
| 56 | Manning & Operation ofSewage treatment plant of capacity 75 KLD at AVA Hill Area, consisting of following equipments & Electrical Panel boards etc. by employing one OEM Trained Helper Per Shift of 8 hrs for 3 Shifts, 24 Hrs per day, (0600 Hrs to 1400 Hrs First Shift and 1400 to 2200 Hrs Second Shift & 2200 Hrs to 0600 Hrs Third shift) including Sundays & Holidays andincluding replacement of consumable spares like a) Gaskets, b) Gland Packing, c) O-Rings, d) Drive belt for air blower, e) Drive belts for centrifuge at clarifier, f) Electrical accessories, g) Indication bulbs, h) Fuses, j) Blades, k) Pipe fixing solution &Adhesives, m) Filtering & support media for sand filter Fine sand, coarse sand, silex, pebbles media, n) Filtering & support media for carbon filter Activated carbon media (o) DG Set , etc and any consumable spares deemed necessary as per site reqiurement.The quoted rate shall be inclusive of replacement of consumalble spares,necessary chemicalsrequired for operation and daily maintenace of STP complete all as specified and directed. |
| 57 | 1Manning & Operation ofSewage treatment plant of capacity 65 KLD at Mandir View Area, consisting of following equipments & Electrical Panel boards etc. by employing one OEM Trained FGM Per Shift of 8 hrs for 3 Shifts, 24 Hrs per day, (0600 Hrs to 1400 Hrs First Shift and 1400 to 2200 Hrs Second Shift & 2200 Hrs to 0600 Hrs Third shift) including Sundays & Holidays andincluding replacement of consumable spares like a) Gaskets, b) Gland Packing, c) O-Rings, d) Drive belt for air blower, e) Drive belts for centrifuge at clarifier, f) Electrical accessories, g) Indication bulbs, h) Fuses, j) Blades, k) Pipe fixing solution &Adhesives, m) Filtering & support media for sand filter Fine sand, coarse sand, silex, pebbles media, n) Filtering & support media for carbon filter Activated carbon media (o) DG Set , etc and any consumable spares deemed necessary as per site reqiurement.The quoted rate shall be inclusive of replacement of consumalble spares,necessary chemicals complete all as specified and directed. |
| 58 | Manning & Operation ofSewage treatment plant of capacity 65 KLD at Mandir View Area, consisting of following equipments & Electrical Panel boards etc. by employing one OEM Trained Helper Per Shift of 8 hrs for 3 Shifts, 24 Hrs per day, (0600 Hrs to 1400 Hrs First Shift and 1400 to 2200 Hrs Second Shift & 2200 Hrs to 0600 Hrs Third shift) including Sundays & Holidays andincluding replacement of consumable spares like a) Gaskets, b) Gland Packing, c) O-Rings, d) Drive belt for air blower, e) Drive belts for centrifuge at clarifier, f) Electrical accessories, g) Indication bulbs, h) Fuses, j) Blades, k) Pipe fixing solution &Adhesives, m) Filtering & support media for sand filter Fine sand, coarse sand, silex, pebbles media, n) Filtering & support media for carbon filter Activated carbon media (o) DG Set , etc and any consumable spares deemed necessary as per site reqiurement.The quoted rate shall be inclusive of replacement of consumalble spares,necessary chemicalsrequired for operation and daily maintenace of STP complete all as specified and directed. |
| 59 | Note for Sch. Item No 31, 32, 33 & 34:- (1) (a) Operating Pump sets of any capacity as directed (b)Checking sewage level in the STP. (c) Maintaining Log Book for STP (e) Maintaining record of timing of STP operation (f) Operating Sluice/Gate Valves located within 1 KM from the STP for Supply of treated water to garden/MT vehicle washing as per the time schedule/requirement. (g) Routine maintenance & cleaning/back washing of filteration plant. (h) Carrying out necessary measure to achieve parameters of STP treated water as per Standards for Discharge of STP should be are as follows:- (a) pH 6.5 - 8.5(b) COD <30 mg/L (c) BOD <10 mg/L (d) TSS <10 mg/L (e) Total Nitrogen 10 mg/L (f) Total Phosphorus 1 mg/L (g) Fecal Coliform Nil (h) Odour No foul odour and latest as per latest CPHEEO Manual for Sewerage and Sewage Disposal (j) Operation of DG Set etc (k) Inspect equalization tank/entry to system for blockages, plastics etc and remove. (m) Inspect aerator and note biomass growth, recirculation and any malodour. (n) Grease for all bearings. (o) Drain gearbox oil and replaceAlso check holding plate bolts.(p) Check shaft for wear and alignment. (q) Check all bearings for wear and tear, check all bolts for tightness and check chain coupling and check bolts for tightness. (r) Check motor for overheating (by touch) and remove dust etc. from air fins,grease all bearings through nipples,grease all chain couplings through casing nipples, check oil level in gearbox and top up if necessary,check sludge return system from humus tank for function,apply light lubricating oil in small quantities to locks and hinges,preparing & submitting monthly report on performance of the plant |
| 60 | (2) EQUIPMENTS :(a) (i)Starter Panel - 01 No (b)20 kVA DG set- 01 Nos (c) pH correction Dosing System Pump -01(d) Blower for Equalisation tank -02 Nos(e) Lamella Feed Pump non submersible type - 02 Nos (f) Coagulant Dosing System of 01 nos pump (g) Flocculant dosing System of 01 nos pump (h) Static mixer & Flocculation Tank (j) Static mixer & Flocculation Tank - 01 Set (k) Lamella Clarifier - 01 set (l) Sludge Transfer Pump (m) MBBR feed pump type non submersible - 02 set (n) Air Blower of qty 02 nos (o) Sludge Pump MBBR - 01 (p) Chlorine dosing system pump - 01 No (q) Filter Feed pump - 02 Nos (r) Sludge Transfer (Sewage Lift Well) Pump (s) Treated water transfer pumps - 02 Nos (t) Instruments - 1 lot (u) Connecting Valves of various type/sizes (v) Consumable items (chemicals )for treatment.(w) Raw/Treated water test should be monthly from NABL approved lab andtest report shoul be submitted last day of every month.(3) (i) Contractor shall submit ID proof, residential proof, bank A/C details to department and obtain approval of Engineer-in-Charge before employing a person as operator.(ii) Plant operator shall be available as per the shift timings specified in the tender and he will report to JE E/M in-ChargeIn case of emergency he will function according to their direction.If he is found absent or move without intimating to in-Charge or JE E/M he will be treated as absent for the said shift and recovery of Rs 1500/-per shift shall be affected.(iii) Payment as per quoted rate shall also be deducted in addition to the penalty as specified above. (iv) Contractor shall submit the labour licenece VAT & Copy of GST Regn registered number issued by concerned authority.(v) The payment shall be made to employees on or before 10th of every calender month.Payment to employees shall be done by crossed cheque / RTGS / NEFT / IMPS through Aadhar card linked Bank Account only and it shall not be less than minumum fair wages as per Act in vogue (vi) The rate quoted by the contractor shall be inclusive of life insurance for the tradesmen employed by him in case of untoward incident such as injuries fracture or casualty while on duty(vii) Surprise check will be carried out by department representative and if any employes is not available at his working place, he will be treated as absent. |
| 61 | (viii)Contractor has to submit the list of employees including reserve alongwith police verification, Aadhar card, Aadhar card linked Bank Account No and relevant documents as mentioned in PS to the Engineer-in-Charge alongwith performance security before issue work order.(ix)Contractor has to submit proof of payment of EPF subscription made by his alongwith RAR failing which RAR will not be progressed for payment(x)Contractor has to employ the number of labours per day as intimated by the Engineer-in-Charge for which he has to make alternative arrangement. (xi) The rates quoted by the contractor shall be deemed to be included provision of all latest labour laws / regulations including all relevant taxes as applicable.(xii)Contractor shall quote the rates considering their monthly leaves, releiver etc as per labour laws and nothing extra shall be paid on account of the above. In case of absence of staff/tradesman from duty, payment of that day will not be paid. In addition to that a penalty of Rs 1500/- per day per person will be recovered from contractors dues.Also in case of long absence (more than one week) of staff/tradesman, the penalty shall be recovered including Sundays & Holidays if any.The contractor shall have no claim on this account.(xiii) Contractor has to supply two sets of Tools and Plants (as applicable) to the labours employed by him and should be placed with the safe custody of department.Rates quoted shall be deemed to be included the above provision. |
| 62 | Testing of water before and after treatment of Sewage through NABL accredited lab for following parameters:-(i) Suspended Solids (ii) Particle size of Suspended solid (iii) Dissolved solids (inorganic) (iv) pH value (v) Oil & Grease (vi) Total Residual Chlorine (vii) Ammonical Nitrogen (as N) (viii) Total Nitrogen (as N) (ix) Free Ammonia (as NH3) (x) Biochemical Oxygen Demand (xi) Chemical Oxygen Demandand test report shoul be submitted last day of every month. |
| SR No | FileName | File Description |
| 1 | Click here to download tender document | Tender Documents |
| 2 | Click here to download tender document | Tender Documents |
| 3 | Click here to download tender document | Tender Documents |
| 4 | Click here to download tender document | Tender Documents |
| 5 | Click here to download tender document | Tender Documents |
| 6 | Click here to download tender document | Tender Documents |
Copyright © 2026 · All Rights Reserved. Terms of Usage | Privacy Policy
For Tender Information Services Visit : TenderDetail