|
| 1 | Lifting out of Unsv non clogging submersible pumping set,05 to 12 HP including Colum pipe submersible cable only any size and type from the underground main sump /Open Well with the help of chain pulley manually operated by own arrangement of the contractor with and including loading, unloading and transporting from STP installation to civil work shop and bringing back after repair from the civil workshop to STP. as specified & directedNote:-(a) Cost of necessary T&P/crane required for taking out & fixing of the pump set from the underground sump are deemed to be included in this item. (b) The necessary repairs of the pump set shall be carried out by the authorised and approved agency at their workshop and quoted rates by the contractor for above item includes the transportation charges of pump set to and for workshop. (c) The replacement of new part carried out in the pump set shall be measured and paid for separately under work measured appropriate item of Schedule `A\".(d) Quoted rates shall be inclusive of all safety precaution and necessary equipment\"s required for entering into sump |
| 2 | Lowering down of the non-clogging submersible / pumping set, after repair of any description and any capacity & in any position, in UG sump Open well along with column pipe 80/50mm Dia and submersible cable of any size (approximately 10 mtr depth of pump set from GL including Colum pipe submersible cable only any size and type) complete all as specified and directed by Engineer-in-Charge including making necessary electric connections pipe connection & testing the pump set after lowering.NOTE:1.Contractor shall take proper precautions while lowering pump set in Open well so as to avoid any damage to column pipe and submersible cable.All necessary T&P and equipment\"s required for lowering down pump set etc shall be arranged by the contractor at his own cost. 2. Rates quoted by the contractor for the above item includes the cost of assembling & connecting pump set to column pipes & assembling, jointing and fixing column pipes/pump sets/submersible cable and making necessary connections and including reconnecting water supply system. The required materials like column pipes/ /submersible cable/pump sets etc (new/old retrieved materials) shall be provided by the department to contractor for fixing and lowering in open wells |
| 3 | Cutting and taking out existing burnt out unserviceable copper winding from the stator unit of submersible motor of 10 /12 HP capacity, 3 phase, 415 volts,Non clogging Submersible pump set Cleaning of slots and complete stator unit with using carbon tetra chloride (CTC solution), material and labour for rewinding the motor with using super enamelled copper wire of existing size / gauge including providing bi-metallic thermal overload protection and all necessary insulating Materials such as varnish, insulating paper, sleeves etc complete all as specified & directed. |
| 4 | Description all as per item No 3 above , but pump &motors of capacity 5/7.5HP |
| 5 | Supply only the following items/ parts suitable for existing make and model of non-clogging submersible electric Motor and pump sets 10 /12 HP, model No KDS10MS100 repaired under Schedule `A\" item No 01 here-in-before. The fixing element of these items is deemed to be included under Schedule `A\" item No 1above. |
| 6 | Hard metal upper mechanical seal assembly |
| 7 | Hard metal lower mechanical seal assembly pump side |
| 8 | Ball bearings, self lubricating and antifriction type,upper |
| 9 | Over size double row ball bearings, self lubricating and antifriction type, |
| 10 | Water tight cable terminal block with cable sleeve and strain relief.(Note: - Rates for water tight cable joints with cable sleeve are included in this item.) |
| 11 | Single vane non clog design dynamically balanced cast iron impeller as per IS- 210Gr, FG -260 |
| 12 | Moisture sensor (electronic seal monitor) with visual and audible signals |
| 13 | M & L for motor lamination setting with material |
| 14 | M & L for rotor reconditioning as per requirements including fully polishing completed. |
| 15 | Slot repairing in stator as per requirements including fully polishing completed. |
| 16 | M & L for repairing of the high carbon steel shaft as per requirements including fully polishing completed. |
| 17 | M & L for repairing and reconditioning of the terminal plate |
| 18 | Description all as per item No 5 above but for 5 to 7.5HP motors :- |
| 19 | Hard metal upper mechanical seal assembly |
| 20 | Hard metal lower mechanical seal assembly pump side |
| 21 | Ball bearings, self lubricating and antifriction type. |
| 22 | Over size double row ball bearings, self lubricating and antifriction type,lower |
| 23 | Water tight cable terminal block with cable sleeve and strain relief.(Note : - Rates for water tight cable joints with cable sleeve are included in this item.) |
| 24 | Single vane non clog design dynamically balanced cast iron impeller as per IS- 210Gr, FG -260 |
| 25 | Moisture sensor (electronic seal monitor) with visual and audible signal |
| 26 | M & L for motor lamination setting with material |
| 27 | M & L for rotor reconditioning as per requirements including fully polishing completed. |
| 28 | M & L for slot repairing in stator as per requirements including fully polishing completed. |
| 29 | Repairing of the high carbon steel shaft as per requirements including fully polishing completed. |
| 30 | M & L for repairing and reconditioning of the terminal plate |
| 31 | Supply only lubricating oil suitable for submersible motor ofMAKE:- BPCL(Hydrol 46/turbol 46)/PCL(Hylubex-30)/IOL(Servo super 10) |
| 32 | Supply only Gear oil suitable for submersible motor ofMAKE:- BPCL/HPCL/IOC |
| 33 | M&L For Lab Testingreport of sewage water to check the BOD;COD TSS, Total phosphorus, PH, Total Nitrogen, AmmoniacalNitrogen , FC&N Value of Treated water,& Chemical Oxygen Demand and Bacterial Oxygen Demand from NABL etc complete all as specified & directed Note :- Rate for collection of water sample from Sewage treatment plant in their own container and carrying it to the Lab is included in the above item. |
| 34 | M&L for carrying out maintenance /comprehensive servicing of Air compressorCapacity 10 HP air pressure up to 8 Kg/Sq. communalised in canopy ,directly or belt driven having Air receiver tank ,Microprocessor controlled with a scope of work checking the serviceability of compressor and its each component/controls , electric motor ,starter ,panels etc, filters ,oils, moisturetrap/oil trap/Air governors etc and repairing /replacement of defective parts cleaning the complete system, oiling , greasingwhere ever required and made the compressor functional in all respect including Painting of Compressor, Motor, & pipe line, automatic stop and operation all as specified and directed.Note: - (I) Oil and defective parts shall be measured & paid separately. (ii) The repairing/servicing will be carried out by qualified and highly skilled mechanics/technician well conversant with air compressor repairs. |
| 35 | Supply only following spare parts suitable for Air Compressors as specified in item No. 10 here in before complete all as specified and directed. Suction valve assembly |
| 36 | Element Filter |
| 37 | Gasket set complete |
| 38 | O ring for suction lantern |
| 39 | Piston ring set of 4 rings standard size |
| 40 | Roter |
| 41 | Bearing |
| 42 | Shaft |
| 43 | Bearing housing |
| 44 | Oil cap |
| 45 | (m) Fan belt size B1567 LPB60\"Note :Cost of labour for fixing element of above items from 11 to 11.10 is included under Schedule `A\" item No 10 above) |
| 46 | Cutting and taking out old/burnt winding from the stator of 10 HP induction motor and cleaning of stator with CTC solution and rewinding the induction electric motor with super enamelled heavy-duty winding wire existing gauge and existing Nos of turn with and including insulation material insulation paper, varnish and baking up till the complete insulating dried. all as specified and directed. |
| 47 | Supply and filling and replacement old unserviceable Recap prime compressor oil with new Recap prime compressor oil complete all as specified and directed. |
| 48 | Supply and fixing in repair PVC Courgeted Havey duty Hose Pipe50 mm Dia, complete with Jubly clamp, all as specified and directed. |
| 49 | Supply, laying, jointing and testing pvc insulated, unarmoured, PVC bedded LT CABLE 1100V grade copper conductor of cross-sectional area 10 Sqmm 4 core etc including taking out unservicable cable complete all as specified and directed. |
| 50 | Material & labour for MS clamps made out of MS flat 65mm x 8mm thick (high carbon forged steel) made to shape and size as required for 80/50mm column pipes with and including suitable nuts, bolts & washers etc complete all as specified and directed |
| 51 | Supply, laying, jointing and testing pvc insulated, unarmoured, PVC bedded LT CABLE 1100V copper conductor of cross-sectional area 4 Sqmm 4 core etc including taking out unservicable cable complete all as specified and directed. |
| 52 | Material & labour for water proof joint of submersible cable 3 core of any size using fine rubber and M Seal etc all as directed by Engineer -in-Charge. |
| 53 | Material & labour for MS flange suitable for 80mm bore pipe including nut ,volts, washer, rubber gasket etc complete all as specified & directed. |
| 54 | Taking down unsv centrifugal pump set any make7.5 Hp capacityand transporting to civil work shop with and including loading and unloading and dismantling electric motor and pump set taking out old unsv parts from the centrifugal pump set such as bearing cartridge DE and NDE side, impeller Ist stage and 2nd stage , pump shaft etc and bringing back from the civil work shop Overhauling , insulated pump set its original position with and including minor spares such as nuts, bolts, and washers and testing complete all as specified and directed. |
| 55 | Cutting and taking out old/burnt winding from the statorof7.5 HP induction motor and cleaning of stator with CTC solution and rewinding the induction electric motor with super enamelled heavy duty winding wire existing gauge and existing Nos of turn with and including insulation material insulation paper, varnish and baking up till the complete insulating dried. all asspecified and directed. |
| 56 | Supply only the following items for centrifugal pump set7.5 HP capacity repaired under Schedule `A\"/BOQ item No 21.00 here-in-before.Note:- The taking out and fixing element of these items is deemed to be included under Schedule `A\"/BOQ item No 21.00 :- |
| 57 | (a) Impeller Ist stage made of bronze |
| 58 | (b) Impeller 2nd stage made of bronze |
| 59 | (c) Pump shaft high carbon steel |
| 60 | (d) Ball bearing DE 6307 Make : SKF |
| 61 | (e) Ball bearing NDE 3307 Make: SKF |
| 62 | (f)Interstage ring |
| 63 | (g) Gland DE/NDE |
| 64 | (h) Lantern ring |
| 65 | (j)Water deflector DE/NDE |
| 66 | (k) Impeller Key |
| 67 | (l)Couplingset complete |
| 68 | Supply fixingPower Contactor MN32 suitable for 50Hz, 3 Phase, 415 Volts AC supply complete all as specified and directed. |
| 69 | Taking down star- delta starter any make and capacity and S&F deluxe automatic star-delta submersible pump starter MU-G20 FASD Three Phase Submersible Controller with Single Phase Preventer and Amp Volt Meter complete all as specified and directed. |
| 70 | Taking down star- delta starter any make and capacity and S&F deluxe automatic star-delta submersible pump starter MU-G30 FASD Three Phase Submersible Controller with Single Phase Preventer and Amp Volt Meter complete all as specified and directed. |
| 71 | Dismantling taking out old UNSV over Voltage protection relay of any size and S&F Voltage protection relay with adjustable setting and protection of unbalance, phase failure, under voltage, over voltage type VMRD2, complete all as specified and directed. |
| 72 | Earth work by mechanical means (Hydraulic excavator for clearing and leakage of STP Pipe) in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 complete all as specified and directed. |
| 73 | Returning, filling in, excavated soil including levelling, watering and well ramming in layers of thickness not exceeding 25 cm in each layer complete all as specified and directed. |
| 74 | Removing excavated material n exc 50m and depositing where directed at a level n exc 1.5m above the starting point. |
| 75 | Cleaning of chocked /blocked sewage lines of any bore, of any description and in any position by taking out loose sediment sand, grit, ash, sludge, rags, fibbers or vegetation fromthe depth upto 1.5 m of sewage lineor by rodding/by mechanical means and well flushing with adequate waterincluding removal of sludge/debris to a distance exc 250 m but next 500m and buried under groundcomplete all asspecified and as directed. |
| 76 | Supply and fix in repair 50 mm Dia Butter fly valves confirming to IS-13095 (including flanges & All other accessories) complete all as specified anddirected by Engr in charge. |
| 77 | S&F in repair Non return valve 50 mmbore with all Jointing materials including taking down old/unserviceable one complete all as specified and directed. |
| 78 | M&L for Surface dressing n exc15 cm deep getting out on soft/loose soil including site clearance by cutting of shrubs, cutting of grass, bush weed, trees, sapling not exceeding in 30cm girth and removal of grass with roots and leveling area,making clean surroundig of pump houses twice in the contract period complete with the entire satisfaction of Engineer-in-charge. Note:-Quoted rate is deemed to be included for twice in contract period and will be measured as one unit cleaning site clearance of STP. Note:-(I)Grass/vegetation / surface excavation work will be carried out 4 times in a contract period as and when required/asked by the Engineer-in-charge .(ii)All Necessary T&P used for vegetation shall be arrange b the contractor. (iii) Payment will be done once after forth site clearance only. |
| 79 | M&L for Dewatering of Balance chamber and Equivalence tank, valve pit chamberan intermediate tank/well by means of pumping with the pump capacity not less than 350 LPM with and including required fuel, lubricant and operator all as specified and directed. Note:-I) Necessary T& P and man power shall be provided by the contractor without any Extra cost. |
| 80 | Taking out sludge etc after emptying/dewateringBalance chamber tank/sump Size 10X10 Mtr and Depth 10 Mtr, 01 No, of Pinto park STP, , by manually/mechanically or other method by removing all loose and sedimented sand, sludge, grit, ash, rages, fibbers and string materials etc from the tank anddisposal there of toa distance not less than 1.5Km complete all as specified and as directed. Note:- (I) Contractor shall depute only skilled labour which are the expertise in the field of cleaning of septic tank/ main sewage sump.(ii)Contractor shall ensure all safety measure before cleaning of sewage network.(iii) Dewatering/emptying waste water if required shall be measured and paid separately.(iv) Necessary T&P shall be arrange by the contractor.(v) The period of cleaning of one tank maximum 21 days from the date of handover to site other wise compensation of Rs 200/- per day imposed on contractor up to next 15 days there after 500/- per day. |
| 81 | Taking out sludge etc after emptying/dewateringBalance chamber tank/sump Size 10X10 Mtr and Depth 10 Mr, 01 No, of Chamble complex STP , by manually/mechanically or other method by removing all loose and sedimented sand, sludge, grit, ash, rages, fibbers and string materials etc from the tank anddisposal there of toa distance not less than 1.5Km complete all as specified and as directed. Note:- (I) Contractor shall depute only skilled labour which are the expertise in the field of cleaning of septic tank/ main sewage sump.(ii)Contractor shall ensure all safety measure before cleaning of sewage network.(iii) Dewatering/emptying waste water if required shall be measured and paid separately.(iv) Necessary T&P shall be arrange by the contractor.(v) The period of cleaning of one tank maximum 21 days from the date of handover to site other wise compensation of Rs 200/- per day imposed on contractor up to next 15 days there after 500/- per day. |
| 82 | Taking out sludge etc after emptying/dewateringBalance chamber tank/sump Size 10X10 Mtr and Depth 10 Mtr, 01 No, of Bhind Bihar(B Flt) STP , by manually/mechanically or other method by removing all loose and sedimented sand, sludge, grit, ash, rages, fibbers and string materials etc from the tank anddisposal there of toa distance not less than 1.5Km complete all as specified and as directed. Note:- (I) Contractor shall depute only skilled labour which are the expertise in the field of cleaning of septic tank/ main sewage sump.(ii)Contractor shall ensure all safety measure before cleaning of sewage network.(iii) Dewatering/emptying waste water if required shall be measured and paid separately.(iv) Necessary T&P shall be arrange by the contractor.(v) The period of cleaning of one tank maximum 21 days from the date of handover to site other wise compensation of Rs 200/- per day imposed on contractor up to next 15 days there after 500/- per day. |
| 83 | Taking out sludge etc after emptying/dewateringEquivalence Chamber/ tank/ Size 5XX5 Mtr and Depth 10 Mtr, 01 No, of Pinto park STP, , by manually/mechanically or other method by removing all loose and sedimented sand, sludge, grit, ash, rages, fibbers and string materials etc from the tank anddisposal there of toa distance not less than 1.5Km complete all as specified and as directed. Note:- (I) Contractor shall depute only skilled labour which are the expertise in the field of cleaning of septic tank/ main sewage sump.(ii)Contractor shall ensure all safety measure before cleaning of sewage network.(iii) Dewatering/emptying waste water if required shall be measured and paid separately.(iv) Necessary T&P shall be arrange by the contractor.(v) The period of cleaning of one tank maximum 15 days from the date of handover to site other wise compensation of Rs 200/- per day imposed on contractor up to next 15 days there after 500/- per day. |
| 84 | Taking out sludge etc after emptying/dewateringEquivalence Chamber/ tank/ Size 5XX5 Mtr and Depth 10 Mtr, 01 No, of Chamble Complex STP, , by manually/mechanically or other method by removing all loose and sedimented sand, sludge, grit, ash, rages, fibbers and string materials etc from the tank anddisposal there of toa distance not less than 1.5Km complete all as specified and as directed. Note:- (I) Contractor shall depute only skilled labour which are the expertise in the field of cleaning of septic tank/ main sewage sump.(ii)Contractor shall ensure all safety measure before cleaning of sewage network.(iii) Dewatering/emptying waste water if required shall be measured and paid separately.(iv) Necessary T&P shall be arrange by the contractor.(v) The period of cleaning of one tank maximum 21 days from the date of handover to site other wise compensation of Rs 200/- per day imposed on contractor up to next 15 days there after 500/- per day. |
| 85 | Taking out sludge etc after emptying/dewateringEquivalence Chamber/ tank/ Size 5XX5 Mtr and Depth 10 Mtr, 01 No, of Bhind Bihar( B Flt) STP,by manually/mechanically or other method by removing all loose and sedimented sand, sludge, grit, ash, rages, fibbers and string materials etc from the tank anddisposal there of toa distance not less than 1.5Km complete all as specified and as directed. Note:- (I) Contractor shall depute only skilled labour which are the expertise in the field of cleaning of septic tank/ main sewage sump.(ii)Contractor shall ensure all safety measure before cleaning of sewage network.(iii) Dewatering/emptying waste water if required shall be measured and paid separately.(iv) Necessary T&P shall be arrange by the contractor.(v) The period of cleaning of one tank maximum 21 days from the date of handover to site other wise compensation of Rs 200/- per day imposed on contractor up to next 15 days there after 500/- per day. |
| 86 | Taking out sludge etc after emptying/dewateringintermediate sump/Well Size 5Mtr Dia and Depth 10 Mtr,01 No at (B Flt) STP,cleaning of01 Sewage well, by manually/mechanically or other method by removing all loose and sedimented sand, sludge, grit, ash, rages, fibbers and string materials etc from the tank anddisposal there of toa distance not less than 1.5Km complete all as specified and as directed. Note:- (I) Contractor shall depute only skilled labour which are the expertise in the field of cleaning of septic tank/ main sewage sump.(ii)Contractor shall ensure all safety measure before cleaning of sewage network.(iii) Dewatering/emptying waste water if required shall be measured and paid separately.(iv) Necessary T&P shall be arrange by the contractor.(v) The period of cleaning of one tank maximum 21 days from the date of handover to site other wise compensation of Rs 200/- per day imposed on contractor up to next 15 days there after 500/- per day. |
| 87 | Taking out sludge etc after emptying/dewateringintermediate sump/Well Size 5Mtr Dia and Depth 10 Mtr,01 No at Bhind bihar,cleaning of01 Sewage well, by manually/mechanically or other method by removing all loose and sedimented sand, sludge, grit, ash, rages, fibbers and string materials etc from the tank anddisposal there of toa distance not less than 1.5Km complete all as specified and as directed. Note:- (I) Contractor shall depute only skilled labour which are the expertise in the field of cleaning of septic tank/ main sewage sump.(ii)Contractor shall ensure all safety measure before cleaning of sewage network.(iii) Dewatering/emptying waste water if required shall be measured and paid separately.(iv) Necessary T&P shall be arrange by the contractor.(v) The period of cleaning of one tank maximum 21 days from the date of handover to site other wise compensation of Rs 200/- per day imposed on contractor up to next 15 days there after 500/- per day. |
| 88 | Taking out sludge etc after emptying/dewateringintermediate sump/Well Size 5Mtr Dia and Depth 10 Mtr,01 No at Chamble complex ,cleaning of Sewage well/intermediate tank, by manually/mechanically or other method by removing all loose and sedimented sand, sludge, grit, ash, rages, fibbers and string materials etc from the tank anddisposal there of toa distance not less than 1.5Km complete all as specified and as directed. Note:- (I) Contractor shall depute only skilled labour which are the expertise in the field of cleaning of septic tank/ main sewage sump.(ii)Contractor shall ensure all safety measure before cleaning of sewage network.(iii) Dewatering/emptying waste water if required shall be measured and paid separately.(iv) Necessary T&P shall be arrange by the contractor.(v) The period of cleaning of one tank maximum 21 days from the date of handover to site other wise compensation of Rs 200/- per day imposed on contractor up to next 15 days there after 500/- per day. |
| 89 | Taking out sludge etc after emptying/dewateringSoak well /sumpSize 35x70Mtrand Depth 5 Mtr,01 No at Bhind Bihar ,cleaning of SewageSoak well, by manually/mechanically or other method by removing all loose and sedimented , sludge, grit, ash, rages, fibbers and string materials etc from the tank anddisposal there of toa distance not less than 1.5Km complete all as specified and as directed. Note:- (I) Contractor shall depute only skilled labour which are the expertise in the field of cleaning of septic tank/ main sewage sump.(ii)Contractor shall ensure all safety measure before cleaning of sewage network.(iii) Dewatering/emptying waste water if required shall be measured and paid separately.(iv) Necessary T&P shall be arrange by the contractor. |
| 90 | Taking out existing Pavel\"s/ Gravels ,send, Sledge ,of any size(Sledge drying Bed filter media) for MBBR Based200KLDSTP Filter Total Three No,1- Pinto park ,2- Chamble Complex,3- Bhind Bihar(B Flt)STP , stacking the materials (size wise) where directed. Washing the Gravells/Pavel\"s thoroughly, sieving stacking size wise for re use of serviceable qty and removing unserviceable qty from site all as specified and directed. Note : The unit rate is deem to be included for necessary T & P and scaffolding required for lifting and removing from the filter beds. |
| 91 | Refilling (loose filling) of quartz gravels of size 10- 15mm ,filling in the Filter Bed of rapid gravity filter complete all as specified and directed |
| 92 | Refilling (loose filling) of quartz gravels of size 05- 10mmmm ,filling in the Filter Bed of rapid gravity filter. Complete all as specified and directed(Note for Gravels as obtained shall be re used and no void shall be considered for measurent) |
| 93 | Material & Labour for supplying, filling n testing Fresh quartz sand Arena of size 0,4mm to 0,8mm and coefficient of uniformity shall be between1.3 to 1.7,and silica content should be not less than 90%, filling in layers in the Filter Beds, complete all as specified and directed. |
| 94 | Taking out existingPVC MBBR Mediaand sledge, CompleteMBBRfilter chambers for MBBR Based 200 KLDSTP Filter Tanks of three sites 1- Pinto park , 2-Chamble Complex, 3-Bhind Bihar(B Flt)STP , stacking the materials (size wise) where directed. Washing the tank ,, sieving stacking size wise for re use of serviceable qty and removing unserviceable qty from site all as specified and directed. Note : The unit rate shall be included for necessary T & P and scaffolding required for lifting and removing MBBR Media from the filter beds. |
| 95 | S&F NewPVC MBBR Media from MBBR Based STP Filter Tank Capacity 200 KLD Each, Total three No STP, 1- Pinto park STP , 2-Chamble Complex, 3-Bhind Bihar(B Flt)STP , Filling the materials (size wise) where directed at site all as specified and directed. Note : The unit rate shall be included for necessary T & P and scaffolding required forthe filter beds. |
| 96 | Dewatering of water in sluice valve pit chamber by pump set/manually opening the sluice valve gland plate chamber filling the gland packing rope of size 6mm to 12m Dia as required and fixng the gland plate chamber in same position complete all as specified and directed by engineer in chargeNote : Necessary T&P used at site shall be arranged by the contractor with out any extra cost. |
| 97 | Supply & fixing in repairsgalvanized iron column pipe of 50 mm Dia medium grade (ISI marked) duly threaded both sides for sockets /flanges including provision of allnecessary fittings/ accessories complete all as specified and directed. |
| 98 | Supply & fixing in repairsgalvanized iron column pipe of 100 mm Dia medium grade (ISI marked) duly threaded both sides for sockets /flanges including provision of allnecessary fittings/ accessories complete all as specified and directed. |
| 99 | S&F fluorescent sign board size 1.8m x 0.90m made out of 24 gauge GI sheet and front covered with acrylic sheet total enclosed with computerised letter writings of size not less than 100mm as decided by Engineer-in-Charge and inside with 4 feet long 02 Nos of 18 Watt LED tube light fitting complete with time control switch, MCB and battery back up with timer and synchronised motor board including wiring should be fix on 40mm bore medium grade pipe pole.The height of board from ground level is 7 feet (up to top) and the bottom of the board is 4 feet.The mounting pole shall be embedded in PCC 1:2:4 type B-1 using 20mm graded aggregate of size 450x450x600mm with complete service connection of 2.50 Sqmm 3 core copper sheathed cable 10 metre long including protection pipe service connection from the pole by means of 25mm Dia light grade pipe to the boardincluding excavation, returning filling and removing out surplus soil, complete all as specified and directed. |