|
| 1 | Etectification of Court |
| 2 | Fixing & Installation of all Various Material (COMPLETE WORK) |
| 3 | CARTAGE OF 8.5 M / 1 STP POLES FROM STORE HAMIRPUR OR FROM ANY OTHER PLACE TO THE RESPECTIVE SITE OF WORK THROUGH THE KACHHA PACCA ROAD INCLUDING THE WORK OF ITS LOADING & UNLOADING AT THE RESPECTIVE ENDS ALSO INCLUDING ETC AND ALSO INCLUDING THE COST OF T&P CARRIER ETC REQUIRE FOR PROPER COMPLETION OF WORK. |
| 4 | CARTAGE OF LINE MATERIAL VIZ STONE PAD TOP CHANNEL DROPPER CHANNEL DISC INSULATOR AND OTHER MATERIAL FROM ESC/ASK STORE HAMIRPUR OR ANY OTHER PLACE TO THE RESPECTIVE SITE OF WORK THROUGH THE KACHHA PACCA ROAD INCLUDING THE WORK OF ITS LOADING & UNLOADING AT THE RESPECTIVE ENDS INCLUDING THE WORK OF ITS DRAGGING ETC AND ASLO INCLUDING THE COST OF LABOUR T&P AND CARRIER ETC REQUIRE FOR PROPER COMPLETION OF WORK. |
| 5 | ERECTION OF 8.5 M PCC / 11 M STP POLE SINGLE SUPPORT OF POLES INCLUDING COMPLETE HT/LT FITTING AS PER MANUAL AND AP PER DIRECTION OF ENGINEER IN CHARGE THE COST OF LABOUR T&P AND CARRIER ETC REQUIRE FOR PROPER COMPLETION OF WORK |
| 6 | ERECTION OF 8.5 M / 11 M STP POLE DOUBLE SUPPORT OF POLES INCLUDING COMPLETE HT /LT FITTING AS PER RESSPO MANUAL AND AS PER DIRECTION OF ENGINEER IN CHARGE THE COST OF LABOUR T&P AND CARRIER FOR PROPER COMPLETION OF WORK |
| 7 | GROUTING OF 8.5 M PCC / 11 M STP POLES AS POLES AS PER RESPO MANUAL AND AS PER DIRECTION OF ENGINEER. INCHARGE IT INCLUDED THE COST OF LABOUR T&P CARRIER ETC REQUIRED FOR PROPER COMPLETION OF WORK. THE SUPPORT SHALL BE GROUTED WITH CEMENT SAND & BRICKS/STONE BALLST IN RATION 1:4:8 INCLUDING THE COST OF ARRAGMENT OF CEMENT SAND BALLAST / STONE PAD ETC AS PER ACTUAL SITE REQUIRED |
| 8 | ERECTION & GROTING OF STAY SET AS PER RESSPO MANUL AND ALSO INCLUDING THE COST OF ALL GROUTING MATERIAL LABOUR & T&P ETC FOR PROPER COMPLTION OF WORK. |
| 9 | ERECTION OF EARTHING COMPLETE AS PER DIRECTION OF SUPERIVSING ENGINEER. IT INCLUDING THE COST OF LABOUR T&P CARRIER ETC REQUIRED FOR PROPER COMPLETION OF WORK. |
| 10 | LAYING, SAGGING, STRINGING, BINDING AND JUMP RING ETC ACSR WEASEL CONDUCTOR OLD/ NEW ON THE NEWLY ERECTED POLE OTHER PLACE AS PER RESSPO MANUAL AND AS PER DIRECTION OF SUPERVISING ENGINEER. |
| 11 | CARTAGE OF XLPE CABLE 3x120 SQMM, 3x185 SQMM & ARMOUNRED CABLE DIFFERENT SIZE STORE VENTRE TO WORK SITE |
| 12 | LAYING, SAGGING, STRINGING, BINDING ETC OF 11 KV XLPE 3x120 SQMM, 3x185 SQMM NEW ON THE NEWLY ERECTED POLE ANY OTHER PLACE AS PER RESSPO MANUAL AND AS PER DIRECTION OF SUPERVISING ENGINEER. |
| 13 | LAYING, SAGGING, STRINGING, BINDING ETC OF LT ARMOURED CABLE 3.5x70 & 3.5x120 SQMM NEW ON THE NEWLY ERECTED POLE ANY OTHER PLACE AS PER RESSPO MANUAL AND AS PER DIRECTION OF SUPERVISING ENGINEER. |
| 14 | THREE CHOOPING OF 11 KV LINE NEAR BY 11 KV HT LINE & LT LINE |
| 15 | FABRICATION OF 11 KV SUB STATION BASE ANGLE (16 MM HOLE 4NO EACH S/S BASE ANGLE) AS PER RESSPO DRAGGING WITH LOADING UNLOADING & CARATGE ALL COMPLETE WORK. |
| 16 | FEBRICATION OF 11 KV DROPPER CHANNEL (16 MM HOLE, 7 NO EACH DROPPER CHANNEL) AS PER RESSPO DRAGGING WITH LOADING UNLOADING & RATAGE ALL COMPLETE WORK. |
| 17 | FABRICATION OF 11 KV TOP CHANNEL ( 16 MM & HOLE 10 NO EACH TOP CHANNEL) AS PER RESSPO DRAGGING WITH LOADING, UNLOADING & CARATGE ALL COMPLETE WORK. |
| 18 | FEBRICATION OF T OFF CHANNEL 100x50x1300 ( 16 MM HOLE 8 NO EACH T OFF CHANNEL) AS PER RESSPO MANUAL DRAGGING WITH LOADING UNLOADING & CARATGE ALL COMPLETE WORK. |
| 19 | ERECTION OF 11 KV T OFF CHANEL 100x50x1300 AS PER RESSPO MANUAL DRAWING ALL COMPLETE WORK |
| 20 | SUPPLY OF DIFFERENT SIZE OF NUT & BOLT |
| 21 | SAFELY CARTAGE & INSTALLTION OF 16/25/100/250 KVA TRANSFOERMER ALL COMPLETE WORK |
| 22 | ERECTION & INSTALLTION OF DO FUSE SET (EACH 3 NOS) |
| 23 | ERECTION & INSTALLTION OF TPMO (EACH 3 NOS) |
| 24 | CARTAGE & ERECTION OF POLE MOUNTED UNIT ON D/P ( COMPLETE WORK.) |
| 25 | CARTAGE & ERECTION OF MAIN METERING SYSTEM ( COMPLETE WORK.) Please Enable Macros to View BoQ information |